Pellet Target developments

Slides:



Advertisements
Similar presentations
ALICE TPC Ne/CO2 Gas System. Mixing Rack CO 2 -Removal & (O 2,H 2 O)- Cleaning Rack.
Advertisements

Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Data acquisition and control system for HEDP experiments on FAIR and GSI. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Automation and Drives Vision Sensor SIMATIC VS 110 Image processing without the need for specialist knowledge.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Data acquisition system for experiments at GSI HHT experimental area. A. Kantsyrev 1, D. Varentsov 2, A. Hug 2, S. Udrea 2, L. Shestov 1, V. Turtikov 1.
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
ETRAX CRIS architecture and Xilinx FPGA Peter Zumbruch Experiment control systems group GSI (KS/EE)
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Milestone 1 Pablo Canseco Domenick Albanese Ronald­-Dean Allado Command and Control Subsystem for Regolith Mining Robot.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Gamma Beam System at ELI–NP The ELI–NP Team* ELI–NP, IFIN–HH, Bucharest–Magurele, Romania * The ELI–NP Gamma Beam System (GBS) will.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Combining safety and conventional interfaces for interlock PLCs
National Centre for Nuclear Research, Poland
P.Fedorets on behalf of the Pellet target group
High energy beam transport.
'FutureJet' Slow control system for targets
Status of the pellet target at ITEP
Beam diagnostics from GSI
STT Detector risk’s assessment
Current Status of IPM-Linac Control System
Experience & Status of the LIGO Slow Controls System(s)
ATF/ATF2 Control System
Performance of an Automated Water Based Cooling System for CBM MuCh
Southeastern Louisiana University
Summary of activities of the pellet target development
Development of the pellet target in ITEP
Status of the AGATA installation at GANIL
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
XFEL Vacuum System Commissioning
Project Members: M.Premraj ( ) G.Rakesh ( ) J.Rameshwaran ( )
Hall A Compton Electron detector overview
Cryogenic C&C Scope of work
FutureJet Cryogenic Jets of Nano- to Micrometer-Sized Particles for Hadron Physics From HP2 to HP3 HadronPhysics2 Meeting GSI, 3rd-4th November 2011.
Project planning and status (February 2018)
IHEP Cryomodule Status
Effective luminosity simulation for PANDA experiment
Advanced Research Electron Accelerator Laboratory
Pellet Target developments
Pellet target developments at ITEP
News from the Pellet target
X-Ray Endstations Update
Hands on Session
Project planning and status (May 2018)
Command and Data Handling
DOE Review 7-9 February, 2006 Steve Lewis
Commissioning the European XFEL cryogenic system and best practice
ThomX – Commissioning Meeting – 25/01/2018
Determining the Risk Level Regarding to the Positioning of an Exam Machine Used in the Nuclear Environment, based of polynomial regression Mihai OPROESCU1,
Building Services Controls
Presentation transcript:

Pellet Target developments A.Gerasimov, V.Chernetsky, M.Büscher, P.Fedorets, A. Kantsyrev, E. Lushchevskaia, V. Panyushkin, A. Bogdanov, A.Dolgolenko, P.Balanutsa, E.Ladygina, L.Gusev, S.Mineev, I.Tarasenko, V. Demekhin, S.Makagonov, D.Bogachenko, N.Kristi, V.Karasev Institute for Theoretical and Experimental Physics named by A.I. Alikhanov of National Research Centre «Kurchatov Institute» Moscow, Russia PANDA Meeting, Darmstadt, November 05-09, 2018

After transfer of the first prototype from FZJ to ITEP Transfer succeeded on the end of May. Activities: Papers for coming equipment Unpacking Assembling subsystems Testing subsystems

Subsystems for the second prototype hydrogen purifier system purifier Assembled Connected Tested for leakages pump

Subsystems for the second prototype vacuum chambers triple point chamber sluice generator condenser radiation protection shield cold transfer lines Cooler PT810 H2 input H2 for triple point chamber dumping system transportation tube scattering chamber beam dump system Assembled Tested for leakages dump chamber pump

Subsystems for the second prototype scattering chamber scattering chamber assembled with the diagnostic setup and the tube

Adjustment system elements System of linear actuator + stepper motor operated via L-CARD E14-140 controller 4 modules for four axes: 4 stepper motors - delivered 4 linear actuators - produced 4 mechanical support – produced software on Delphi prog. – done and tested Test with L-Card controller and Delphi prog. – done Installation on the Pellet target – in progress USB L-CARD - controller

New light modules for diagnostics New backlight elements based on the LED Cree XP-E 1 W, Red with operational control designed and produced test on the Pellet target in progress Purpose: distinct pictures of high velocity pellets

Raspberry PI 3 Model B – as bridge to EPICS DAQ for pellet target – mix of present system with integration to EPICS of GSI/FAIR Data acquisition system Software will be modified for integration to EPICS system of GSI/FAIR. Use of Raspberry Pi controller as bridge for slow control system Present DAQ system – based on individual software-hardware modules (installed on PAC, PLC controllers and Windows PCs) united by TCP/IP Sockets protocole and using of MySQL database for data storing Data to pellet target Data from PANDA control system Ready for start Stop of pellets generation Pellet size and frequency Start of pellets generation Error in pellet target Set of luminosity mode (ten or more variations) Actual luminosity mode Raspberry PI 3 Model B – as bridge to EPICS Experimental Physics and Industrial Control System at GSI (already using in PANDA and CBM experiments)

Current activities and last achievements Transfer of the first prototype from FZJ to ITEP Commissioning of the subsystems from the first prototype Development of the adjustment system Update of the diagnostics system Advanced data acquisition with PLC Continue R&D for TDR Preparation of the draft of the TDR