ABP/RTL Main RTL Activities for 2007/8:-

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
MG - IEFC meeting 22/01/20101 Linac 3 shielding S. Gilardoni, M. Giovannozzi, S. Baird, R. Brown, S. Damjanovic, T. Otto, M. Widorski, Acknowledgements:
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
1 1. Some recent views ( ) 2 Linac tunnel
R. Garoby 3/03/2006PAF progress1 PAF Progress 3/03/2006 M. Benedikt, R. Garoby, F. Ruggiero, R. Ostojic, W. Scandale, E. Shaposhnikova, J. Wenninger 
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
Davide Tommasini Status and prospects of the PS magnet consolidation program ATOP Days March 4 th – 6 th 2009 Status and prospects of PS magnets programs.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
ABT-EC EYETS Activities 2nd reports
CLIC work program and milestones
ICE SECTION The coolest place to be! Elias Métral
Framework Schedule from EYETS 2016 to LS2
Controls & software Andy Butterworth.
EYETS David Hay EN-OSS.
LIU Wire Scanner Milestones June 2017
Injector De-cabling Project
AB-ABP Group Meeting Introduction and motivation
LHC schedule.
Evolution and future of the Access safety and control systems
CLEX* Status and Plans CTF3 complex CLEX
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Installations, modifications, consolidation in 2005:
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Renovation of the 45-year old PS magnets
LIU, ABP-CWG, PBC, miscellaneous
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-CV interventions during EYETS for PS and PSB
Michael Benedikt AB/OP
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
New Group Structure (from 1/2/2007)
PS Machine Changes during the 2009 Shutdown
Present and Future test facilities for High-intensity Targetry CERN
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Safety memo PPE - What I must remember
Presentation transcript:

ABP/RTL Main RTL Activities for 2007/8:- Shutdown Co-ordination and Planning for PSB, PS, LEIR, TT2, AD, SPS, TT40 & TI8 CTF3 and CLEX installation 3 MeV test stand installation LHC Installation (Including TI2) Preparation for LINAC4 construction AB Consolidation project TSO support for accelerators and service buildings 1/6/2007 ABP group meeting

ABP/RTL Simon Baird Section Leader & AB Consolidation Raymond Brown PS Sven De Man PSB & LHC Installation Nicolas Gilbert SPS, TT40, TI2 & TI8 Christian Lacroix LEIR, TT2, AD & 3MeV test stand José Monteiro CTF3, CLEX* & Planning support Bernard Pires SPS Surface buildings  Rosario Principe PS, 3MeV test stand & LINAC4 Michel Samson SPS, TI2 installation, AB Space Management for ADM * (CLIC Experimental Area) 1/6/2007 ABP group meeting

Shutdown/Installation Co-ordination 8 PS main magnets renovated & re-installed Some MTE preparatory work was completed but the main MTE work will still take place in the 2007/8 shutdown 76 SPS main magnet water manifolds repaired INB cable loop installed at the SPS Major tunnel repairs in TT2 New beam stopper in BTP line PSB main magnet water cooling renovation CTF3 Combiner ring ejection line completed CLEX building completed (June 07) 1/6/2007 ABP group meeting

Shutdown/Installation Co-ordination 2007/8 Shutdown (Minimum length = 12 weeks) MTE installation Essential for full CNGS beam operation PS Main magnet renovation (8 units?) SPS main magnet manifold repairs (80 planned) Move 8 PSB wire scanners? 3MeV test stand installation CTF Installation of CLEX equipment Installation of the TL2 line (from the Combiner Ring to the CLEX) LINAC4 Choice of site Technical coordination for the project 1/6/2007 ABP group meeting

TSO’s for Accelerators and the Service Buildings LHC activities AB Consolidation There are 44 active Work Units in 2007 By the end of 2007 a total of 36.8 MCHF will/should have been spent (total budget at present is 50 MCHF ) A full review of all outstanding Consolidation items has been completed:- White Paper request for 27 MCHF & 70 FTE’s Waiting for the “green light” TSO’s for Accelerators and the Service Buildings LHC activities One RTL section member is detached (60%) to TS for the Coordination of LHC installation activities TI2 installation and commissioning coordination No decision on “How an LHC shutdown will be managed” 1/6/2007 ABP group meeting