WG 2.9 Best Practices in River Basin Planning

Slides:



Advertisements
Similar presentations
DG Environment, Unit D.2 Marine Environment and Water Industry
Advertisements

MAES Working Group Meeting Brussels
Environmental Objectives- Article 4.7
Project Coordination Group (PCG) for the implementation of the MSFD
Marine Strategy Framework Directive (MSFD)
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
State of Implementation of CEA in Germany
Progress report on activities and outputs of DG eco 1
« WFD contributions to water management
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Proposed CIS Workshop on WFD Economic Issues
CIS work programme Ad-hoc activity on Economics
WG PoM and Natural water Retention Measures
Monitoring Guidance Johannes Grath Rob Ward 12th October 2005.
JRC-Institute for Environment and Sustainability
Water Directors’ Meeting Common Implementation Strategy
WG 2.9 Best Practices in River Basin Planning
CIS Acitivity Climate Change and Water
European Commission DG Environment
Marine Strategy Framework Directive (MSFD)
Article 13 RBMP reporting testing 2009
Activity on environmental objectives and exemptions
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
Water Science-Policy Interface (CIS-SPI) Progress report
Commission report on Art. 8 WFD Monitoring programmes
Update on progress since last WG meeting (13-14 June 2002)
Natural water Retention Measures
Information on projects
Wetlands and the Water Framework Directive
Draft Mandate and Proposed Approach for the Drafting Group on
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Project 2.7 Guidance on Monitoring
WG 2.B Integrated River Basin Management
Research as a new activity of the CIS WG 2B
WG 2.B Integrated River Basin Management
DG Environment, Unit D.2 Marine Environment and Water Industry
Water Directors’ Meeting Working Group D (Reporting) activities
ECONOMICS IN THE WFD PROCESS
Legal issues in WFD implementation WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
Planning process in river basin management
Environmental objective document –
Water Directors meeting Mondorf-les-bains, June 2005
WG 2.9 Best Practices in River Basin Planning
ECOSTAT 2013 – 2015 Tasks and Deliverables
Integrated Testing in Pilot River Basins
Commission's activities
Water Directors meeting Spa, 2-3 December 2010
WG E on Priority Substances
Common Implementation Strategy for the Water Framework Directive
Update WG Eflows activity and link with EcoStat
THE WATER FRAMEWORK DIRECTIVE (WFD)
Assessment of WFD River Basin Management Plans State of Play
WG Integrated Testing in Pilot River Basins
Compliance checking of RBMP An inventory of questions
In-depth Assessment economic analysis - summary of results SCG meeting 11 March 2009 Anita Payne, Unit D.2, DG Environment, European Commission.
Directive on the assessment and management of flood risks - towards implementation SCG, By Maria Brättemark, European Commission, DG Environment,
Water Science-Policy Interface (CIS-SPI) Progress report
WG C-1 activity Berlin – 3 May 2007
Concept paper on the assessment of WFD River Basin Management Plans
Activity on Eutrophication
Guidance document on the identification of water bodies
Scope and Outline of Policy Document
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Brussels – 20 April 2007 European Commission - DG Environment
EU Water Framework Directive
Marine Environment and Water Industry
WG A Ecological Status Progress report October 2010 – May 2011
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Presentation transcript:

WG 2.9 Best Practices in River Basin Planning WP2 – Guidance on Planning Process Water Directors Meeting 21th-22th November 2002

Guidance Main Contents Principles relevant for the water planning Specific requirements of the WFD regarding the planning process Flowcharts General recommendations for a successful planning process

Principles relevant for the water planning What does water planning mean in the Directive? Relation to other planning concepts Three subsections: Planning process functions, geographical scope and actors

Specific requirements of the WFD Five subsections dealing with the five main steps in the planning process approach: Assessment of current status Definition of environmental objectives Gap Analysis Decision on programme of measure and, Development of a river basin plan

Flowcharts Objectives Identify different tasks, duration. Identify key products Identify actions required to meet the requirements for the obligatory deadlines Identify critical path and bottlenecks Assess the organisational level at which they should be carried out

Flowcharts

Level 1

Recommendations for a successful planning process Description of prerequisites for a sound planning process: Long term vision for the RBD Knowledge and information management Capacity The right timing Public Participation Appropriate toolbox Evaluation of the process

Extension of the deadline to finish the guidance around the end of February 2003

Expected outputs according CIS Strategy document (2 May 2001) Guidance in relation to the identification of RBDs (end 2003) Guidance in relation to River Basin Planning and programs of measures (end 2003) Guidance in relation to participatory approach (end 2003) Technical document (tool box) on River Basin Management (end 2004) Expected outputs according progress report presented by the Commission in Water Directors Meeting (Ghent, 8/9 Nov 2001) Guidance document on the identification of RBDs (May 2002) Guidance document on the planning process (end 2002) Guidance document on Public Participation (end 2002) Manual on Integrated River basin Management with group 4.1 (end 2004)

Expected outputs according progress report presented by the Commission in Water Directors Meeting (Ghent, 8/9 Nov 2001) Guidance document on the identification of RBDs (May 2002) Manual on Integrated River basin Management with group 4.1 (end 2004) Guidance document on the planning process (end 2002) Guidance document on Public Participation (end 2002) Status Nov 2002 2nd version in CIRCA Proposal to be finished in March 2003 Considered in “Carrying forward the CIS” and in 4.1 TOR and Work programme

Proposed Work Programme

Why?: Rigt timing, streamlining Need of validation of flow charts by other WGs that at this moment have open issues still in discussion Time availability for new inputs/improvements of the current text (the same people working in three guidance documents this year) Possibility of organizing a workshop with other working groups and planners (together with WG 4.1?) to check the contents of the document This is not an “open issue”. There is unanimity in the group in the decision to extend the deadline