The ASTRI Camera for the Pathfinder

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

Patrizia Caraveo – ASTRI - Gamma 400 Trieste 1 ASTRI* and CTA: from a DM prototype to a mini-array Patrizia Caraveo (INAF) on behalf of the ASTRI Collaboration.
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
The Effect of Temperature on the Dark Rate of the Silicon Photomultiplier By Jie Zhao Mentor: Dr. Richard Jones.
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
A New Building Data Center Upgrade capacity and technology step 2011 – May the 4 th– Hepix spring meeting Darmstadt (de) Pascal Trouvé (Facility Manager.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
PSD upgrade: Ar-present and Xe-future 1.- Status of the PSD upgrade 2.- PSD performance after upgrade 3.- Problems during the Ar-run 4.- Future scenarios.
 Manager of public procurement is not the final consumer  Number of people participating in taking decision  Volume of trade  Formalized process of.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Detectors for Light Sources Contribution to the eXtreme Data Workshop of Nicola Tartoni Diamond Light Source.
Status of the Genova activity on a direction-sensitive optical module toward the KM3 detector M.Taiuti WP3 PYLOS 16/4/2007.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
1 MPPC update S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira (KEK) Nov KEK.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Filipe Castro Departamento de Física & i3n Universidade de Aveiro C S I(N A ) W AVELENGTH - SHIFTING FIBER GAMMA CAMERA USING S I PM S LIP Lisboa Apr.
R. Pani Department of Experimental Medicine and Pathology University of Rome La Sapienza-Italy. Flat Panel PMT: advances in position sensitive photodetection.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
TORCH – a Cherenkov based Time-of- Flight Detector Euan N. Cowie on behalf of the TORCH collaboration E N Cowie - TORCH - TIPP June 2014.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Update on works with SiPMs at Pisa Matteo Morrocchi.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Silicon Photomultiplier Development at GRAPES-3 K.C.Ravindran T.I.F.R, OOTY WAPP 2010 Worshop On behalf of GRAPES-3 Collaboration.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
PADME Front-End Electronics
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
DEDICATED TO NANNI NANNI EVENTS.
The PSD at Pb-Pb run PSD drawbacks at Ar beam
KLOE II Inner Tracker FEE
ETD PID meeting We had many presentations dedicated to the PM test .
Micromegas Vertex Tracker Status Report
Upgrade activities at Clermont-Ferrand
ASTRI camera status Giovanni LA ROSA
Technical Design for the Mu3e Detector
Baby-Mind SiPM Front End Electronics
CTA-LST meeting February 2015
Power Supply Development for JEDI Polarimeter Modules
FINAL YEAR PROJECT 4SSCZ
POWER SUPPLY FOR BELLE II PIXEL DETECTOR
KRB proposal (Read Board of Kyiv group)
ATF2 Magnet Power Supplies
SciFi option for neutrino target tracker
Mini-drawers, FE-ASIC , Integrator
Baby MIND Status on T9 E. Noah 6th July 2017.
Characteristics of S12045(X) photon sensors for GlueX
E. Noah, A. Blondel, Y. Favre, R. Tsenov 29 July 2015
Status report from Paris in July 2015
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Work packages status in Torino and perspectives
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Directional Optical Module Integration
3x3-MPPC-SMDx16ch SiPM tileable modules from Hamamatsu
ME instrument and in-orbit performance
Setup for testing LHCb Inner Tracker Modules
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
802.11af Liaison Report Date: Authors: July 2011 Month Year
Presentation transcript:

The ASTRI Camera for the Pathfinder Universidade de São Paulo The ASTRI Camera for the Pathfinder Salvo Scuderi – INAF IASF Milano for the CTA/ASTRI Project

ASTRI Camera procurement ASTRI cameras for the pathfinder ASTRI Camera procurement Tenders CITIROC 1A SiPM Camera Thermomechanics, Electronics Direct Procurement Window/Filter White Rabbit Camera Server S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018

ASTRI cameras for the pathfinder: ASICs ASICS  procurement of 1010 CITIROC1A Contract assigned to Weeroc KOM: 19th of June Production Plan Review: 1st of August Qualification phase: completed March 2018 First batch (485 CITIROC 1A) delivered end of October Final delivery Spring 2019 S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018

Advanced Drafts ASTRI cameras for the pathfinder: SiPMs Advanced drafts of applicable documents Reference document of test procedures needed Documents ready by the end of year Advanced Drafts Open bid with invitation letter by January S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018

ASTRI cameras for the pathfinder: SiPMs Requirements Pixel size → 7x7 mm → Large FoV (10.5°) Pixel pitch → 75 µm Coating → Uncoated Optical cross talk Photon Detection Efficiency S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018

Final Draft Draft ASTRI cameras for the pathfinder Final draft of statement of work Requirement document in preparation Reference document on camera design in preparation Reference document on camera control software in preparation Documents ready by ? Open bid with invitation letter by ? Final Draft Draft S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018

ASTRI cameras for the pathfinder Front Window Multilayers Filters to reject the red part of the NSB. Front window Lids Thermal Control System All internal → no chiller TEC based, heat pipes, sink, fans → Active control Low power consumption: 450 kW Photon Detection Module Photon Detection Module SiPM → Hamamatsu LCT5 7x7mm Front End Electronics Based on signal shaping not sampling High gain and low gain channels Low power consumption (0.3 W/chip) Low data production (0.05 Gb/s) Back-End Electronics Back End Electronics monolithic board to manage PDMs, camera trigger & ancillary devices Thermal Control System Voltage Distribution Board Power Supply Distribution External power supply 24V Voltage distribution board → modular system to provide independent and adjustable power supply to PDM Camera DAQ & Server S. Scuderi – ASTRI 2108 – Catania, 7 – 9 Nov 2018