Rehabilitation Project WIN

Slides:



Advertisements
Similar presentations
ADA Requirements Well-designed sidewalks meet ADA requirements:
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
City of Umatilla – McNary Heights Elementary / Clara Brownell Middle School Sidewalk/curb extension/pathway/bus driveway construction; crosswalk/lighting.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Louisiana Safe Routes To School Program
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
Presentation to the TRSD School Board April 17, 2014 Michael Hollow, Grade 5.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Village of Alden Stormwater Pictorial view. Here is a view of rainfall and notice how the water carry’s away from the center of the road to the sides.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
Safety Audit Components Safety assessment for risk Management.
Ch. 7 – Parallel Parking NY State DMV.
Bridges of Columbia. The first bridge from Columbia to Wrightsville was built in 1814 over the Susquehanna River between the two current bridges. This.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
U.S. 150 / S.R. 56 Roadway Rehabilitation Project Thursday, August 22, :00 p.m. Presentation Orange County Community Center Paoli, Indiana.

In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Work Zone Traffic Control for Pedestrians and Bicyclists ATSSA Virginia Chapter Meeting April 15, 2015 Paul Kelley – VDOT Work Zone Safety.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
What does PWD do for our City?. Administrative Services Engineering Operations.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
1 Four Proposals from Oconee County. 2 We are all unique and have different experiences and perspectives. **** Opportunities And Challenges.
A bridging point is crossing point over a river. The town of Brecon grew up at bridging points of the River Usk. Click here to view online aerial footage.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
Nantucket Accessibility Survey LilyAnne Lewis, Connor McGuirk, Paige Tencati Liason: Mike Burns.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
May 2010 Photo provided by the Trust for the National Mall U.S. Commission of Fine Arts Concept Review.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Public Scoping Open House Wabash Avenue/Porter Access Area Environmental Assessment Indiana Dunes National Lakeshore June 28, :00-8:00 p.m.
Montana Parking Rules LET’S GO! NEXT BACK Park by white curb markings to pick up or unload passengers only.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
White Pigeon Community Schools
Improvements to Stockton Street
Scenic Highway – Public Meeting
Town of Brighton, Department of Public Works
Jefferson County SA Red Rocks Site Approval
Drainage and Grading Creating stable ground surfaces
General Road Construction Information
Interdisciplinary teams Existing or new roadway
District 3 Complete Streets Projects
Creating Accessible Routes In Downtown Ellsworth
City of Bloomfield Hills
2017 Florida Redevelopment Awards Capital Projects/Beautification
ALDOT Pavement Preservation Policy
Transportation Alternatives (TA) Set-aside
COACT ODOT Update September 13, 2018.
Motor Row Streetscapes
SE 12th Street Roadway Improvements February 8, 2005.
Safety Audit Components
School of Civil Engineering
Walker Street Reconstruction Project 25% Design Public Hearing
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Traffic Calming Toolbox
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
CONSTRUCTION OF NEW AND REHABILITATION OF EXISTING NON-MOTORISED FACILITIES IN BIRKENHEAD Contract number. 206Q/2017/18.
Presentation transcript:

Rehabilitation Project WIN 18245.00 Kingfield Rehabilitation Project WIN 18245.00

Scope 11’ travelways 5’ shoulders Adding 5’ ADA compliant sidewalks Adding crosswalks Improving safety Improving drainage

Roll Plans

Alignment Raising profile grade 5” from existing, with a few exceptions where overlays are happening on the project.

Alignment Shift: Preserving History Historic wall on west side of Route 27, near the beginning of the project Google Maps, August 2018

Alignment Shift: Reinforcing the River Bank Shift the existing road over to the west just before bridge to prevent further damage by the Carabassett River Additionally, the river bank will be armored with rip rap to help prevent further erosion

Historic Monument Adding curbing and continuing sidewalk beside monument Exploring drainage options to ensure construction does not damage monument

Current Spots: 40 Previous proposal: 32 Current proposal: 39 Parking Current Spots: 40 Previous proposal: 32 Current proposal: 39 Centralmaine.com, David Learning May 2016

Pedestrian Safety: Sidewalks, ADA Compliance Required to provide 5’ sidewalks where new side walks are being built, some exceptions in short distances allowed Sidewalks in downtown district will be vertical granite curb, sidewalks further down in town will be asphalt or concrete curbing Required to provide 2 handicapped parking spots for the amount of proposed parking Required to provide appropriately sized and located openings for handicapped parking, as well as at cross walks

Pedestrian Safety: Crosswalks

Drainage Closed drainage system in town, adding catch basins, tying into system where possible Open drainage towards middle and end of project including ditching and outletting to the river