TT-GISC report CBS-16 period.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Advertisements

ET-ABO 1 st Session th September 2013, WMO, Geneva Commission for Instruments and Methods of Observation (CIMO) Task Team – Aircraft-based Observations.
GISC Brasilia status report Doc25 (AI 2)
Status of GISC Tokyo GISC Tokyo / JMA.
RA-II EG-WIS Report RA-II MG-11
GISC Exeter Status Report
RMDCN Status Report Submitted by: Oliver GORWITS (ECMWF) (Doc 20)
Status report of GISC Beijing
OPAG-PWS Report of the Chair
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Requirement for Full Global Operation on WIS Survey on the WIS Doc
Status Report of GISC Beijing
Progress Report on WIS Implementation, Hong Kong Observatory, Hong Kong, China Submitted by: S.T. CHAN (Hong Kong, China) (Doc 12) Expert team on WIS centres.
Expert Team on WIS Centres Task Team on GISCs
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
WIS overview Submitted by: Secretariat (Doc 02b)
Geneva, Switzerland 2-5 Fenruary 2010
Establishment of ‘Technical Sub Committee’ Action - SDG Option
Agenda item 2.3 Report of OPAG ISS Matteo dell’Acqua
WMO IT Security Incident Process
Status of the WMO WIS Implementation at NOAA/NWS October 2015
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
TT-GISC-2016 Doc 15 Agenda Item 2
Status Report – GISC Melbourne
GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
Feed back to HMEI Submitted by Secretariat) (Doc 10)
The UN Ad Hoc Committee The process to draft a new human rights treaty for people with disabilities.
Virginia Federation of Chapters Strategic Planning/Bylaws Update
GISC Moscow status report Submitted by: Sergey BELOV (Russia) (Doc 17)
GISC xxxx Status Report Submitted by: xxx XXX (Country) (Doc xx)
WIGOS Preparedness Report by RAI
GISC MOSCOW STATUS REPORT 2018
GISC Melbourne Status Report
GISC Tokyo Status (Short update) Doc 23
WMO Information System
Status of RA II WIS Implementation Plan
General Plan Amendment & Zone Change Timeline
A joined proposal by CMA, DWD and JMA
Regional WIGOS Centre Tokyo
ET-CAC Report Kevin ALDER Agenda item 6-3 (1)
Status Reprot GISC SEOUL
Status Report GISC Tehran
ICT-ISS July 2014 WMO; OBS/WIS.
Audit Criteria Mark Francis ET-WISC/TT-DC Agenda item 10
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
Report from Task Team on GISC (TT-GISC)
Development of common training materials
ET-WISC structure and work plan
Status report of GISC CASABLANCA
Operational Information Exchange
TT-DC - Agenda Mark Francis ET-WISC/TT-DC Agenda item 5
GISC Offenbach – Status Report 02/2014 (Doc 19)
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
GISC Offenbach Kai Wirt Task Team GISC TT-GISC2018
GISC Brasilia Status Doc 30
Item V.11 – Discussion Managing WIS
Status Report – GISC Melbourne
Port Back Data Collection & Transition
Status report of GISC Beijing
WIS Project Office WMO Managing WIS WIS Project Office WMO
GISC Washington Kari Sheets Task Team GISC TT-GISC2018
Status report of GISC Beijing
GISC – GISC mutual backup Backup Status Remarks
GISC New Delhi Status Dr. S. L. Singh
Inter-Commission Coordination Group On WIGOS
TT-eWIS/2018: Decentralisation vs. shared services
TT-eWIS/2018 Introduction
The next step of development
GISC Beijing Status Report
GISC Exeter Status Report
Presentation transcript:

TT-GISC report CBS-16 period

TT-GISC Structure and membership Re-established under the ET-WISC (in 2016) TT-GISC ToR and Work Plan was updated Membership 1 Chair 24 members (including a rep. from all GISCs) Sub-groups Launched 8 Work packages to address following key issues Part-C, User-Interface, User-Federation, GISC-Committee, Metadata-Consistency, WIS-Monitoring, Capacity- Develop and Tech-Reg-Updating

TT-GISC Status (1) Statement GISC-GISC connectivity (as of Sep. 2018) All 15 GISCs stated “operational” GISC-GISC connectivity (as of Sep. 2018) “1” GISC Offenbach connected to all 14 GISCs (100%) “7” GISCs connected to 8-13 GISCs (57-93%) Remaining “7” GISCs connected to 2-7 GISCs (14-50%) GISC – GISC backup status “6” GISCs are in operational “7” GISCs are under negotiating and developing “1” GISC is not yet

TT-GISC Status (2) Meetings Metadata sync TT-GISC-2017 13-17 Nov., Geneva (joint with WISC/CTS) TT-GISC-2018 18-20 Sep., Casablanca, Morocco Plan: TT-GISC-2019 26-29 Aug., Offenbach, Germany Metadata sync There are inconsistency between GISCs Testing a solution to avoid inconsistency Capacity development activities (2016-2018) 9 GISCs provided training opportunities for their area of responsibility There were three types of workshop Workshop held at GISC On-site training Remote online training

Achievements Drafted recommendations (amendment of No.1060 and 1061) to be approved by Cg-18 GISC Watch Started from 1st May 2018 according to the fortnight roster and using issue ticketing system with support from GISC Brasilia. All GISC are well attending. GISC Beijing and Tokyo started providing WIS common dashboard (WCD) on an operational basis Started supporting Upper-Air BUFR issues with using the GISC ticketing system Established GISC Operation page to share operational guidance/status/procedures Established Training Aids page to share training materials and activities

Thank you for your attention TT-GISC-2018, Casablanca TT-GISC-2017, Geneva