EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019
Main activities of the comming weeks LIU-SPS RF – BA3: - Removal of equipment's LIU-SBDS – BB5: - Removal ongoing of equipment in the LSS5 (~80% done) - Delivery of scaffolding, cable drums, skip for de cabling campaign etc Ac Coating Fire safety: - Delivery of pipes for the fire hydrant on the arc’s ongoing
Transport and handling issues over the last 2 weeks Packing to be done before transport to the buffer zone -> The equipment's owners should take care of packing (especially for the small items)
Transport and handling issues over the last 2 weeks Some issues with the EDH request form (request not received by transport group)
Transport and handling issues over the last 2 weeks Please add: Pascal Brunero et Sylvain Fumey in copy of all your EDH transport and handling from and to the SPS (surface and underground)
10t Crane in ECX4 Out of service for about 2 weeks (brake need to be changed)
Contacts Handling operations supervision Crane maintenance Pascal Brunero 163011, Sylvain Fumey 163041 Crane maintenance Bruno Feral 164704 (Roberto Rinaldesi 166379) Lift maintenance Gilles Roche 164084 (Jérome Brun 161724) In case of failure of transport and handling equipment (crane, electric tractor) 72201
Impacts For handling operations -> please add us as supervisors e-groups: - en-dep-he-hh - S172-Transport-ALTEAD