19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Advertisements

The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
DCFEB Production for LS2
Chapter Objectives In this chapter, you will learn:
University of Wisconsin
Cabling for LHCb Upgrade
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
General aspects: Optical links :
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
10/month is the present production rate 2 FTE + sporadic contributions
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
CMS RPC Endcap RE1 Status Report
Regional Cal. Trigger Milestone: Major Production Complete
Pierluigi Paolucci - I.N.F.N. Naples
TMB, RAT, and ALCT Status Report
CSC Electronics Installation and Commissioning CSCE I&C
RPC Detector Control System
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Configuring the Peripheral Crates
Commissioning the European XFEL cryogenic system and best practice
FED Design and EMU-to-DAQ Test
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Peripheral Crate Testing, Installation, and Commissioning
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
CSC Electronics Installation and Commissioning CSCE I&C
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
PCMB Address Assignments per Station/Rack/Crate
CSC Shift Training and Operation + B904 Status
Presentation transcript:

19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06

I&C On hand DMB, MPC, CCB, Crates, CRB OSU CC BP TMB/RAT 19-April-05 I&C On hand DMB, MPC, CCB, Crates, CRB Most of inventory is at CERN OSU CC 5 at CERN, more soon BP 11 at CERN installed in PC with ALL hardware 18 more 15-March 15/2wks from then on TMB/RAT 10 of each – pre-production, have been here TMB – 20 next week RAT – 20 in ~1-2 weeks 16-May-19 PC I&C Feb'06

19-April-05 I&C (2) PC PC 2 in slice test with pre-production BP – will stay 2 in SX5 in bottom PC racks 4 in B904 ready for board testing 5 in ISR waiting CRB Have made final hose specifications 12 tested and have all hardware attached including hoses Installed in above crates PCMB Many dumb PCMB’s for B904, MTCC etc 2 prototypes for R&D work 4 pre-production being assembled - ~3 weeks Production in beginning stages 16-May-19 PC I&C Feb'06

I&C (3) Racks Preparing Racks Installing Racks 19-April-05 I&C (3) Racks Preparing Racks Drawings showing layout of all PC racks have been produced http://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/index.htm Scroll down on page and pick – ‘Documentation’ > ‘PC rack layout …’ Prep of mini racks has begun at SX5 Installing Racks Top racks will be installed with crane after FULL prep – including PC’s without any boards, +&- Bottom racks on YE+-3 are in and have (+) been will be (-) prep’ed in place Other bottom racks will be install and then prep’ed, but will be last worked on (NOTE – they are removed again when disk lowered) Tall racks on platforms will be installed and then prep’ed Will install and prep ALL (EMU) tall racks 16-May-19 PC I&C Feb'06

19-April-05 Software Hyper-DAQ Shell ready, tested, ongoing additions and enhancements Test routines include Tests and programming of individual boards From builders – mostly finished Tests of two or more boards Also involve some ‘calibrations’ – many finished Fast site type tests & calibrations In process Test db All test information saved in files – listing and summary db to be built Basic test unit/run is Test session – finite time interval Particular crate with fixed board load Any board switches require the start of new test run 16-May-19 PC I&C Feb'06

LVPS for PC&CSC Maraton for YE+2 Est. complete 15-March 19-April-05 LVPS for PC&CSC Maraton for YE+2 Maraton ready to install at SX5 Need CANBus from GB to YE+2 rack Need to install LV cables for PC’s – will use CSC LV type cable Need to install splitters for CSC Need to specify and make output bus bars and cables from Maraton to splitters Est. complete 15-March 16-May-19 PC I&C Feb'06

LVPS for PC&CSC Maraton for YE+3 ??? However Has 1 PC and 3 CSC’s 19-April-05 LVPS for PC&CSC Maraton for YE+3 ??? Has 1 PC and 3 CSC’s Maraton has 4 of 6 outputs available (if gang PC outputs for YE+2) 2 for PC 2 for 3 CSC’s However Longer LV cable runs Special one time setup Needs more investigation 16-May-19 PC I&C Feb'06

LVPS for PC&CSC CAEN for YE+1 Est. temporary ready 15-March 19-April-05 LVPS for PC&CSC CAEN for YE+1 Do not have yet Can use temporary supplies until MTCC starts Need CANBus from GB to YE+1 rack Need to understand, specify and install cables from CAEN to PC’s Need to install splitters for CSC Need to specify and make cables from CAEN to splitters Est. temporary ready 15-March 16-May-19 PC I&C Feb'06

MTCC CANBus Have 4(5) field buses on detector 19-April-05 MTCC CANBus Have 4(5) field buses on detector Gas Will take separate route to GB CAEN LVPS for PC and CSC Maraton LVPS for PC and CSC PCMB on CRB’s for PC’s Others? Don’t know if they are compatible Can they be combined on single bus? Time is short for thorough tests CAEN will be late Set up maximal system 4 separate long cable runs from GB to YE+1 PP 3 known buses above plus a spare Loop runs from YE+1 PP and back so that can combine or separate buses at will from this point 16-May-19 PC I&C Feb'06

MTCC CANBus Long Run CANBus for MTCC CAEN connects inside this rack 19-April-05 MTCC CANBus Long Run CANBus for MTCC Green Barrack to YE+1 tower outside PP YE+1 outside PP to YE+1 inside PP CAEN connects inside this rack GB 16-May-19 PC I&C Feb'06

MTCC CANBus Loop allows us to put in series with other buses PCMB bus 19-April-05 MTCC CANBus Loop allows us to put in series with other buses Signal and Power to and back minimizes ground loops PCMB bus requires external 12V PCMB bus PP YE+1 to PC on YE+1 and back PP YE+1 to PP YE+2 and back PP YE+2 to PC on YE+2 and back Optionally PP YE+2 to PP YE+3 and back PP YE+3 to PC on YE+3 and back 16-May-19 PC I&C Feb'06

MTCC CANBus Maraton bus PP YE+1 to PP YE+2 and back 19-April-05 MTCC CANBus Maraton bus PP YE+1 to PP YE+2 and back PP YE+2 to Maratons and back 16-May-19 PC I&C Feb'06

Summary Working on Racks and crates Working on infrastructure for MTCC 19-April-05 Summary Working on Racks and crates Working on infrastructure for MTCC Eager to begin I&C Visit I&C web site at http://cms-emu-slicetest.web.cern.ch/cms-emu-slicetest/904/index.htm 16-May-19 PC I&C Feb'06