Technical Services Report March 6th, 1999 Singapore.

Slides:



Advertisements
Similar presentations
Axel Pawlik. LACNIC III, November 2002, Mexico City. 1 6bone Address Registry Proposal Axel Pawlik / Mirjam Kühne RIPE NCC.
Advertisements

1 Axel Pawlik LACNIC IX, May 2006, Guatemala RIPE NCC Update.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Work Plan 2000 APNIC Annual Member Meeting Seoul, 3 March 2000.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Annual Report 1999 APNIC Annual Member Meeting Seoul, Korea, 3 March 2000.
Copyright (c) 2002 Japan Network Information Center Introduction of JPNICs New Registry System Izumi Okutani IP Address Section Japan Network Information.
Reverse DNS SIG Summary Report APNIC Annual Member Meeting Bangkok, March
Technical Services Develop Integrate Operate APNIC technical infrastructure.
1 Technical Area highlights and priorities APNIC Member Meeting 29 February 2008 APNIC 25, Taipei George Michaelson.
Operational Policies for NIRs in the APNIC Region NIR Meeting APNIC14, Kitakyushu, Japan 4 Sept 2002.
Update on IANA APNIC Meeting 29 February 2008 Barbara Roseman Internet Assigned Numbers Authority.
APNIC 13March APNIC 13 Bangkok Status Report Ray Plzak.
1 Axel Pawlik APNIC 21, 3 March 2006, Perth RIPE NCC Update APNIC 21.
TWNIC RMS Update 16 th APNIC NIR SIG TWNIC Sheng Wei Kuo Aug, 2003.
APNIC Update AfriNIC 10 May2009. Overview APNIC 27 policy outcomes APNIC Members and Stakeholder Survey IPv6 Program Research and development activities.
APNIC Update AfriNIC 11 November Overview Services status Policy developments Priority activities Next meetings.
Internet Information Services 7.0 and Internet Information Services 7.5 Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
Department of Information Technology SHARE New Architecture, Hardware, Disaster Recovery, and System Upgrade Project Update SHARE Service Manager – David.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
APNIC Internet Routing Registry Routing SIG APNIC-15, Taipei 26 February 2003.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Open Address Policy Meeting Address Policy SIG October 26th, Brisbane.
Mirjam Kühne 1 RIPE 34, September 1999 RIPE NCC Status RIPE NCC Staff presented by Mirjam Kühne.
Lesson 20 – OTHER WINDOWS 2000 SERVER SERVICES. DHCP server DNS RAS and RRAS Internet Information Server Cluster services Windows terminal services OVERVIEW.
Mitun PatelMXP07U. Organisational structure Top management; this includes the organisation’s general manager and its executives Department managers; this.
Technical Area Report Bryon Ellacott, Technical Area Manager APNIC 28.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
Database Update Kaveh Ranjbar Database Department Manager, RIPE NCC.
AussieISP Fall ‘99 Sydney, 9 April 1999 Overview and Status Report.
Geoff Payne ARROW Project Manager 1 April Genesis Monash University information management perspective Desire to integrate initiatives such as electronic.
Taiwan Network Information Center Introduction to TWNIC RMS (Resource Management System) 15 th APNIC NIR Meeting David Chen Feb 26,
ARIN Update June 2000 NANOG 19Albuquerque NANOG 19Albuquerque Overview Organization & Staff Activities Regional News Membership Statistics Regional Policy.
ARIN Update Ray Plzak President & CEO. Kitakyushu September 2002APNIC 14 Overview Membership Organization News Emerging RIR Activities ARIN IX ARIN X.
APNIC Update Paul Wilson Director General Operational Plan Key Outcomes Delivering Value Supporting Internet Development Collaborating and Communicating.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Update RIPE 40 Prague, 1-5 October, 2001.
APNIC Update AfriNIC 12 May 2010 Sanjaya Services Director, APNIC.
Regional Internet Registries Statistics & Activities IETF 55 Atlanta Prepared By APNIC, ARIN, LACNIC, RIPE NCC.
Technical Area Report Byron Ellacott Technical Area Manager.
APNIC Status Report ARIN X Eugene, Oregon Oct 30-Nov 1, 2002.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
APNIC Status Report LACNIC III Mexico City 11 November 2002.
APNIC Update ARIN IX Las Vegas, Nevada 7-10 April, 2002.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Update RIPE 39 Bologna, April 30-May 4, 2001.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E RIPE 37 Local IR WG APNIC Member Services Report.
July 2002IEPG, Yokohama, Japan RIR Co-ordination and Joint Statistics IEPG, Yokohama, Japan Prepared By APNIC, ARIN, RIPE NCC.
Engineering Report Mark Kosters. Big changes with Engineering starting at the beginning of 2015 Lots of requests for development/operations support Engineering.
APNIC Report RIPE 43 Rhodes, Greece 9-13 September 2002.
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC Status Report ARIN VI Public Policy Meeting 2-4 October 2000.
©2012 Microsoft Corporation. All rights reserved. Content based on SharePoint 15 Technical Preview and published July 2012.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
APNIC Security Update APSIRCC 2002 Tokyo, 25 March 2002.
Leo vegoda. APNIC 14, 3–6 Sept. 2002, Kitakyushu, Japan. 1 RIPE NCC Status Report at APNIC 14 Looking forward to winter…
A S I A P A C I F I C N E T W O R K I N F O R M A T I O N C E N T R E APNIC History and Overview AfriNIC Meeting Cape Town, May 2000.
Whois Database Upgrade Project Update APNIC-14 DB-SIG 4 September 2002
IEPG November 1999 APNIC Status Report. Membership Resource Status Recent Developments Future Plans Questions?
APNIC Status Report RIPE 44 Amsterdam, The Netherlands January 27-31, 2003.
Engineering Update Key Projects –IPV6 Registration function is completed, tested, and ready for production IPV6 WHOIS completed, tested, and ready for.
APNIC IPv6 Allocation Update IPv6 SIG APNIC 14, Kitakyushu, Japan 4 September 2002.
APNIC Update Elly Tawhai Senior Internet Resource Analyst/Liaison Officer, Pacific, APNIC AusNOG
Universal Acceptance: APNIC system readiness Byron Ellacott Senior Software Architect.
Whois & Data Accuracy Across the RIRs. Terms ISP – An Internet Service Provider is allocated address space by an RIR for the purpose of providing connectivity.
Bob Jones EGEE Technical Director
Suva Fiji, July 2017 Arth Paulite
Regional Internet Registries An Overview
Implementation of ARIN's Lame DNS Delegation Policy
IEPG Minneapolis, March 1999
RIR Co-ordination and Joint Statistics
RIPE 41 Amsterdam, January, 2002
Department of Licensing HP 3000 Replatforming Project Closeout Report
APNIC Status Report Paul Gampe System Administrator
IPv6 Allocation Service in JPNIC
Presentation transcript:

Technical Services Report March 6th, 1999 Singapore

Overview Staffing External Services Internal Services Activities Year 2000

Staffing End 1998 (2) Manager - Paul Gampe project coordination programming and administration System administrator - Bruce Campbell network engineering database management

Staffing End 1999 (5) Database Administrator Q2 whois and membership database Developer - External Services Q3/Q4 whois database (with other registries) RPSL and CA projects Developer - Internal Services Q2 tools for the Membership Services core services

External Services Summary Whois Database IN-ADDR.ARPA Name Server Web Site FTP Repository Mailing Lists

Whois Database

Whois Database (contd) Server Load approaching 20 hits/minute four fold increase over last year Server Software upgraded to RIPE support for PGP planned split update and query server for performance

Web Site

Other Services in-addr.arpa secondary servers in Tokyo & Brisbane transferred from Telstra in November Web Site / FTP Repository demand increasing steadily search engine available Mailing Lists web interface available

Internal Services Summary of major changes ticketing system web site allocation and analysis toolset framework auditing of system and network activity

Activities Time Line deployed production network and established core services in Australia April - August 1998 decommisioned servers in Tokyo Nov 1998 installed redundant server network at Tokyo NSPIXP-II in Nov 1998

Activities Sponsors remote Access network - Ascend backbone network - Cisco primary server farm - Compaq/SCO finalising sponsorship dual node 'Single Server Image cluster

Activities Whois Database working with the RIPE NCC on re-implementation joint registry project in the future committing one full time programmer by Q3/1999

Activities Member Information Management continuing development of internal tool set and information systems support for IPv6 address allocation committing one full time programmer internal development by Q3/1999

Activities In-addr.arpa Developing systems for automated management and delegation of in-addr.arpa domains via whois database Expect project to be completed in Q2/1999 RPSL Deployed test RPSL server

Activities Redundancy Vendor and platform evaluation report Unix on Intel Investigating 2nd Internet connection plan to have operational by Q4/1999 Two node 'High Availability' cluster redundant power, storage and processors as primary server March 1999 Continue to maintain off-site secondary server in Tokyo

Year 2000 APNIC will take all reasonable steps to ensure that systems and services provided by APNIC shall be Year 2000 Compliant. APNIC will take all reasonable steps to ensure that products or systems used to provide systems or services are, or shall be prior to July 1, 1999, Year 2000 Compliant.

Year Project Plan Phase 1 (Completed) identify all areas within APNIC that should be included in the Year 2000 Project. Form project team and prepare workplan Phase 2 (Completed) identify critical functions within APNIC so that project team activities may be prioritised to rectify problems that would threaten continued operation Phase 3 (Completed) identify all resources that are required for APNIC to perform the critical functions

Year 2000 (contd) Phase 4 (Completed) determine risks that may impact APNIC's ability to reach Year 2000 compliance Phase 5 (15 March 1999) assess the resources to provide an indication of the nature, size, and cost of Year 2000 problems Phase 6 (1 April 1999) prepare a plan for a Year 2000 Compliance Project and develop contingency plans Phase 7 (April - June 1999) implement the approved Year 2000 Compliance Project Plan