Actions Updates Action 0282/006 – Exclude from AQ process

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
PN UNC Workgroup Read Validation 4 th October 2011.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Development Workgroup 0282 Action 018 – impact on RbD 13 September 2010.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
1 Modification 0152V Implementation Matters 25 October 2007.
Rolling AQ – Initial Calculation
Options for Mod 640 Replacement
Weekly Progress Update 3rd Aug 2018
Background - Tolerance Rules
Nexus Meter Read Performance April 2018
Must Read Process Guide For Shippers
Extraordinary DSC ChMC
Change Management Committee – June 2019 Update
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
Weekly Progress Update 13 July 2018
Change Management Committee – June 2019 Update
Weekly Progress Update 15 June 2018
Elaine Carr ScottishPower
Modification 0117 – Additional Considerations
Impacts of Project Nexus Implementation Date to AQ17
Industry Shipperless & Unregistered Working Group
Weekly Progress Update 11 May 2018
Gas Long Term Vacant (LTV) Proposal April 2010
Mod Proposal 0268 : AQ Backstop Date
Actions for Mod209 Workgroup
Market Differentiation Workgroup Market Sector Flag Analysis
Connected System Exit Points - Update
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Development modification group 194
Development modification group 194
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Lessons Learnt UKLC - November 2015
Joint Theft Reporting Review (from meeting 1st March 2019)
Development modification group 194
MOD 640 INVOICING VALIDATION RULES
Overview of RbD Risk Modelling 31 March 2008
Dave Addison August 2008 Application Support Updates
Project Nexus Workgroup
AQ Review System Calculation Overview
Review Group 208 / Development Modification Group 194
Nexus Workgroup Read Validation Scenarios
Modification Proposal 136
Meter Read Rejections ..
Meter Reads.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Extraordinary DSC ChMC
Customer Issue Management CoMC Update
Annual Quantity (AQ) 45.
Customer Issue Management CoMC Update for April & May 2019
Further Considerations
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Actions Updates Action 0282/006 – Exclude from AQ process The treatment of isolated sites during the AQ process depends on when previous meter readings were received (see slides below) Action 0282/011- How are isolated sites treated in the current allocation regime: The isolation flag is set and Gemini updated at D+7 The AQ is included within Commodity and Energy Balancing and the RbD smear up to the Stop Commodity date Thereafter isolated sites are excluded from commodity, EBI and RbD processes Action 0282/12 - Isolated Meter Reading Process Meter reading received following an isolation are rejected 5/26/2019

Review Group 0282 – Prime & Sub Isolation Process Action 0282/013 Shipper sends through an RGMA flow requesting an Isolation for a Prime or Sub meter S&M rejects back to shippers but a daily report is produced for investigation by xoserve Following the investigation: If it’s a sub meter the isolation is progressed If it’s a single sub to a prime, the primary meter set up as freestanding If the request is for a prime isolation, shipper is informed via e-mail that isolation cannot be carried out unless the sub(s) are isolated 5/26/2019

Review Group 0282 – Prime & Sub Isolation Process Issues with setting Prime Meters with a Vacant status. Meter readings do not load for isolated sites, they are rejected It would be difficult to ascertain if the prime MPRN was using gas in it’s own right Would need to ensure if a request was received to moves from V to I that S&M would still reject the isolation 5/26/2019

Isolations/AQ Calculation The AQ will calculate during the annual AQ Review when a Meter Point is isolated ONLY if the minimum of six months and one day of consumption/reads are available on Sites and Meters from the End Read date used for the last AQ calculation. The calculation date for the SSP market is April and the LSP Market is May. If a successful AQ Amendment is processed from the Shipper, the end date used in the xoserve proposed AQ will revert to the end date used for the AQ Amendment. 5/26/2019

Isolations/AQ Calculation EXAMPLE – AQ will potentially calculate when current status is isolated AQ2009 live date 01st October 2009 AQ2009 01st April 2009 Calculation date AQ2010 01st April 2010 Calculation Date 1st December 2009 Isolation Date P 10 MONTHS AQ2009 review calculates a AQ value on 01st April 2009, to be effective on 01st October 2009, the End Meter Read date used in the calculation is 01st February 2009. The Meter Point is isolated with a effective date of 01st December 2009. The time period between the End Read date used in the last AQ calculation (01st February 2009) and the isolation date (01st December 2009) is 10 Months. The minimum requirement for an AQ calculation is two valid Meter Reads six months and one day apart, for example 01st February 2009 and 02nd August 2009. For the AQ2010 review, an AQ will potentially calculate if two Meter Reads are available on Sites and Meters from 01st February 2009 and 01st December 2009 the minimum of six months and one day apart. 01st February 2009 End Read AQ2009 01st August 2009 Meter Read AQ will potentially calculate AQ2010 if the required Meter Reads are present for the period of end date of last AQ calculation and the isolation date. 5/26/2019

Isolations/AQ Calculation EXAMPLE – AQ fails to calculate due to Isolation AQ2009 live date 01st October 2009 AQ2009 01st April 2009 Calculation date AQ2010 01st April 2010 Calculation Date 1st July 2009 Isolation Date O AQ2009 review calculates a AQ value on 01st April 2009, to be effective on 01st October 2009, the End Meter Read date used in the calculation is 01st February 2009. The Meter Point is isolated with a effective date of 01st July 2009. The time period between the End Read date used in the last AQ calculation (01st February 2009) and the isolation date (01st July 2009) is 5 Months. The minimum requirement for an AQ calculation is two valid Meter Reads six months and one day apart, for example 01st February 2009 and 02nd August 2009. For the AQ2010 review, an AQ will not calculate because the minimum read/time requirement is not available. The Meter Point will be on the Warning Report. 5 MONTHS 01st February 2009 End Read AQ2009 AQ will calculate a new AQ for 2009 as AQ calc run is prior to the isolation and meter reads are available but roll over in 2010 due to no meter readings loading during the period 1/7/09 – 1/4/10 5/26/2019