Always ensure MOC is used when making changes to equipment setup

Slides:



Advertisements
Similar presentations
Always ensure travelling block is stationary during DM changeover
Advertisements

Always ensure the correct grade and length bolts are used
Do not work at height without fall protection
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Always Drive to road conditions
PDO Second Alert What happened? Your learning from this incident..
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
PDO Second Alert Date: Incident title: LTI What happened?
PDO Second Alert Photo explaining what was done wrong
PDO Second Alert Always follow the PTW procedures
Always ensure straight lifting
PDO Second Alert Date: Incident title: HiPo MVI
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Never place yourself in “line of fire”
PDO Second Alert Date: Incident title: HiPo What happened?
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Always slow down when negotiating roundabouts
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Photo explaining what was done wrong
Confidential - Not to be shared outside of PDO/PDO contractors
Always follow defensive driving techniques
Always intervene an unsafe act
Always get authorization before starting any job!
Always keep your hands and fingers away from the Line of Fire
Confidential - Not to be shared outside of PDO/PDO contractors
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Always use fit for purpose lifting accessories
Keep clear of any rope under tension
Stay away from line of fire
Always use a banksman with reversing
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Always ensure protective guards are in place
Always adhere to Red/No Go zones
Do not drive underneath overhead lines without permission.
Always verify isolation before starting any electrical job!
Confidential - Not to be shared outside of PDO/PDO contractors
Your safety should always be built on SOLID ground
Use clamps instead of bands to secure ESP cable on the tubing
Always be alert and operate drilling hoisting equipment at safe speed.
Maintain communication between peers
Drive as per the road condition
Do Not Start Any journey without proper driving training.
Confidential - Not to be shared outside of PDO/PDO contractors
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
Always follow NORM protocol!
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Confidential - Not to be shared outside of PDO/PDO contractors
Confidential - Not to be shared outside of PDO/PDO contractors
Only overtake when safe to do so
Confidential - Not to be shared outside of PDO/PDO contractors
Slow down and always drive to the conditions of the road.
Presentation transcript:

Always ensure MOC is used when making changes to equipment setup PDO Second Alert Date: 20.10.2018 Incident title: HIPO What happened? At 00:40hrs on the 20 Oct 2018, The operation was Nipple up BOP in the cellar and simultaneously the Driller was trying to setup the BOP Control panel in place behind the drillers console. At this time the travelling block started descending uncontrolled coming into contact with the BOP (hit the oil tray on top of the annular) due to the hoist floor not being installed yet. The complete drilling line came out from Draw Works, all the way up passing the first sheave. As soon the block landed on ground, the remaining drilling line stayed on crown sheave. Due to the slow descend of the travelling block there was no damage to the equipment. Your learning from this incident.. Always ensure a MOC is used when making changes to equipment setup Always ensure locking mechanisms are available for secondary brake systems Always ensure work areas aren't congested Ensure all dates and titles are input A short description should be provided without mentioning names of contractors or individuals. You should include, what happened, to who (by job title) and what injuries this resulted in. Nothing more! Four to five bullet points highlighting the main findings from the investigation. Remember the target audience is the front line staff so this should be written in simple terms in a way that everyone can understand. The strap line should be the main point you want to get across The images should be self explanatory, what went wrong (if you create a reconstruction please ensure you do not put people at risk) and below how it should be done. Always ensure MOC is used when making changes to equipment setup Confidential - Not to be shared outside of PDO/PDO contractors

Confidential - Not to be shared outside of PDO/PDO contractors Management self audit Date: 20.10.2018 Incident title: HIPO As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure your staff have completed training on the use of your companies MOC system? Do you ensure your drillers controls ergonomically correct? Do you ensure a risk assessment has been completed on your units control stations or panels to ensure that are user friendly? Do you ensure your secondary brakes have a locking system so that cant be accidently released? Due you ensure all rig audit findings are communicated to senior management before actions are put in place? * If the answer is NO to any of the above questions please ensure you take action to correct this finding. Ensure all dates and titles are input Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask others if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Imagine you have to audit other companies to see if they could have the same issues. These questions should start with: Do you ensure…………………? Confidential - Not to be shared outside of PDO/PDO contractors