SP-99280 1 TSG-T Progress Report TSG-SA Working Group 1 (Services) meeting #4TSG S1#4 (99)440 Quebec City, Quebec, Canada 5 th -9 th, July 1999 Agenda.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /064r0 Submission March 2000 Mårten Mattsson, EricssonSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
UNITED NATIONS Shipment Details Report – January 2006.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
RECORD KEEPING Cooperative Development of Operational
1 Hyades Command Routing Message flow and data translation.
Diameter Bulk Signaling draft-liebsch-dime-diameter-bulksig-00.txt M. Liebsch, G. Punz IETF81, Quebec Diameter Maintenance and Extensions (DIME) WG 28.
How does ETSI work? ETSI Seminar © ETSI All rights reserved.
Pietro Schicker TISPAN# Scope (1) Verification of the PSDN/ISDN emulation based on ETSI eISDN specifications from NGN R1 requirements Provide.
SEM08-14 Specialist Task Forces (STFs) Who they are ? What can they do for you ? How we manage ? ETSI Seminar June 2010 Specialist Task Forces (STFs) Who.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
ETSI Starter Group on Digital Content Distribution July 7, 2008 DVB IPDC A fragment of Mobile TV Georges Martinez – Motorola DVB TM-CBMS Chairman July.
ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
The Smart Card Platform
24 May 2004Michael Sharpe, ETSI Secretariat Radio Competence Centre 1 How can ETSI help? The regulatory environment for RFID Michael Sharpe.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
The Implementation Structure DG AGRI, October 2005
Geneva 9-11 Dec 2002ITU Workshop on Satellites in IP and Multimedia 1 IP over Satellite: Standardization activities in ETSI/TC-SES ITU Workshop on Satellites.
3GPP's co-operation with the ITU Dr
Overview of the interoperability Regulation
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
Addition Facts
Making the System Operational
ZMQS ZMQS
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
Cdma2000 Cards and Provisioning David Crowe Doug Dunn
Effectively applying ISO9001:2000 clauses 6 and 7.
Chiu Choi, Ph.D., P.E. Technical Consultant OIML workshop on the metrology of vehicle speed measurement devices NIST Headquarters, Gaithersburg, MD July.
OOAD – Dr. A. Alghamdi Mastering Object-Oriented Analysis and Design with UML Module 3: Requirements Overview Module 3 - Requirements Overview.
1 3GPP TSG T1 #3 T Proposal for Document Structure TSG T1 #3, Miami, th June, 1999.
AEMCPAGE Relaunch 1 June 2009.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 9 1 All you always wanted to know about.
UMTS system Telenor FoU Josef Noll Page 1 UMTS system & planning aspects, Link and system level simulations aspects related to network.
VOORBLAD.
Page 1 October 31, 2000 An Introduction to Large-Scale Software Development Steve Varnau Core HP-UX Operation October 31, 2000.
1 3GPP TSGs SA Meeting #49, San Antonio, Texas, USA, September 2010 SP © 3GPP Organizational Partners Satisfaction survey results In.
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
12ECBF-2001/CB 1 ETSI Technical Committee ETSI Technical Committee Electromagnetic compatibility Electromagnetic compatibility and Radio Spectrum Matters.
3.7) On-going activities within CEPT/ECC Thomas Weilacher Vice Chairman of CEPT/ECC Working Group FM (Frequency Management)
Location Services Overview Larry A. Young Chairman, OMA Location Working Group SDO Emergency Services Coordination Workshop 5 th and 6 th October, 2006.
Addition 1’s to 20.
25 seconds left…...
3GPP SA3 Lawful Intercept
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Non Road Mobile Machinery Engines Global Technical Regulation for Approval by GRPE Draft NRMM gtr 2009/16 Final Report 2009/17 Informal document No. GRPE
Nokia 30 technical specification
SMG10 report to SMG#30 Tdoc SMG P
TCP/IP Protocol Suite 1 Chapter 18 Upon completion you will be able to: Remote Login: Telnet Understand how TELNET works Understand the role of NVT in.
Slide 1 One world. One name. Anritsu T Chairman’s Report for TSG-T1 SIG SWG T Dan Fox.
Status Report on GSM (SMG #29) TSG-T3 #7 Lund, July 1999 TSG-T Dr. Klaus Vedder Chairman SMG9.
TETRA Inter System Interface (ISI)
4.6 Creation of 3GPP 4.7 How does 3GPP Operate? 4.11 Beyond 3GPP Release ’99.
Cdma2000 Card Environments and Provisioning Doug Dunn TSG-C WG 1 Chair
3G TS USIM Conformance Test Specification STF 162 USIM Conformance Test Team 3GPP T3 Meeting #15 San Diego, USA, August, 2000 Tdoc T
Third TETRA World Congress A Report on ‘TETRA Release 2’ Brian Oliver Chairman, ETSI Project TETRA.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
3GPP TSG RAN WG2 meeting #92 Nanjing, China 23-27, May 2016 R
Proposal for Document Structure
Presentation transcript:

SP TSG-T Progress Report TSG-SA Working Group 1 (Services) meeting #4TSG S1#4 (99)440 Quebec City, Quebec, Canada 5 th -9 th, July 1999 Agenda Item:4.2.0 TSG-T Progress Report TSG-T Chairman: Sang-Keun Park (Samsung Electronics, TTA)

SP Progress ReportProgress Report –T1: Conformance Testing –T2: Services and Capabilities –T3: USIM List of Approved DocumentList of Approved Document List of Documents for InformationList of Documents for Information Requesting to SARequesting to SA Meeting CalendarMeeting Calendar Contents

SP T1 Conformance Testing SWG SignalingSWG Signaling –Types of test case: Regulatory/Interoperability/VoluntaryRegulatory/Interoperability/Voluntary –Development of 3GPP TTCN Test Spec. -Funding for STF to develop the protocol conformance tests in TTCN for the MS interoperability (SP-99278) -NOTE: Some manufacturers will produce 3GPP test equipment. The interface between the test specifications and the TTCN test equipment should be standardised

SP SWG EMCSWG EMC –New Chairman : John Fenn (SAMSUNG/ETSI) –Two stages on the specifications: -Stage1: Report/Specification on regional EMC requirements -Stage2: Intend to produce global EMC requirements -SWG RF –Logical Test Interface FDD and TDD to be merged in July 1999 as TS FDD and TDD to be merged in July 1999 as TS Delayed to be v1.0.0: inconclusive BER/FER issues (RAN4) Delayed to be v1.0.0: inconclusive BER/FER issues (RAN4) T1 Conformance Testing

SP SWG RF (Continued)SWG RF (Continued) –TS : Measurement Procedure (FDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (FDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (FDD) updated from v0.2.0 to v updated from v0.2.0 to v –TS : Measurement Procedure (TDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (TDD) changed Title to Terminal Conformance Specification, Radio Transmission and Reception (TDD) cannot be updated to v1.0.0 due to due to lack of contributions cannot be updated to v1.0.0 due to due to lack of contributions Related RAN4 document must be stabilised by OctoberRelated RAN4 document must be stabilised by October –In order to finalise the RF specifications by end of 1999

SP T2 Services & Capability SWG1 (MExE)SWG1 (MExE) –MExE R98 GSM Finalised and will be presented to SMG#29 for approvalFinalised and will be presented to SMG#29 for approval Presented as 3G TS v1.1.0 to TSG-T Presented as 3G TS v1.1.0 to TSG-T For information because it is the basis of the new MExE release For information because it is the basis of the new MExE release –Work on New release Start as soon as Stage 1 for MExE R99 is approved at SMG#29Start as soon as Stage 1 for MExE R99 is approved at SMG#29

SP T2 Services & Capability SWG2 (Terminal Interfaces)SWG2 (Terminal Interfaces) –Some progress on the discussion on whether the physical connector of the terminal should be standardised or not TSG-T sent a LS to OP and PCG asking for clarification of the term Global circulation –Next TSG-T2 SWG2 Report on Synchronisation and Object exchangeReport on Synchronisation and Object exchange No input: Alternatives to AT commandsNo input: Alternatives to AT commands There might be some input on the coding of additional language characters in SMS text strings and phonebook (Japanese, Korean, Chinese etc.)There might be some input on the coding of additional language characters in SMS text strings and phonebook (Japanese, Korean, Chinese etc.)

SP T2 Services & Capability SWG3(Messaging)SWG3(Messaging) –Decision of S1 Stage 1 for the Multimedia Messaging Service (MMS) should be produced by T2Stage 1 for the Multimedia Messaging Service (MMS) should be produced by T2 –First draft discussed –An enhanced cell broadcast service No progress due to no inputNo progress due to no input SWG5 (Multi-mode Terminals)SWG5 (Multi-mode Terminals) –Working on the report Multi-mode terminal issues : to be completed by Oct. 1999

SP T2 Services & Capability SWG6 (Terminal Features & Performance)SWG6 (Terminal Features & Performance) –New Chairman: Kazuya Hashimoto (NEC/ETSI) –Terminal Capabilties issue TR v Terminal Capabilities Requirements is being drafted.TR v Terminal Capabilities Requirements is being drafted. T1 is discussing how the work on terminal capabilities in T2 should be used.(e.g. for ICS)T1 is discussing how the work on terminal capabilities in T2 should be used.(e.g. for ICS) New LSs to other WGs will be sent.New LSs to other WGs will be sent. One coordinator/Each WG has been assigned to monitor the progress on baseline & service capabilities issuesOne coordinator/Each WG has been assigned to monitor the progress on baseline & service capabilities issues

SP T3 USIM Status of DeliverablesStatus of Deliverables TS (v.3.0.0) USIM and IC Card Requirements- no changes. TS (v.3.0.0) USIM and IC Card Requirements- no changes. Progress reported on both deliverablesProgress reported on both deliverables TS v 0.5.0TS v –UICC physical & logical characteristics TS v 0.5.0TS v –USIM characteristics Planned to submit for information (v.1.0.0) to TSG- T#5 in October 1999Planned to submit for information (v.1.0.0) to TSG- T#5 in October 1999

SP T3 USIM Phonebook issuePhonebook issue More complex than GSM ADN More complex than GSM ADN Examples Examples Second names, Fax numbers imply linked records, etc. Second names, Fax numbers imply linked records, etc. Progress Progress Three different proposals under evaluation Three different proposals under evaluation Decision at the coming T3 meeting Decision at the coming T3 Lund, July Lund, July 1999

SP USIM T3 USIM Allocation of Application Identifiers (AIDs)Allocation of Application Identifiers (AIDs) –USIM application(s) require IDs on the UICC –Three scenarios for their management (TP-99131) one of the 3GPP OPs applies for a RID (Registered Application Provider Identifier) and administers the list of AIDs for 3GPP (possibly ETSI which already has a RID)one of the 3GPP OPs applies for a RID (Registered Application Provider Identifier) and administers the list of AIDs for 3GPP (possibly ETSI which already has a RID) 3GPP as an organisation in its own right applies for a RID, and 3GPP or one of the partners maintains the list of AIDs for 3GPP3GPP as an organisation in its own right applies for a RID, and 3GPP or one of the partners maintains the list of AIDs for 3GPP each partner independently applies for a RID and T3 specifies the structure of the PIX (Proprietary application identifier extension) in a 3GPP document, which applies to all Partnerseach partner independently applies for a RID and T3 specifies the structure of the PIX (Proprietary application identifier extension) in a 3GPP document, which applies to all Partners –TSG-T suggested the second option as the most suitable and asks TSG-SA/PCG for endorsement

SP T3 USIM Transfer of GSM specifications to 3GPPTransfer of GSM specifications to 3GPP GSM SIM Application Toolkit GSM SIM Application Toolkit Major importance for development of operator specific services Major importance for development of operator specific services Two major problems were identified:Two major problems were identified: -Use of toolkit applications on UICCs with more than one USIM Resource problem on restructuring of documentResource problem on restructuring of document

SP T3 USIM GSM SIM Conformance Test Specification - optional GSM Phase 2+ specification GSM SIM Conformance Test Specification - optional GSM Phase 2+ specification Needs to be rewritten due to (some) different requirements - considered of secondary importance w.r.t. testing Needs to be rewritten due to (some) different requirements - considered of secondary importance w.r.t. testing Urgent requirement Urgent requirement transforming section 27 of GSM into a test specification for the UICC-Terminal interface transforming section 27 of GSM into a test specification for the UICC-Terminal interface T3 has currently no resources to do either taskT3 has currently no resources to do either task Request for funding of USIM testing (SP-99277)Request for funding of USIM testing (SP-99277)

SP Approved Documents(1) –TS : Use of Data Terminal Equipment-Data Circuit terminating; Equipment (DTE-DCE) interface for Short Message Service (SMS) and Cell Broadcast Service (CBS) –TS : AT command set for 3GPP User Equipment (UE) –TS : Terminal Equipment to Mobile Station (TE-MS) multiplexer protocol –TS : Alphabets and language-specific information

SP Approved Documents(2) –TS : Interface protocols for the connection of Short Message Service Centres (SMSCs) to Short Message Entities (SMEs) –TS : Technical realisation of the Short Message Service (SMS); Point-to-Point (PP) –TS : Compression algorithm for text messaging services –TR : Specific Absorption Rate (SAR) requirements and regulations

SP –TR : Electrical safety requirements and regulations –TR : Terminal Capability requirements (v.1.0.0) is plan to TSG-T#5 in October 1999 Documents for Information

SP Requesting to SA Request for funding of USIM testing Request for funding of USIM testing 6/8 months (see SP-99277). 6/8 months (see SP-99277). Request for funding of protocol conformance tests in TTCN for the MS interoperability Request for funding of protocol conformance tests in TTCN for the MS interoperability 6.5 years (see SP-99278) 6.5 years (see SP-99278) Request for guidance on Harmonised Regulatory Standards for 3GPP Terminals Request for guidance on Harmonised Regulatory Standards for 3GPP Terminals See SP See SP Request for endorsement of approach on Allocation of Application Identifiers (AIDs) Request for endorsement of approach on Allocation of Application Identifiers (AIDs) Request for harmonisation in Terminology Request for harmonisation in Terminology

SP Meeting Calendar Meeting No. DateLocationHost Year 1999 TSG-T#5 7-8 OctKoreaTTA TSG-T# Dec. FranceETSI Year 2000 TSG-T# Mar. SpainTelefonica TSG-T#8 5-7 June GermanyMannesmann TSG-T# Sep. Host required! TSG-T# Dec.Host required!