Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues Andrew.Hill@eurocontrol.int.

Slides:



Advertisements
Similar presentations
Part 2 ICAO FLIGHT PLAN (FPL) Part 1 Part 3 < < < < <
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
FPL2012 Message Conversion and Migration
PBN ICAO HQ Activities Overview
International Civil Aviation Organization European and North Atlantic Office OVERVIEW OF THE AMENDMENT - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
Delivering Digital Services International Collaboration - Towards the 4DT for FF-ICE Step 1 Presented By: Dr. Stéphane Mondoloni Date:August 27, 2014.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Introductory remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
APAC PBN Seminar, Bangkok, 8-10 June 2015 The Business Aviation Perspective presented by Captain Gabriel Thomas Boyda / MJETS* representing the International.
Area Nav: RNP Evolution
ICAO SARPS and Guidance Material
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
Vendors Conference Prestwick 2011 Customer Picture Implementation of Changes to ICAO FPL 2012 Christoph Kunze Lufthansa Systems 7th December 2011.
ICARD USER FORUM Recommendations and Conclusions (Paris, 20. – 21. September 2010)
Implementation of Amendment 1 to the 15 th edition of the PANS-ATM Document UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC UkSATSE Presentation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Air Traffic Management Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP RVSM Implementation in Europe.
EUR Flight Planning Guidance
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
International Civil Aviation Organization European and North Atlantic Office ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 Issues with Certain Fields.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Workshop on preparations for ANConf/12 − ASBU methodology
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Performance-Based Communication and Surveillance (PBCS)
RVSM Implementation in Europe
Workshop on preparations for ANConf/12 − ASBU methodology
ATS Route and Waypoint Implementation:
Performance Based Navigation The Future
PlaneWrong AGM Thursday 13th October
CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop
Erwin Lassooij PBN Programme Manager 30 January 2014
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Implementation of Amendment 1
the International Civil Aviation Organization
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
An update on the Service Change proposal
ASEAN PBN Routes Objectives:
ICAO 2012 Network Operations Update
Recommendations and Conclusions
2012- ICAO FPL Changes the airline viewpoint Arkady Merkulov IATA
Workshop on preparations for ANConf/12 − ASBU methodology
Eurasia Coordination Board EUR Implementation Plan
ECE 544 Protocol Design Project: Description and Timeline
Training & Documentation
AIM Global Strategy Air Navigation Procedures for AIM Seminar
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Informal document GRE-78-XX
SAM Regional Seminar/Workshop
Review plan of the nature reporting – update 6
Informal document GRE-78-10
Editing Board Meeting Status Expert Groups (Transmission, Axle)
PBN ICAO HQ Activities Overview
Regional WMS Migration Governance Meeting
Liaison Report to Date: Authors: January 2013
Presentation transcript:

Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan Amendment 1 for 2012 OLDI Issues Andrew.Hill@eurocontrol.int

OLDI data impacted by 2012 FPL 1. Equipment Capability and Status 4 Items currently specified in OLDI messages Mandatory RVSM 8.33 KHz/UHF Bilaterally agreed Mode S B-RNAV/P-RNAV 2. Co-ordination point and Route- Reference point for range and bearing

Current OLDI (Edition 4.1) Equipment capability and status in Basic messages (ABI, ACT, etc.) RVSM- letter W 8.33 KHZ/UHF- Letters Y/U Mode S - Letters S and I B-RNAV/PRNAV- Letters R and P Fix (three letters) for reference point for range and bearing

OLDI after FPL 2012 Equipment capability and status in Basic messages (ABI, ACT, etc.) RVSM - letter W- no change 8.33 KHZ/UHF - Letters Y/U no change Mode S- Letters E, H, I, L and S B-RNAV/PRNAV- Letter R for PBN approved and combination of letters and digits in Item 18 Significant point (five letters) as reference for range and bearing (as co-ordination point or in route description)

System changes Neighbours’ plans will impact system changes Depending on level of implementation and dates for migration a translation function might be required Local operational concept will have an impact (e.g. use of RNAV information for route allocation) Transition will be managed at local level and should be planned and co-ordinated with neighbours as early as possible

Schedule for producing new OLDI Edition END 2010 NOW Formal Approval/Release Draft changes ORAS Approval 1st quarter 2010 ORAS-TF/2 2nd quarter 2010

Questions?