Gemini Contingency Guidelines

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
EU Workgroup – Mod 500 WG(4) – 16 th September 2014.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Modification 500 slides for Workgroup
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 Market Trials Congestion Revenue Rights Weekly Update May 21, 2010.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Baseline Reconsultation Timeline Timeline (1) Aug SepOctNov Dec 14/8 Workshop 1: History & Timeline 17/8 Workshop 2: Methodology Brainstorm.
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Review Group 221: Option 3 – security provided after allocation.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Review Group 221: 23 January Analysis of the impacts of the proposal on Users.
Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CRR Credit Calculator CWG/MCWG 5/17/2017.
MIPI Changes October 2012.
26th IG meeting 23th January 2014
Transmission Workstream, 01 October 2009
CMP Transparency Requirements
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
Auction of Coal Linkages for Non-Regulated Sector (Tranche IV)
E-bidding for Short Term Open Access by – S
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
COR1072 Enduring Transfer and Trade Arrangements
Extended Pre-ID data corrections
Enduring NTS Exit Capacity Arrangements - Update
QSEC auction timetable
Timeline for Modifications 501 and 501A
Modification 501 slides for Workgroup
LTSEC Auction Timetable
The Treatment of “Spare / Sterilised” Capacity
Review of Trade and Transfer Winter 09/10
Mod 230: QSEC and AMSEC Timings
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Optimisation of Entry Capacity Modification Proposal
Modification 501 slides for Workgroup
Review Group 221: Review of Questions from Session 2
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Update on Market Trials
Presentation transcript:

Gemini Contingency Guidelines Auction Timelines v0.1

Agenda QSEC AMSEC RMTTSEC Short Term Auction Process Buyback Process

QSEC D-21 D D+14 D+60 D+74 QSEC Auction: Annual Unsold & Incremental Capacity 15 years (Y+2 – Y+16) Invitation letter sent at D-28 D-21 D D+14 D+60 D+74 Gemini Set Up 10 Day Bid Window Allocate in Gemini Offline Analysis Business Days Publish Risk Profile: Gemini Incident H M L

AMSEC D D+3 D+6 D+9 D-14 D+1 D+4 D+7 D+10 AMSEC Auction: Annual Unsold Capacity 2 Years (Y – Y+2) Invitation letter sent at D-28 D D+3 D+6 D+9 D-14 D+1 D+4 D+7 D+10 Unallocated Unallocated Unallocated Bid 1 25% Bid 2 25% Bid 3 25% Bid 4 25% & Unallocated Gemini Set Up Access to Reports Publish Publish Publish Publish Risk Profile: Gemini Incident H M L

RMTTSEC D+11 D+12 D+13 D+14 D+15 RMTTSEC Auction: Monthly Unsold & Surrendered Capacity (with Trade & transfer Option) Month Ahead Run Initial Allocations Correct quantity holder data for sale bids Upload Bids to Gemini Update surrender bid details Capacity Applies for Following Month Publish D D+11 D+13 D-12 D-8 D-7 D-6 D+1 D+12 D+14 D+15 D-5 Gemini Set Up Data Download Gemini Set Up Offline Analysis Trade & transfer Run Initial Allocations Correct quantity holder data for sale bids Upload Bids to Gemini Update surrender bid details Bid Surrender Offer Window D-12 D-8 D-7 D-6 Publish Risk Profile: Gemini Incident Gemini Set Up Data Download H Surrender Offer Window M L

Short Term Auction Process

Buyback Process