Neutronics questions from the PDR

Slides:



Advertisements
Similar presentations
Nuclear Power Plants. Nuclear Power Plant Turbine and Generator Spinning turbine blades and generator Boiling water Steam.
Advertisements

ESS Bunker Project Zvonko Lazić September, 2014.
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
P Fig. 6-1, p. 193 Fig. 6-2, p. 193 Fig. 6-3, p. 195.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Commercial Vent. Engine Company Commercial Vent Training – Objectives Understand why an inspection hole is important. Understand the purpose of smoke.
People Fractions. Problem 1 of 20 Answer 1 = 10 Problem 2 of 20 Answer 2 = 5.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
Exercise 7: Importance biasing Exercise 7: Importance biasing 7th FLUKA Course NEA Paris, Sept.29-Oct.3, 2008.
Reading Structural Drawings
Mitglied der Helmholtz-Gemeinschaft ZEA-1 | Technology for Excellent Science SKADI - Report FZJ Meeting Lund Romuald Hanslik FZJ/ZEA-1 1.
Framing the House. Platform Framing Platform framing.
Introduction From a neutron flux (> 20 MeV), with the Leaching model (Lessard) based on SBMS (Tables 1 and 2):
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Status of neutron simulations Piotr Mijakowski (Warsaw) ArDM meeting, 2010/12/03 1.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Ordinance Amending Orange County Code Section October 27, 2009.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Neutron Shield/Muon Veto (WBS 1.3) and Underground Installation Issues (WBS 1.6) May 11, 2009 Erik Ramberg.
DIAPHRAGM WALLS.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
PB 26 GRAPHICS.
Factoring Trinomials.
INDOOR BASEBALL / SOFTBALL FACILITY
FILL IT UP!! FILL IT UP!! FILL IT UP.
14 High Leys Drive, Ravenshead, NG15 9HQ
Framing the House                                                                                                                   
Chapter 9 Nuclear Radiation
המחלקה להנדסת חשמל ומחשבים תשע"ט (2019)
Andreas Jansson, Lali Tchelidze
Operations, Risks & Hazards
At ridge height for family room
2 or more does NOT affects.
The Bunker Project Overview Zvonko Lazic
Monte Carlo simulations for the ODIN shielding at ESS
Roof design Bunker Project CDR
Proposed Replacement of 8800PPH Steam Boiler ( )
The Common Shielding Project
Roof PSS Bunker Project CDR
Rad safety and activation
Instruments Shielding Project Installation
Electrical and fluid couplings
Senad Kudumovic Design engineer
Lifting & Handling features
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
Fill in percent and decimal
Neutron guide Shielding Concept
Technical Documentation Coordinator
Bunker Wall Design Wall
Bunker -Target interfaces
Bunker Project Schedule/Budget
Bunker Wall Design Wall ESS
Instruments – Bunker Wall interfaces
Bunker Project Operation aspects
Bunker Project Schedule/Budget
The Bunker Project Overview Zvonko Lazic
Bunker Project Integration/Interfaces
Test Beamline System Requirements and Charge to PDR Committee
BEER cave design and shielding
Dawid Patrzalek Mechanical Design Engineer
Shielding requirements for the baseline bunker shielding (current CATIA version ) Günter Muhrer
Bunker Project Interfaces introduction
Presentation transcript:

Neutronics questions from the PDR Günter Muhrer www.europeanspallationsource.se

Questions from the PDR Roof and wall Utility feedthrough Roof: Value Engineering (cost - hook height - chopper size) (Stuart) Roof: Ideal roof versus as designed (Stuart) Wall: Value Engineering (PE concrete replaced by Polyethylene, need for Pb?) (Stuart) Wall: temporary shielding (Valentina) Utility feedthrough Filling fraction (Valentina) Dilatation joints Monolith – bunker roof (Esben) Underneath the bunker wall (COWI proposed a chicane)