Wednesday h10: Programmed dump. 07h54: Injection. 200b.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday 11/07: Recovery Plenty of accesses.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Yesterday morning Held 1647 for a while – SPS kicker problem
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Wednesday morning / afternoon
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 22.3. 06h10: Programmed dump. 07h54: Injection. 200b. 08h39: Ramp. 09h18: Stable beams. 2.4e32 lumi. 09h32: Beam dump due to RQTL11.R6B1 trip. EPC and CV intervention in PM65  9 hours. Change of water manifold in PC rack. Rebooting BLM crates (missing/broken NFS mounts). New version of LSA with improvements for smoothing (K) in ramp and physics (Greg). Collimator dry ramp of collimator functions for 1.38 TeV. PNO.a3 test on RQTL11.R2B2. QH power supply discharging on dipoles of S45 (C19L5) -> fixed with access. RF tests on cavity 4B2. 24/03/2011 LHC 8:30 meeting

Collimator Settings 1.38 TeV Usual ramp functions, essentially truncated at 1.38 TeV. Use of standard energy-dependent gap interlock function! TCT's end up at 18.5 s, the TCDQ at 8.5 s. Settings after collision: Close TCT's to 14 s. Leaves 5.5 sigma margin to TCDQ. vdM scans: Assign 2 s margin at TCT's to vdM scans. Keep 3.5 s margin between TCT and TCDQ. The allowed vdM scan ranges are then (at IP, per beam, 1.38 TeV, injection optics, in nominal beam size): IR1, IR5: 3.0 s IR2, IR8: 3.1 s Functions and limits generated and uploaded into controls system. 24/03/2011 LHC 8:30 meeting

Collimator Dry Ramp 1.38 TeV 24/03/2011 LHC 8:30 meeting

Wednesday 22.3. 18h35: Precycle. 20h27: Injection. 21h08: Incorporation problem. 21h42: Ramp. 22h20: Stable beams. 2.57e32 lumi. RF trip 4B2. 05h30: Parasitic studies on leveling by vertical beam-beam separation in IR8. Possible in IR8 in stable beams due to small changes at TCT. Head-on to 2.5 s separation insteps of 0.5 s, lumi reduced by factor ~3 for maximum separation. No effect on lifetime or losses. No reduction in luminsoity in other IR’s (indicates insignificant emittance growth or none at all) To be analyzed in detail (bunch by bunch in FBCT) 24/03/2011 LHC 8:30 meeting

Parasitic beam-beam study W. Herr T. Pieloni G. Papotti IR8 Luminosity Lifetime 24/03/2011 LHC 8:30 meeting

Fill 1647 24/03/2011 LHC 8:30 meeting

Luminosity in Fill 1647 ATLAS: 6.16 pb-1 CMS: 6.25 pb-1 24/03/2011 LHC 8:30 meeting

Note: no 50 ns nor 25 ns required over the weekend Incoming Thurs AM 1.38 TeV commissioning (after SPS injection kicker is fixed) Thurs PM 1.38 TeV stable beams Fri inter-fill ADT/AGC Fri PM/night 1.38 TeV Sat Energy gaps interlock test 1 h Sat PM 1.38 TeV (plus extra ramp for quench test) Sat night Back to 3.5 TeV, test ramp, physics Sun AM/PM Transfer lines tests 3 h Aperture measurment TI2/8 3h Intensity increase with 75 ns 2 h Sun PM/night Physics continued Mon 06:00 Dump beams for TS Note: no 50 ns nor 25 ns required over the weekend 24/03/2011 LHC 8:30 meeting

Outstanding Injection of 96 bunches ( weekend) Timing distribution ( technical stop) FGC firmware update Collimation system controls fix 1.38 TeV setting-up ( Thursday onwards) Crossing angle all zero: OK TCTs to set up & loss maps Interlock tests for the roman pot ( parasitic or TS) RF voltage limit interlock Longitudinal blow-up ( if needed) Wire scanners Abort gap cleaning ( with high intensity injection) Injection gap cleaning ( with high intensity injection) 24/03/2011 LHC 8:30 meeting