Challenges and Deadlines for Production

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Hydraulic Cylinders Actuators
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
Vacuum Vessel Production Readiness Review
MMEC LLC dba MidwestMetalcraft & Equipment 200 Industrial Drive Windsor, MO Office: (660) Fax: (660)
ARCS Sample Manipulation Concept Overview. ARCS Sample Area.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Compressor status AWAKE Technical Board meeting 19 May 2015.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Center for the Advancement of Natural Discoveries using Light Emission Vacuum system for the AREAL linear accelerator Vacuum Systems A.Gevorgyan.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Manufacturing process, validation and factory test
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
COMPANY INTRODUCTION S & C Co., Ltd.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
ELENA installation progress F. Butin / ELENA collaboration.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Sub-system integration for the VBOX
Crab – RFD prototype: Production Status Update
Preliminary Y-chamber specifications – First draft
Structural aspects related to the vacuum vessel of the SHIP Project
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
CRYOMODULE FINAL ASSEMBLY
Overview of the TARGET Monolith Rough Vacuum
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Challenges and Deadlines for Production Marcin Wojciechowski Nov. 09, 2016

GB core: Functional elements: Gamma Blocker overview Stainless steel block, ø200x200 [mm] Two secure positions: on-axis and off-axis Functional elements: Vacuum chamber Beamline flanges Positioning device Support

Vacuum chamber Beamline flanges Positioning device Gamma Blocker overview Vacuum chamber Pressurized UHV-class vessel Beamline flanges Compatible with beamline dimensions, UHV compatible Positioning device Manual operation, Electric/pneumatic actuator Self locking (forces: gravity, vacuum) UHV compatible: sealed with welded bellow

Gamma Blocker Proposed solution: Cylindrical vacuum chamber, with two CF DN160 ports for beamline DN350, CF type flange mounted positioning module Welded bellow Industry-standard linear motion system Trapesoidal thread and nut based Manually driven Position indication Independent position locking Outline: max 1m from axis

Gamma Blocker Proposed solution: Cylindrical vacuum chamber, with two CF DN160 ports for beamline DN350, CF type flange mounted positioning module Welded bellow Industry-standard linear motion system Trapesoidal thread and nut based Manually driven Position indication Independent position locking Outline: max 1m from axis

Keeping the schedule in preliminary stage Gamma Blocker challenges: Keeping the schedule in preliminary stage Recalculation of doses Changes in construction idea Additional interfaces to MPS/PPS Requirements on actuator materials (radhard)

Gamma Blocker production schedule & deadlines: KickOff Preliminary Design 2016.12.09 Preliminary Design Report 2016.12.30 Detailed Design 2017.03.31 Critical Design Report 2017.04.21 Purchases 2017.09.29 Production & deliveries 2018.01.31 Final assembly 2018.02.14 Factory tests 2018.03.09 FAT Report 2018.03.30 GB Facility Elements delivery 2018.04.29 SAT Report 2018.06.01 Installation Readiness Report 2018.11.30 Note: deadlines for NCBJ

Production: NCBJ experience: Accelerators: Small machines for medicine, industry and science (i.e. GBAR) Large machine accelerating cavities (PIMS modules for Linac4) Components for nuclear reactor Maria @NCBJ (i.e. for cooling systems) Nuclear medicine facilities equipment (bunker doors, treatment tables)

CNC milling/turning centres WaterJet cutting machine NCBJ resources: CNC milling/turning centres WaterJet cutting machine Sheet metal bending press Welding facility Clean rooms Vacuum ovens Chemical treatment facility Precision welding facility Quality control witch 3D geometry measurement Vacuum testing facility