Workshop on fire protection for physics research facilities

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Preliminary Studies of the Electric Power Distribution for CLIC
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
FCC Week 2015 Program of I&O presentations Ph. Lebrun 25 February 2015.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
FCC Tunnel Civil Engineering and Geology John Osborne (CERN GS-SE) 4 April 2014.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
Accelerator Group for LHeC LHeC Meeting at CERN; October Questions raised by Max  does the e-ring fit into the tunnel?  can one bypass ATLAS and.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
DGS/SEE Seminar on Fire Protection for Physics Research Facilities 7 and 8 October 2015 CERN Introduction status and perspectives S. La Mendola DGS/SEE/XP.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
Extraction and beamline progress B.Goddard TE/ABT.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Survey Meeting John Osborne, CERN 8 February 2016
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
HF2014 Workshop, Beijing, China 9-12 October 2014 Constraints on FCC-ee lattice design Bastian Haerer Constraints on the FCC-ee.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
1 Building Design Progress Dan Wilcox March 2012.
FCC Week April 2016 Rome FCC collaboration “fire safety” S. La Mendola and M. Plagge HSE/SEE/XP R. Trant TE/HDO 14/04/
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Future Circular Collider Study Volker Mertens 2 nd FCC Week, Rome, April Infrastructure and Operation Overview Volker Mertens, CERN on behalf of.
Supply and Distribution of Electrical Energy
FCC Underground Infrastructure
Civil Engineering for FCC-eh and LHeC
Civil Engineering update - alignment configuration
FCC Civil Engineering Optimisation and Design Development
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
IT-4189 Supply and installation of a cryogenic distribution system
CLIC Civil Engineering & Infrastructure Working Group Meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
FCC Safety Strategy for the Conceptual Design Report
CLIC Civil Engineering & Infrastructure
FCC Civil Engineering John Osborne & Jo Stanyard (SMB - Site Engineering - FAS Section) FCC week outline 10th May 2017.
Acknowledgements to all FCC study teams
News from Integration WG
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
FCC Civil Engineering update
FCC-ee MDI Civil Engineering update
FCC Tunnel and Shaft Cross Sections
XFEL Vacuum System Commissioning
Civil Engineering for FCC-eh IR
Preparation of FCC Week 2018 (programme, attendance)
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
Infrastructure and Operation Summary
WP 2 Update Fire Detection and Extinguishing FCC Collaboration
FCC study – Fire collaboration WP4 Status & Update
FCC Week 2019 Civil Engineering Summary
FCC Week 2019 ( ) V. Mertens IOWG
North Area Safety Review 2019
Presentation transcript:

Workshop on fire protection for physics research facilities 20-21 June 2017 European Spallation Source FCC study – Design solutions being proposed by the Infrastructures & Operations Working Group Updated to FCC week 2017 S. La Mendola HSE/SEE/XP 27-May-19 EDMS no: 1817640

Summary Civil engineering; Integration; Electrical distribution; Air management; (Reliability); Safety strategy; Discussion; Full presentations available at https://indico.cern.ch/event/556692/timetable/#20170529.detailed 27-May-19 EDMS no: 1817640

FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard Shaft at point F is 476 meters deep! 27-May-19 EDMS no: 1817640

FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard Shafts F and G are removed in this option. 30 km long bypass tunnel. 27-May-19 EDMS no: 1817640

FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard 27-May-19 EDMS no: 1817640

FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard 27-May-19 EDMS no: 1817640

FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard 27-May-19 EDMS no:

Civil engineering for FCC-eh Interaction Region FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard Civil engineering for FCC-eh Interaction Region 27-May-19 EDMS no: 1817640

Underground structures, F. Valchkova-Georgieva 27-May-19 EDMS no: 1817640

6 m FCC-hh 3D, dipole, compartment wall/cryogenic jumper, transport vehicle F. Valchkova-Georgieva 27-May-19 EDMS no: 1817640

Shafts, F. Valchkova-Georgieva 27-May-19 EDMS no: 1817640

Underground structures, F. Valchkova-Georgieva 27-May-19 EDMS no: 1817640

Tunnel cross section, FCC-hh, F. Valchkova-Georgieva 27-May-19 EDMS no: 1817640

Supply and distribution of Electrical Energy, Davide Bozzini 27-May-19 EDMS no: 1817640

Supply and distribution of Electrical Energy, Davide Bozzini Second and third source as well as uninterruptable supply are also defined 27-May-19 EDMS no: 1817640

Supply and distribution of Electrical Energy, Davide Bozzini 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon Concept developed also for Cryo, d and b collimation, RF and beam dump points 27-May-19 EDMS no: 1817640

A ventilation system for the FCC tunnel, M. Nonis, G. Peon 27-May-19 EDMS no: 1817640

FCC availability studies, Andrea Apollonio, Arto Niemi Interesting approach: could be applied to safety systems; Note: accidental events (e.g. fire) were not included in the study; 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

FCC safety strategy for the Conceptual Design Report, Th. Otto 27-May-19 EDMS no: 1817640

Open discussion Length of fire compartments; Compatibility of compartmentalization with Helium spill; Early fire extinguishing, guided evacuation and search & rescue by rail-mounted robots; Shaft cross section (protected stairs with no intermediate landings); Use of alcoves as rest areas (separate compartment); Hi voltage distribution in the tunnel / (dry) electrical transformers in the alcoves; Ventilation / smoke extraction system Safety approach Etc. 27-May-19 EDMS no: 1817640

Thank you for your attention! 27-May-19 EDMS no: 1817640

27-May-19 EDMS no: