National Services Business Analysis and HL7

Slides:



Advertisements
Similar presentations
Getting Control of Your Projects! Kirk Schanzenbach NY State Comptrollers Office.
Advertisements

Bite sized training sessions: Objectives & Principles.
Brian Farrington Ltd Procurement & Supply Chain Specialists Brian Farrington Limited Rainford Hall, Crank Road, St.Helens, WA11 7RP T: F:
Chapter 3 Project Initiation
إدارة المشروعات Projects Management
The Analyst as a Project Manager
Topic 10Summer London Ambulance System Some of the slides created by Sommerville.
Traditional Project Management Vs. eXtreme Project Management.
Requirements Engineering Process – 1
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Practitioners versus Academics Software Engineering Problems Academics Practitioners.
MISG 30 October 2006 METERING INTEROPERABILITY STEERING GROUP Philip Davies Director of Retail Markets and Environmental Policy.
CIMI + FHIR Grahame Grieve 10-August 2015 Salt Lake City.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Where Agile Business Meets Agile Development Agile Building Blocks: People Dave Yardley.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Outsourcing Partnership Shared Perspectives. Introduction This is a presentation based around an outsourcing project I have participated in within the.
REAL WORLD RESEARCH THIRD EDITION Chapter 8: Designs for Particular Purposes: Evaluation, Action and Change 1©2011 John Wiley & Sons Ltd.
Thoughts Before Requirements Gathering. Requirements Gathering Functional Requirements – Functional requirements explain what has to be done by identifying.
Fleming College Quality and Risk Management Review Summary November 10, 2005.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
Data Standards and Products - Implementation The role of the CfH Interoperability Toolkit (ITK) in information sharing 13 th October 2009 Keith Naylor.
Team Skill 6: Building the Right System Assessing Requirements Quality (29)
1 Team Skill 1 - Analyzing the Problem Continued and Product Features and Challenges Sriram Mohan.
د. باسم ممدوح الحلوانى Lecture 3 Scope Management.
Martin Whittaker, Touchstone Consultancy Ltd, National Services Business Analysis and HL7 Martin Whittaker, Touchstone Consultancy.
1A FAST EXCELLENCE THROUGH FACILITATION Gary Rush The FAST Process MGR Consulting
Requirements engineering The process of establishing the services that the customer requires from a system and the constraints under which it operates.
Martin Whittaker, Touchstone Consultancy Ltd, The Benefits of Joining HL7 UK Martin Whittaker Touchstone Consultancy Ltd
Project Management Enabling Quality Marien de Wilde, PMP April 2007.
© 2013 MHA Consulting All Rights Reserved. 0 Presented by: Richard Long March 10, 2015 Business Alignment Or How I Learned to Stop Saying “IT”
Practical IT Research that Drives Measurable Results Establish an Effective IT Steering Committee.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Conduct Procurement-II
Change Management Communication Plan
Effective Time Management
Integrating Data From Multiple Schedules
SA&S-Fortnightly Status Report – Overview Period Ending 3rd May 2017
Systems Analysis and Design in a Changing World, 4th Edition
Project Learning in Capstone Design
Rapid Application Development
Agenda Time Activity 1410 Welcome and introductions 1415
Project Management Apprenticeships
Assist Knowledge Development, Ltd.
DACT Treasury Fair 2012 BELLIN GmbH
Requirements Elicitation – 1
Team member, Team member and Team member
By Kean Tak, MSc, Lecturer at RUPP
Procurement Management Information System (PMIS)
Project Learning in Capstone Design
ONC P2 FHIR Ecosystem Task Force
How to answer exam questions for Paper 1 GCSE History Modern World
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Handout 1: Manage personal performance
Applied Software Project Management
Requirements Engineering Process – 1
SA&S-Fortnightly Status Report – Overview Period Ending 1st June 2017
Team member, Team member and Team member
Handout 1: Manage personal performance
Applied Software Project Management
Enduring Solution – Stage 2 (ES-S2)
Destruction vs. Preservation
How to write a story.
10 ways to sink a project Be vague ! Begin execution ASAP!
Software Requirements
or are "Cyberspace" and "Cyber Space" the same?
Software Requirements
User Personas Templates
What was Happening? A lot of talking, not a lot of action.
Presentation transcript:

National Services Business Analysis and HL7 National serviices Business Analysis and HL7 - Martin Whittaker 12 December 2003 National Services Business Analysis and HL7 Martin Whittaker, Touchstone Consultancy Ltd martin@touchstone.uk.com Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

What are National Services? National serviices Business Analysis and HL7 - Martin Whittaker 12 December 2003 What are National Services? Interaction between Spine and national systems Spine Services New Common Applications and Services Existing National Applications Knowledge Sources Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

What is Business Analysis? Scope the domain Agree scope with stakeholders (clinicians, DA, suppliers…) Document business processes, including assumptions and issues Define comms requirements Hand over to comms team Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com Domain Scoping What business areas are included? OBS/Schedules Talk to stakeholders Talk to DA Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com Problems Nobody has done this before Speed Detailed design in OBS Confidentiality Stakeholders have very different views Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Document Business Processes The business processes don’t exist yet Reality changes, eg TMS maturing PDS/NSTS situation Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Define Comms Requirements How far can you assume the solution? Messaging? HL7 V3? Data Dictionary vs HL7 codelists Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com The Ideal Way Fully-sorted design model Two strands: Commercial documents (OBS etc) Design documents Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com The Practical Way Constraints Political pressures Confidentiality NHS traditions Result OBS is design document Consultation is limited Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com Benefits Speed Political success Commercial satisfaction Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com Risks Incomplete analysis Incompatible solutions in different areas Technical cul-de-sacs Lack of clinician & staff consultation Incomplete take-up Lack of supplier consultation Incompatible solutions How proven is the solution? Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com Successes Contracts have been placed A lot of work has been done Most stakeholders happy Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com What Happens Next? Understanding of suppliers’ solutions Proof of the pudding HL7 approves the messages Localisation??? Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

“May you live in interesting times” Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com

Martin Whittaker, Touchstone Consultancy Ltd, martin@touchstone.uk.com