P17250: Robofish Charging Station

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

Time Management Day 4 12 th August 2010 Session 2 Leadership Practices.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Planning. SDLC Planning Analysis Design Implementation.
Personal Software Process Overview CIS 376 Bruce R. Maxim UM-Dearborn.
S/W Project Management
Software Project Planning CS470. What is Planning? Phases of a project can be mostly predicted Planning is the process of estimating the time and resources.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
Styles of Leadership LET II. Introduction Leadership styles are the pattern of behaviors that one uses to influence others. You can influence others in.
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
IS2210: Systems Analysis and Systems Design and Change Twitter:
© 2014 International Technology and Engineering Educators Association STEM  Center for Teaching and Learning™ Game Art and Design Unit 2 Lesson 1 Skills.
Project Closeout Report. Closeout Components Project Objective Results Deliverable Results Lessons Learned Summary and Team Feedback Final Project Organization.
* Start coding sooner – Procrastination * Write the documents for later use, not to “just get it done” * Very little code reuse, many people solving the.
Eng. Technology Project SE 101 LACC Team #. NOTE The following is just a model. You are not limited to it. You are welcome to expand it as much as you.
Fundamentals of Project Management and Schedule Development.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
TRELLO. WHAT IS TRELLO!? Trello is a project management tool that makes collaboration easy. This visual list tool can do so much more, whether you're.
Methodologies and Algorithms
Fluid Power Challenge Suggested Workshop Lessons
Software Engineering Management
Robofish Charging Station (RCS) P17250
Managing the Project Lifecycle
Systems Analysis and Design in a Changing World, 4th Edition
Quiz: How Are Your Meetings
Sample Wiki Comments?.
Working in Groups in Canvas
Section 5: Technology Design Skills
appfluence.com MANAGING MULTIPLE PROJECTS
Methodologies By Akinola Soyinka.
Skillz That Killz Team 3 Final Presentation
EPICS Design Review Template Notes:
Growth Mindset vs Fixed Mindset
Studio 1. Course Assessment Policy and a Quick Guide to Meetings
ENGM92 Communication Unit 3
EPICS Conceptual Review Template Notes:
Robofish Charging Station (RCS)
By Kean Tak, MSc, Lecturer at RUPP
Software Requirements analysis & specifications
Level 4 Diploma in Dance Teaching
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
P17082 Biomechanical Elbow Model Build and Test Review
Writing as Inquiry and Collaboration
Troubleshooting Circuits
In this tutorial you will:
Complexity vs. Human Factors
FOUNDATIONAL CONCEPTS
Game Art and Design Unit 2 Lesson 1 Skills in the Game Industry
Problem Definition Review
Robofish Charging Station (RCS)
Quality Assurance Functionality:
How to keep your Enterprise GIS Project on Track
P17082 Biomechanical Elbow Model Build and Test Prep
Stress Management Techniques
PMI-SVC Scheduling Forum
Art of Delegation in a USPS Setting
Effective Planning and Time Management
P11017 Tactile Navigation Interface
CAD DESK PRIMAVERA PRESENTATION.
Chapter 11 Management Skills.
Basic Study Skills Student Name
ISE – Systems Design Review
Co-production: Enablement Tracking & Reporting
Presentation transcript:

P17250: Robofish Charging Station MSD II Gate Review P17250: Robofish Charging Station

Agenda Project Status Schedule Review Issue Management Review Suggestions for Future Work What Worked Well Lessons Learned Status of Deliverables / Edge

Project Status Function Overview Harvest Energy Store Energy Attach Robofish Dock Robofish Charge Robofish Reliable Structure Stable & Buoyant Protect / House Electronics JM

Project Status Table 1: Customer Requirements vs Performance Table 2: Engineering Requirements vs Performance JM

MSD II Schedule Review - Dates Table 1: Scheduled completion dates vs actual completion dates for major tasks Task Scheduled Completion* Actual Completion Finalize test plan 2/8 2/7 Fix the Robofish N/A Mech. Subsystem - Frame & Connector 2/27 3/1 Mech. Subsystem - Guides 5/4 Elec. Subsystem - Robofish Circuit 2/21 4/11 Elec. Subsystem - RCS Circuit Soft. Subsystems 2/22 Integration of Major Subsystems 3/3 Completion of Test Plan 3/17 5/5 *From original schedule, started on 1/23 JM

MSD II Schedule Review - Hours Table 2: Scheduled hours vs actual hours for a sample of tasks completed Task Scheduled Hours Actual Delta Fix the Robofish 20 >18 * Mech. Subsystem - Frame & Connectors 50 +30 Mech. Subsystem - Guides 15 25 +10 Elec. Subsystem - Robofish Circuit 16 -1 Elec. Subsystem - RCS Circuit 18 >60 +42 Soft. Subsystems 38 40 +2 *Not completed JM

Lessons Learned - Jack Obstacle Cause Effect Lesson Learned Table 3: Jack’s major lessons learned Obstacle Cause Effect Lesson Learned Unclear or non-applicable tasks on schedule Inexperience with certain project tasks Team members felt lost when looking at what they should do next If you do not have experience with a task, work with the person who will be performing it to help define it Time Management / Prioritization ‘Suggested deadlines’ & School work Team placed other work / activities before MSD tasks Set strict deadlines ahead of time for each task Several systems did not work as designed Idealized thinking Schedule fell behind Create prototypes, other feasibility analyses can fall short Other Comments About the Schedule MS Project was an obstacle Schedule too detailed for first experience (~250 tasks) Many tasks were completed by people they were not assigned to Make sure the team knows ahead of time what is expected when tasks are delegated The task due date is not when the first attempt is due JM

Issue Management Review Overall most issues were resolved, and the solution proved to be successful Biggest issues were: RoboFish - see outstanding issues Float/Guide adhesion - tested multiple different types but ultimately found that Velcro adhesive stuck well to the polyethylene floats and will allow future team to change the guides while keeping the floats intact Scheduling pool time Customer communication Outstanding Issues: Most issues reside with the RoboFish not working properly Ran out of time to fully ensure the RoboFish is waterproof This caused us to be unable to fully test our guide and docking system CP

Suggestions for Future Work RoboFish New, larger, more flexible electrical box Remote control Data gathering Investigate Electronics Failures RCS Multiple RoboFish charging Weatherproof Interface with the RoboFish - Communication and/or Docking system JN

What worked well Splitting up the team into sections: Electrical, Mechanical, Software Having a variety of skillsets Having a common communication medium (Google Hangouts) and a singular repository that we can all edit (Google Drive) BM

Lessons Learned - Lucas There were pullup resistors in the Arduino that caused the prototype to malfunction. The lesson here is not to expect everything would work the way you want it just because it worked the way you expected before. When shifting to other components, expect there to be issues and use the Serial built into the Arduino to debug everything that could possibly go wrong If you do not know how to do something well, it’s better to ask someone more knowledgeable than messing it up. Afterwards, it’s important to observe and learn from them so you can do it yourself the next time with more confidence. LA

Lessons Learned - Chris To finalize all components in MSD I Order parts sooner Stick to a tighter schedule and ensure tasks are clearly defined Allow us to test sooner Troubleshoot sooner Make necessary changes sooner There will always be issues Communication Pool Access CP

Lessons Learned - Brittany Don’t underestimate shipping costs Don’t underestimate the time it takes to fill out orders When ordering electronics, sometimes it’s best to order extras Plan for unexpected expenses If a special location or service is required, include those costs in the budget For example, lifeguards for pool testing The more sources/references, the better Don’t be afraid to ask for help, whether it be from a classmate, professor, or mentor BM

Lessons Learned - Johan Don’t overestimate work to be done Process is important Get work done earlier than later Make a decision and a plan early, and stick to it. Stop going back and forth about trifles. JN

Lessons Learned - Garrett Breadboard early, breadboard often, and breadboard before you order a PCB Delegate more Make sure delineation of duties is clear to everyone When trying to help someone troubleshoot, start with the basics GB

Status of Deliverables and Edge Should just be a yes/no checklist BM