PRB PHASE II STRESA 7-8th MARCH 2006 Marne River Basin (France)

Slides:



Advertisements
Similar presentations
NGO work with the implementation of the Water Framework Directive in Finland Hannele Ahponen Water project coordinator Finnish Association for Nature Conservation.
Advertisements

UNW-DPC International Workshop Institutional Capacity Development in Transboundary Basins Lessons learned from practical experiences 10 – 12 November 2008.
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
1. 2 Content Principles of the Water Framework Directive WFD and Agriculture WFD and CAP.
Wet Woodlands and the Water Framework Directive Ben Bunting, South West River Basin Programme Manager.
1 Dr. Anne Schulte-Wülwer-Leidig Assistant Manager ICPR International Commission for the Protection of the Rhine Transboundary Cooperation in Water Management.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
Enhancing Access to Information and Public Participation in Environmental Decision-making UNDP-GEF Danube Regional Project Component 3.4 Magda Toth Nagy,
Why can voluntary agreements between water companies, farmers and authorities help to implement the European WFD and CAP reforms? Ingo Heinz University.
CSC 6 February 2008 The Don Catchment as an Opportunity Facilitating Answers to ICM Dr. Jonathan Hillman.
1 Water Framework Directive implementation from a democratic representatives to a democratic participation The Public Participation in the Water Framework.
International Network Network of Basin OrganizationsInternationalOffice for Water PARIS Paper of Mr. Jean-François DONZIER Paper of Mr. Jean-François DONZIER.
1 EU Water legislation PEIP National Workshop – Montenegro Budva, May 2008 Dagmar Kaljarikova Policy Officer for Turkey, Montenegro, NGOs and REC.
Water Framework Directive An Introduction David Whiles Anglian River Basin Manager.
Issues on China Water Law and Water Resources Management LIU Heng Nanjing Hydraulic Research Institute.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Ecologic.de Public Participation- Key element of EU Water Policy Nicole Kranz Ecologic - Institute for International and European Environmental Policy.
1 European Topic Centre on Water Workshop on: Identification of surface water bodies under the Pilot River Basin Initiative Monitoring Water Bodies Steve.
Cost recovery study for the Seine Normandie RBMP.
SEVENTH FRAMEWORK PROGRAMME Eng. Elisabetta Ferramosca.
Water.europa.eu Compliance Checking of River Basin Management Plans Strategic Coordination Group Meeting, 4-5 November 2009 DG Environment, European Commission.
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
Framework for Water Management – challenges at national/local and trans-boundary scale Water Framework Directive implementation Gordana Kozhuharova, REC,
Identification on Significant Pressures - Surface Water Bodies
Participation as a Pivotal Element R. Andreas Kraemer & Nicole Kranz
WAgriCo An NFU Perspective
Draft Mandate Johannes Grath Balázs Horvath (DG Env)
The Rhine and its water quality
Rhine – ICPR approach towards climate adaptation
New Work Programme and mandates 2005/2006
Groundwater legislative framework
Plateforme ECOBAG Inter-regional Platform «Water and sustainable development» of Adour-Garonne River Basin ECOBAG Connecting science and stakeholders in.
Agriculture /diffuse pollutions
DG Environment, Unit D.2 Marine Environment and Water Industry
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
State of play of French progress in cost-effectiveness analysis
Workshop 28 may 2008 Diffuse Sources: prevention first
Inventory preparation for priority substances
CIRCA Accessibility Strategic Coordination Group,
toitototototoot toitototototoot
WG 2.9 Best Practices in River Basin Planning
Groundwater monitoring within the WFD
Outcome and Perspectives Pilot River Basin Workshop
Pilot River Basin Activity
CIS-Workshop on River Basin Management Plans 8 and 9 May 2006 Bonn
IMPLEMENTATION OF ARTICLE 9
Is the cost benefit analysis alone, relevant to conclude on disproportionate costs? The example of the evaluation of of PoMs in the Sèvre Nantaise river.
Outcome of 2^ Seminar of the WG 2.7 Roma, January
Updated information on integration of EU water policy into WISE WD meeting June 2008 Unit D.2 Water and.
Strong needs for coordination at EU level
Pilot River Basin Water Framework Directive.
Activity on WFD and Agriculture
Scheldt Pilot River Basin
Part I.
NIVA - Norwegian Institute for Water Research
Common Implementation Strategy for the Water Framework Directive
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
WG Integrated Testing in Pilot River Basins
Compliance checking of RBMP An inventory of questions
Proposal for a workshop on monitoring EURO-INBO 2013
‘WFD in the Mediterranean’ Conference outcome
CIS WG D meeting 7 April 2011 DG ENV, Brussels
7th Environment Action Programme to 2020 Living well, within the limits of our planet Evaluation - COM (2019) May 2019.
Concept paper on the assessment of WFD River Basin Management Plans
Brussels – 20 April 2007 European Commission - DG Environment
Assessment scales and aggregation
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Andrea Tilche Unit Head of the Water Key Action
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

PRB PHASE II STRESA 7-8th MARCH 2006 Marne River Basin (France) BELGIUM GERMANY SWITZERLAND NETHERLANDS UNITED KINGDOM FRANCE SEINE- NORMANDIE BASIN MARNE ITALY PARIS CHALONS EN CHAMPAGNE

Two questions of Lorenzo What has been done in Marne PRB during 2005 ? The Water Agency organized the first public consultation (Prefet is the Legal Authority, Water Agency is Manager and Operator) What are our ideas / projects for year 2006 ? Link to research : Transfer of results and tools from research to water managers, Preparation of the 9th program 2007-2012 of the Water Agency with the perspective of WFD management plan

Together, we can make a big splash ! Survey of public opinion about : ● main problems on Seine-Normandie catchment ● priority actions for resolving the problems ● time table for developing management plan until 2008 => 16 847 responses

First results of 2005 consultation Priority to stop water pollution by toxics substances (pesticides and heavy metals), Prepare management of crisis periods (drought and flood), with local public, Develop Information and education, More transparency about price of water, Enforce “polluter, pay” principle, Solidarity with south people.

Other results The public cares about environment and favors preventive actions Urban people accept to pay more for water Consumers are confident about quality of tape water but worry about quantity problems From specific consultation of councils (department, chamber of commerce and industry,…) : Councils focus on quality of drinking water Councils worry about inadequacy of financial resources with regard to WFD objectives

Lessons Learned : many questions are not resolved… What is the best way to inform the public ? media national or local (TV, newspapers…), internet, direct mailing, public debate, How to restitute citizen opinion ?, Is the wide public really concerned ?.

Perspectives for Public Participation The main challenge : being able to answer How can we integrate public opinion in River District Management Plan ? A good point : Targets, Schedule, and Frame of Consultation Documents are precisely determined (guidances are helpful)

WG B – Link to research projects Marne PRB projects for 2006 WG B – Link to research projects There is a close collaboration between water managers and interdisciplinary research programs : Since 1989 at the scale of the Seine basin Since 1995 about the Seine estuary PIREN-Seine

Tool box PROSE STREAM STICS SiAM-Rive SENEQUE Urban waste water Agricultural practices PROSE Processes in main axes STREAM erosion STICS N dynamics in soil SiAM-Rive Estuarine processes Discharge to the sea SENEQUE Processes in drainage network Punctual sources Diffuse sources infiltration SiAM-ELISE Costal eutrophication SENECAM Upstream processes MODCOU transfers in aquifers CAWAQS Coupled processes aquifers – drainage network Toxic blooms Quality of surface waters Quality of ground waters Ecological functioning

PIREN-Seine agenda for 2006 Transfer of results and tools from research to water managers ● A big workshop researchers/managers about transfer and prospective use of the toolbox : models and data treatments. ● Several thematic seminars : ecotoxicological risks in rivers, relationship between habitat and ecological status, … ● Synthesis documents, popularization of the results. ● International symposium about Interactions among Rivers, their Watershed and the Sociosystem : Man and River Systems II, Paris, 4-6 December 2006 (http://www.sisyphe.jussieu.fr/internet/piren/)

Water managers agenda for 2006 Regional actions : ● Build the 9th program 2007-2012 of Water Agency : Where to put money to be the more efficient for water quality ? ● Build a “Seine river management plan” WFD actions : ● Improvement of article 5 report ● Gather elements for public debates ● Prepare first versions of programme of measures and river basin management plan

Perspectives for 2006 Collaboration between researchers and water managers should be fruitful There should be interesting results to present in the context of the PRB exercise

Thank you for your attention