UPDATE on SVN & MANTIS Upgrade

Slides:



Advertisements
Similar presentations
CTI UPDATE ON TTCN-3.ORG Silvia AlmagiaMTS#60 1 Oct 2013 © ETSI All rights reserved.
Advertisements

MTS#59 - Input from CTI Silvia Almagia May 2013
1 Imaging Upgrade Presenter: Kim Rinn Date: June 30, 2009.
World Class Standards On ETSI’s TTCN-3 Web Site Stephan Schulz, Ph.D. ETSI CTI © ETSI All rights reserved T3UC, Stockholm, Sweden, May 31 st 2007.
Object-Oriented Analysis & Design Subversion. Contents  Configuration management  The repository  Versioning  Tags  Branches  Subversion 2.
Florida Public Hurricane Loss Model - v5.0 ( Computer Science ) Diana Machado - Raul Garcia School of Computing and Information Sciences Florida International.
TTCN-3 Language Maintenance and Evolution TTCN-3 User Conference 2011, Bled Gyorgy Rethy STF 430 Leader
Technical Overview. Project Overview Document Library Document List Index TransmittalsPlanning.
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Meeting Date: TST #21 Document.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
ATS code development workflow Group Name: TST WG Source: Mahdi Ben Alaya, TST WG vice chair, SENSINOV, Miguel.
1 DIRAC Project Status A.Tsaregorodtsev, CPPM-IN2P3-CNRS, Marseille 10 March, DIRAC Developer meeting.
TOP project – STATUS UPDATE & Workflow demo
Security SIG#6‘ in MTS 26th November 2012 Agenda & report
CONFORMIQ DESIGNER 2012 MTS #55 Meeting.
Automated Interoperability Testing
TTCN CONFORMANCE TEST SUITE TTCN-3 Part 1 & Part 9 STF 487 MILESTONE 2
Generator Services planning meeting
Automated Interoperability Testing
ETSI related TTCN-3 activities and issues
like you to do and submit as well.
Characteristics of documents
MTS#59 - Input from CTI Silvia Almagia May 2013
Selection of maps at VDC level Updated 27 May 2015
PIE Planning & Resources
Automated Interoperability Testing
TTCN-3 Status Report.
TTCN-3 Website Project Presented by ECT for MTS#57
Revision of EG CTI October 2013
dr György Réthy, Ericsson
STF 442 Specialist Task Force initiated by ETSI MTS Manpower Duration
CTI Update on LIBSIP and TTCN-3.org
ETSI ES Using XML schema with TTCN-3
TDL Open Source Project (TOP) Input to MTS#70,
ETSI TC MTS TDL SC meeting Reports
TOP project – status update for mts#72
Security SIG#7 in MTS 18th January 2013 draft Agenda
STF430 Final Report Summary
Update on LIBSIP and TTCN-3.org
TTCN-3 CONFORMANCE TEST SUITE STF 451 STATUS REPORT
TDL and TOP Development at MTS
ETSI TC MTS TDL SC meeting Reports
Update on LIBSIP and TTCN-3.org
Security SIG#6 in MTS 19th November 2012 draft Agenda
UPDATE on SVN & MANTIS Upgrade
ETSI TTCN-3 Test Suites QUALITY IMPROVEMENT
ETSI TC MTS TDL SC meeting Reports
UPDATE on PICS GUIDE (EG ) REVIEW
UPDATE on SVN & MANTIS Upgrade
Revision of EG CTI October 2013
ETSI TC MTS TDL SC meeting Reports
UPDATE on PICS GUIDE (EG ) REVIEW
UPDATE on SVN & MANTIS Upgrade
40TD11 STF276 – Status (including TPLan and T3Doc)
KINDLE YOUR PASSION FOR WRITING, WITH OUR HELP
PSS0 Configuration Management,
UPDATE on SVN & MANTIS Upgrade
UPDATE on how TDL-TO is used at ETSI
TDL and TOP Development at MTS
ETSI MTS#76 Meeting 23-Jan-2019
PIE Planning & Resources
2016 Queen’s Printers Association of Canada Conference
STF 491: TTCN-3 Evolution 2015 Final Report summary
STF393 Final Report Summary TTCN-3 Language Maintenance
CTI/MTS collaboration - 3GPP TF160
Introduction to TDL and TOP
UPDATE on PICS GUIDE (EG ) REVIEW
TTCN-3 Editorial Team (TET) Status Summary
Canvas introduction for students
Presentation transcript:

UPDATE on SVN & MANTIS Upgrade CTI May 2014 Presented by Sebastian Müller for MTS#62 © ETSI 2013. All rights reserved

Status Update for MTS#62 Migration of SVN repositories completed Except for output of STF470 - Extension of Conformance tests for TTCN-3 tools (TS102 950-3). Reason: work still ongoing. Transfer will be done in July 2014 Migration of Mantis projects completed Mantis projects can be associated with SVN projects EOL account or local Mantis account can be used Developers must use EOL account Feature ‘to notify developers on new submitted CRs’ is still ongoing Stable version of SVN documentation available CTI comments to be integrated Chapter on Mantis usage to be added © ETSI 2013. All rights reserved

Status Update for MTS#62 cont’d To align SVN page design with the ETSI look&feel by Sep 2014 http://forge.etsi.org Use CSS from ttcn-3.org Make sure to be able to show the content part in an i-frame of ttcn-3.org http://forge.etsi.org/mantis/main_page.php Study if mantis can be shown via i-frame in ttcn-3.org © ETSI 2013. All rights reserved