SVAC Configuration Verification

Slides:



Advertisements
Similar presentations
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
TESTING UPDATES for 2016 Office of Assessment
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
SchoolSuccess for Coordinators
Front Row Ed 2017/18 District Benchmark & Usage
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Online – Data Storage and Processing
Core LIMS Training: Project Management
F. Bellini for the DQM core DQM meeting, 04th October 2012
HCAL Database Goals for 2009
Naviance Family Connections
Standard Operating Procedure
First Look at Housekeeping Data
GLAST Large Area Telescope:
Preparation for CERN test beam
Utilizing PeopleSoft Tools to Streamline Graduation Processes
Single-CAL Test and Calibration
SummingUp Live Ross Grange Product Manager (Training providers)
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Overview Goal Study GEM variables in SVAC ntuple
Systems Update
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
LAT Environmental Test Planning and Design Review
Eduardo do Couto e Silva Feb 28, 2006
Status Report and highlights from workshop II
Shaped Digital Readout Noise in CAL
New Client On-boarding Process
Using the AIM Alternative Testing Module (for Instructors)
Using AIM (for Instructors)
Offline framework for conditions data
New Faculty Orientation
DSC ChMC Switching Programme Update 10th July 2019
Presentation transcript:

SVAC Configuration Verification What did we check? Numbers in the csv matrix that we understood, were compared to values from snapshot files and rcReport.out Values of registers we considered the most relevant for offline data analysis were given highest priority (see next slide) Cosmic ray runs were first in the list Look at all Digi and recon Distributions in the SVAC reports Procedures? We produced SVAC configuration reports from reference files delivered by subsystems Used those from email from Hiro and Eric Had Martin come to our office to look at the trigger information Printed reports from actual runs and compared by hand Our system was designed to provide feedback for data analysis within a week time frame However it became part of the integration sequence and we had to use it to provide answers within a few hours Of course, it was not smooth

Registers we care (today) for the offline data analysis TEM Status  Zero Suppression ON/OFF, TEM diagnostics ON/OFF Detector Registers TKR GTRC splits TKR GTFE thresholds in DAC units for ranges 0 and 1 CAL GCFE thresholds in DAC units (LAC, FLE, FHE) CAL Readout range selector discriminator CAL DAC for DC reference CAL delays 1,2,3 Trigger and Timing Registers (GEM, GLT) Delay from CAL trigger discriminator to TEM trigger primitive formation Delay from TKR trigger discriminator to TEM trigger primitive formation Stretch width of CAL trigger primitive Hold trigger primitive for TEM diagnostic latching of CAL trigger primitive Hold trigger primitive for TEM diagnostic latching of TKR trigger primitive Width of trigger window in GEM Delays from trigger TACK to shaper hold for CAL and TKR  

Data Quality Plots Go to the Runs database Query on Test ID: 1/1 Completion Status: PASSED Duration: > 1000 Look at Config report and digi and recon reports Currently we are updating the reports based on the results from these runs Comments are welcome Please come to our Friday meetings if you want to participate

Issues The current verification scheme can be improved What to do to improve and who will check configurations for 2 tower tests? In case you still wants us to do it, we have a shopping list Note that SAS/pipeline then becomes then part of the integration sequence and this is a change in plans and the impact needs to be assessed To improve the process we recommend Review of matrix prior to tests, to ensure values are correct For example, trigger timing wasn’t (not a big deal but it should be right) Delivery of reference files from (CAL, TKR and TRIG) for both towers with description of contents 3 days in advance (CAL/TKR), 1 day in advance (trigger) Get a list of additional registers to be checked and their reference values CAL send us requests for config_0 and config_1 that we are trying to accommodate n the next release of our code (ASAP) Produce a general tool to parse the snapshot file Unoftunately neither online or SVAC could od that, better if ISOC does it The automation of the verification process could be done but SVAC priority is to analyze data ASAP so that we can provide feedback to the 2 tower tests Can’t promise that will happen for 2 tower tests, but could try for the LAT tests

What did we learn? Runs checked (took 2-3 hours to go through data quality reports) 1/1,2/3,2/6,2/7,3/1,3/2,7/1,4/1,8/6,4/2,4/3,5/3 Runs to be checked which are already available 5/6,5/7,8/8/,4/4/,B/1 there are still 15 runs to be taken What next? A presentation in IA Friday meetings Prepare a list of run numbers and test IDs Show a summary of plots Present a list of questions for which we do not have an answer yet these will lead to data analysis tasks for the LAT collaborators Hopefully we will be able to provide feedback to the 2 tower tests What is deadline for that?