How Well is Your Well? UIC Class I Well Construction Standards

Slides:



Advertisements
Similar presentations
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
Advertisements

How to Submit Oil Online Completions – (Form W-2)
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Presented by Kay Smothers and Greg France Injection and Mining Division.
CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday,
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
PETE 411 Well Drilling Lesson 29 Cementing.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Well Design PE 413.
The Injection Connection: A Regulatory Framework for Geologic Sequestration of Anthropogenic Carbon Dioxide  2010 Diane Perkins All Rights Reserved.
Completing & Producing A Well
The Underground Injection Control (UIC) Program
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Performance Through Engineering Extended Reach/Horizontal Drilling Solutions EXTENDED REACH / HORIZONTAL DRILLING.
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
BLM Legacy Wells Environmental Hazards & Eyesores.
Well Log Interpretation Basic Relationships
Electric wireline logging
Monte Markley, P.G. SCS Aquaterra. What to do when you need to dispose of high volume fluids? One way is to drill a disposal well.
1:1 scale wellbore experiment for a better understanding of well integrity in the context of CO 2 geological storage, Mont Terri underground rock laboratory.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Environmental Toolbox. Technical Module Introduction.
Introduction to Well Completions
The Case History of an Underground Flow Offshore Texas Developed by John Rogers Smith, P.E., Ph.D. Louisiana State University Funded by Minerals Management.
SPE DISTINGUISHED LECTURER SERIES
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
Disposal/Injection Well Pressure Test Report (H-5)
Oil & Gas Waste Stream Management and Permitting Options
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Chairman Christi Craddick
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
Cementing How it is Done
The UIC Compliance Investigator Is Here. Now What?
Well 38 Drilling & Testing Amendment
HYDROSTATIC DEVICE FOR
Well Design - PE 413 Surface Equipments and Placement Techniques
Class I Injection Well Application Issues
Section 1: Water Beneath the Surface
Dr. Jim Thomas Desert Research Institute
Casing Design Workshop
POROSITY DETERMINATION FROM LOGS Most slides in this section are modified primarily from NExT PERF Short Course Notes, However, many of the NExT.
Texas Disposal Well Rules And Seismicity Leslie Savage, P.G.
Class I Operational Constraints Requiring Specialized Wellbore Hydraulic Modeling Tom Ortiz TCEQ.
Coal Bed Methane Cementing Best Practices
UIC Class I Application Issues and Updates
Texas Disposal Wells And Seismicity Paul Dubois, P.E. May 2019.
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
API SC 10, Work Group 13 Update:
UIC Inspection and Compliance Team
Jan Bates, P.E. Underground Injection Control Permits Section
Aquifer Storage and Recovery Recoverability of Injected Water
Recent UIC Class I Well Construction Issues
Presentation transcript:

How Well is Your Well? UIC Class I Well Construction Standards Andy Trevino P.E. TCEQ Underground Injection Control

TCEQ UIC Requirements for : Drilling Cementing Testing Changes to Approved Drilling and Completion Plans Daily Communications Completion Reports

Drilling Requirements Step by Step Drilling plan Objective: - To use sound practices to minimize deviated holes, washouts, lost circulation and stuck pipe to minimize well cementing issues and maximize successful well completions.

Drilling Plan should: Address site specific drilling hazards Fracture zones Lost circulation zones High or Under Pressured zones Potential for drilling thru existing waste plumes.

Drilling Plan should include: Frequent deviation checks Fluid loss preventative measures Mud weights proposed for each stage of drilling Circulation pressures and pump rates that will keep the circulated mud in laminar flow and prevent formation fracturing Drilling mud should be reconditioned commensurate with proper cementing practices.

Cementing Requirements Cementing Plan - Cementing procedures - Type of cement - Volumes - Additives - Slurry weight - Cementing equipment

Cementing Requirements Cementing should be pump and plug method Cementing volume required: - 120% with 2 dimensional caliper or 150% without Cementing Objective: - Prevent movement of fluids into or between USDW or FW aquifers - Prevent movement of fluids out of the injection zone

Cementing Plans should Discuss suitability of cement based on injection fluid properties, BH temperature, pressures Discuss procedures to be taken to prevent cement channeling - For example, use of centralizers, scratchers, reciprocating the casing, maintaining pump rates, mud conditioning, preflushing and use of wiper plugs. Discuss procedures to be taken to prevent formation fracturing

Cementing Plans should Discuss any site specific cementing issues anticipated - Such as loss of circulation, over or under pressured zones or formation breakdowns Include contingency cementing plan to be implemented if 100% of the annular space is not filled

Testing and Logging Requirements 30TAC 331.62(a)(7) During drilling: - Frequent deviation checks Prior to setting surface casing: - Triple combo log run, SP, Resistivity, Gamma Ray - Caliper log, to determine hole volume After setting surface casing and cementing: - CBL with variable density log - Temperature log - Pressure test surface casing to 1,000 psig

During Drilling 30TAC 331.62(a)(7)(c) – Core sampling Full cores shall be taken from selected intervals from the lowermost overlying confining zone and selected sections of injection zone. If not able, sufficient sidewall cores shall be at selected intervals.

Core and Fluid analysis Core analysis should determine perm, porosity, Poisson’s ratio, formation compressibility, etc… Collect formation fluid to determine chemical, physical and radiological properties Compatibility tests of waste fluids with formation fluids, minerals of both injection & confining zone Determine if gases will be generated

After Drilling is completed Prior to setting longstring: - Run SP, Resistivity, Gamma ray, compensated density and/or neutron porosity, Dipmeter/Fracture finder and caliper logs After cementing longstring: - CBL w/ variable density log, casing inspection log, temperature log and inclination survey

Prior to operating the well After Well Completion Mechanical integrity testing of well Annular pressure test, radioactive tracer survey, temperature or noise log Prior to operating the well Conduct injectivity/falloff test to determine well capacity and verify reservoir characteristics

Injectivity and Falloff tests Test results should be used to determine bottom hole pressure, bottom hole temperature, static fluid level, fracture pressure, permeability, faulting boundary (if any), dual porosity, skin factor and any completion anomalies

Changes to Approved Drilling & Completion Plans 30TAC 331.62(a)(3) – provides for the requirement for changing plans and specifications for well construction and well workover Any changes from approved plans and specifications from permit application must be requested as a minor modification or amendment Changes during drilling may be granted by oral approval

Daily Communication during Well Construction 30TAC 331.62(a)(10) – Executive Director shall have opportunity to witness all cementing of casing strings, logging and testing. Need to provide a 30 day schedule and a 24hr notice It is recommended that daily reports are provided by e-mail during well construction, logging and testing Rule requires 24hr updated notice to allow personnel to make travel plans

Completion Reports 30TAC 331.45 – Requires report submittal within 90 days As built drawings All logging and test data Injectivity and falloff test results Waste compatibility results with reservoir fluids and minerals Recalculation of AOR and cone of influence if needed A copy of the checklist we use to review completion reports will be provided

TCEQ’s “Construction Guidance for Class I Injection Wells” Link to guidance documents are available at: https://www.tceq.texas.gov/assets/public/permitting/ waste/uic/Well%20Construction%20Guidance.docx Or search for “Construction Guidance for Class I Injection Wells” on our website at: www.tceq.texas.gov

Thanks for your Attention Andy Trevino P.E. Engineer Texas Commission on Environmental Quality Office of Waste Radioactive Materials Division Underground Injection Control Permits Section 512-239-6172 andy.trevino@tceq.texas.gov