2011 National Sales Meeting Technical Services Organization This information is confidential and is not to be provided to any third party without Vicon.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Symantec 2010 Windows 7 Migration Global Results.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
BetterInvestings Portfolio Manager Improving Mutual Fund Decisions Created by: QUANT IX SOFTWARE, Inc. Revised: November, 2005.
EuroCondens SGB E.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Performance Management Chapter 10. Performance Management 10-2 Objectives How to View Goals View State Goals View Your LWA Goals Search Goals (including.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Create an Application Title 1Y - Youth Chapter 5.
Create an Application Title 1D - Dislocated Worker Chapter 9.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Supported by ESRC Large Grant. What difference does a decade make? Satisfaction with the NHS in Northern Ireland in 1996 and 2006.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
1 Proprietary and confidential. Not to be copied or redistributed without written consent from Medica®. Minnesota Health Action Group February 21, 2013.
Year 6/7 mental test 5 second questions
Welcome. © 2008 ADP, Inc. 2 Overview A Look at the Web Site Question and Answer Session Agenda.
The basics for simulations
11,80 0,0011,80 0,00 8,38 EPCOS AG A Member of TDK-EPC Corporation CC Munich, Germany December 2013 New EPCOS Website 5-Minute Guided Tour.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
2013 Annual Report on Oil and Gas Activities State Oil and Gas Council Meeting April 16, 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 Presenter: Josh Stuckey, Manager Harris County Permits Northwest Freeway Suite 120 Houston, Texas
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
By Will Henson, Keighly Laney,and Tori Gaston March 9, th Period.
Adding Up In Chunks.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Types of selection structures
Media Channel Study Media Channel Study - 1 Contents Main Objectives2 Survey Method3 Media Channels Studied4 Executive Summary5 Detailed Findings6.
Essential Cell Biology
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
20-1 Retail Mgt. 11e (c) 2010 Pearson Education, Inc. publishing as Prentice Hall Integrating and Controlling the Retail Strategy RETAIL MANAGEMENT: A.
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Copyright Tim Morris/St Stephen's School
Columbus Tustin Middle School 3-Year Achievement Results Analysis September 2013.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Title Goes Here This information is confidential and is not to be provided to any third party without Vicon Industries Inc. prior written consent. 1
Title Goes Here This information is confidential and is not to be provided to any third party without Vicon Industries Inc. prior written consent. 1
Vicon Factory Professional Services A Game Changer This information is confidential and is not to be provided to any third party without Vicon Industries.
Platinum Dealer Program Taking you to the next level of success! vicon-security.com.
A&E Update 2011 Dick Koharik This information is confidential and is not to be provided to any third party without Vicon Industries Inc. prior written.
Vicon Channel Partner Program ISC West Sales Meeting.
Title Goes Here This information is confidential and is not to be provided to any third party without Vicon Industries Inc. prior.
Presentation transcript:

2011 National Sales Meeting Technical Services Organization This information is confidential and is not to be provided to any third party without Vicon Industries Inc. prior written consent.

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Organization 2

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Mission Statement The mission of Vicons Technical Services Team is to provide world class Technical Support to our customers and exceed their expectations. Our customers can expect prompt and professional support with the goal of making them knowledgeable and successful with our product line. 3

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Key Changes in 2011 March Vicon Support Product Lifecycle policy implemented. May 2011 – Professional Services program launched. August 2011 – Customers now required to enter an authorization number to gain access to technical support – Staff changes that included the addition of 3 new team members with PC/Networking backgrounds and industry experience. 4

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Call Process (ACD) 5

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Improvements Average Platinum – call wait times Prior to policy changesAfter policy changes 0-10 minutes = 58%0-10 minutes = 80% 11+ minutes = 42%11+ minutes = 20% Callbacks = (40%)Callbacks = (40%) (Callback % is calculated as part of the overall categories) 6

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Improvements Average Authorized Dealer (AVD) call wait times Prior to policy changes After policy changes (included any non-Platinum caller) (only includes AVDs) 0-10 minutes = 17%0-10 minutes = 61% 11+ minutes = 83%11+ minutes = 39% Callbacks = (78%)Callbacks = (38%) (Callback % is calculated as part of the overall categories) 7

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Improvements Average Authorized End User (AEU) call wait times After policy changes (only includes AEUs) 0-10 minutes = 83% 11+ minutes = 17% Callbacks = (43%) (Callback % is calculated as part of the overall categories) 8

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services Calls by Customer and Category Platinum = 43% A.V.D. = 45% A.E.U. = 12% ViconNet products = 86% SMS Integration = 2% All Other products = 12% 9

This information is confidential and is not to be provided to any third party without Vicon Industries Inc.s prior written consent. Technical Services – Goals for 2012 Implement on line technical knowledge base. Redesign the internal technical lab to allow easier emulation of customer issues. Update the Vicon Corporate showroom. Continue to improve the customer experience. Continue to develop the team to meet the requirements of a changing industry. 10