AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

Performance of AMS-02 on the International Space Station DESY Theory Workshop, Hamburg Melanie Heil Supported by the Carl-Zeiss Foundation.
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
POCC activities AMS02 meeting at KSC October 11 th 2010.
1 AMS-02 POCC & SOC MSFC, 9-Apr-2009 Mike Capell Avionics & Operations Lead Senior Research Scientist ISS: 108x80m 420T 86KW 400km AMS: 5x4x3m 7T 2.3+KW.
AMS-02 JMDC On-Board Application Software Review Xudong CAI / M.I.T. Mar. 1, KSC.
Mike Capell / Jan ‘04AMS-02 Electronics1 AMS-02 Avionics FSR-II (21 May 2007) Mike Capell Avionics Lead Senior Research Scientist ISS: 108x80m 420T 86KW.
Terry Smith June 28, 2001 Command and Data Handling System SuperNova / Acceleration Probe (SNAP)
Page No. 1 Overview Kelvin Nichols Payload Operations and Integration Center EO50 SSCN Delay Tolerant Networking (DTN)
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
Evolution of the gas system control for flight
Evolution of Monitoring System for AMS Science Operation Center
20 Oct 2014: HV Trip? K. Andeen 21 Oct 2014.
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
16:00 on Tue 3 Apr 2018 (GMT 093) To 16:00 on Wed 4 Apr 2018 (GMT 094)
AMS Summary 16:00 on Thu 29 Mar 2018 (GMT 088) To
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Wed 24 Oct 2018 (GMT 297) To
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Wed 31 Oct 2018 (GMT 304) To
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Mon 19 Nov 2018 (GMT 323) To
AMS Summary 16:00 on Thu 15 Nov 2018 (GMT 319) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
AMS Summary 16:00 on Wed 21 Nov 2018 (GMT 325) To
AMS Summary 16:00 on Wed 14 Nov 2018 (GMT 318) To
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To
Launch and On-orbit Checkout
16:00 on Thu 8 Nov 2018 (GMT 312) To 16:00 on Fri 9 Nov 2018 (GMT 313)
AMS Summary 16:00 on Fri 9 Nov 2018 (GMT 313) To
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Fri 23 Nov 2018 (GMT 327) To
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
16:00 on Wed 5 Dec 2018 (GMT 339) To 16:00 on Thu 6 Dec 2018 (GMT 340)
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
AMS Summary 16:00 on Fri 30 Nov 2018 (GMT 334) To
AMS Summary 16:00 on Wed 23 Jan 2019 (GMT 023) To
AMS Summary 16:00 on Mon 28 Jan 2019 (GMT 028) To
AMS Summary 16:00 on Wed 9 Jan 2019 (GMT 009) To
AMS Summary 16:00 on Fri 11 Jan 2019 (GMT 011) To
AMS Summary 16:00 on Mon 14 Jan 2019 (GMT 014) To
AMS Summary 16:00 on Thu 24 Jan 2019 (GMT 024) To
AMS Summary 16:00 on Wed 13 Feb 2019 (GMT 044) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 14 Feb 2019 (GMT 045) To
AMS Summary 16:00 on Thu 10 Jan 2019 (GMT 010) To
AMS Summary 16:00 on Tue 26 Feb 2019 (GMT 057) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To
AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
AMS Summary 16:00 on Tue 30 Apr 2019 (GMT 120) To
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
Bad Runs Alberto Oliva, July 2012.
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
16:00 on Tue 2 Jul 2019 (GMT 183) To 16:00 on Mon 8 Jul 2019 (GMT 189)
AMS Summary 16:00 on Wed 10 Jul 2019 (GMT 191) To
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
AMS Summary 16:00 on Thu 04 Oct 2018 (GMT 277) To
Presentation transcript:

AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To 16:00 on Wed 15 May 2019 (GMT 135)

AMS High Rate Data Downlink Rate (Mbps) : 17 -> 37 (2h) -> 17 Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Main Data Computers (JMDC) Number of Digital Signal Processor (DSP) bit-flips (Auto-fixed): 2 Data Acquisition (DAQ) Readout Data Reduction Detectors DAQ Comp (JINJ) TRD TOF+ACC Tracker RICH ECAL TRD (UDR) TOF+ACC (SDR) Tracker (TDR) RICH (RDR) ECAL (EDR) Trigger (JLV1) TRD (JINF-U) Tracker (JINF-T) RICH (JINF-R) ECAL (JINF-E) Main Data Computers (JMDC) Radiation Heavy nuclei More than 300 active Digital Signal Processor (DSP) for processing subdetectors signal, calculation and system control. DSP bit-flips are checked 4 times per orbit and can be fixed automatically. - Integrated Circuit (Si) + I increasing Bit-flips - a logic state is changed 3 3 3

AMS FLIGHT and GROUND SYSTEMS FLIGHT GROUND Due to maintenance on OPTIMIS (Operation Planning Timeline Integration System), ~2 hours delay to update the Playback ON/OFF items for JMDC. AMS FLIGHT and GROUND SYSTEMS AMS on ISS Trigger (JLV1) AMS Laptop Detectors Data Reduction Readout [2]x[4] TRD TOF+ACC Tracker RICH ECAL TRD (UDR) TRD (JINF-U) Tracker (JINF-T) RICH (JINF-R) ECAL (JINF-E) HRDL LRDL ISS Avionics 100 MBit/s E’net 7x[2] 8x[2]x[2] 2x[2]x[2] DAQ Comp (JINJ) AMSWire 100 MBit/s Main Data Computers (JMDC) TOF+ACC (SDR) 4x[2]x[4] Tracker (TDR) 4x[4] 24x[2] FLIGHT RICH (RDR) 12x[2] ECAL (EDR) 7x[2] 2x[4] TDRS AMS CAN Bus Main Comp. Power (USCM-J) Monitoring (Align., GPS, Star Track, Temps.) (USCM-M) TRD Gas, Temp. (UGSC-UG) Power Distribution (PDS) Tracker Thermal (TTCE) Ku-Forward(2015) Thermal Systems Ku-band S-band Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL Infrastructure White Sands POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant Infrastructure NASA Liaison Data Production ERIS/CDP/KuFwd MCC, JSC HOSCfepRIC POIC, MSFC Internet HOSCfep ERIS/CDP GSC IVoDS NISN GROUND AMS Flight Simulator Lab. AMS Flight Simulator ISS Avionics Simulator AMS Laptop SDIL, JSC “ISS” Avionics AMS Laptop FEU Internet Backup POCC (in 892)

Flight Ground ISS AMS on ISS ISS Avionics Unstable Ku, ~50 Sequence errors in Science Buffered Playback (SCIBPB) data. Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Ku-band High Rate (down): Baseline: <17Mbit/s> Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

Tracker Thermal Control System (TTCS) TTCS pump-SB has no spikes (speed over limit). Working fluid:CO2 Single phase Two-phase condensers Pump-SB Magnet HX Accumulator space Tracker Thermal Control System (TTCS) Tracker TTCB one of two in parallel Radiators Evaporator +10ºC 120W 120W in out Evaporator Fill port 6

Flight Ground AMS Laptop daily logfile downlink OK ISS AMS on ISS ISS (The logfile contains the operation status of the Laptop and is checked by DATA expert everyday to make sure the Laptop is working properly) Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

TRD: HV Intercalibration (Every day TRD experts will adjust high voltage according the gas loss in the detector to stabilize the gas gain.) U0: -2V (1437V -> 1435V) U1: -2V (1446V -> 1444V)

Upcoming Events

May 16 05:40 Maneuver to Yaw Bias May 17 07:30 Maneuver to TEA May 21 07:30 Maneuver to Yaw Bias May 23 13:45 Maneuver to TEA May 23 20:50 Maneuver to Yaw Bias May 24 08:20 Maneuver to TEA July 12 (3 days): ISS Yaw bias from -4 to -12 for power generation (+58<Beta>+68.5). July 19 (4 days): ISS Yaw bias from -4 to -12 for power generation (+68.5>Beta>+58).

AMS FLIGHT and GROUND SYSTEMS FLIGHT GROUND May 18 00:00(45mins): No Commanding. Swing over to Backup Control Center at JSC. Playback OFF. May 18 22:00(45mins): No Commanding. Swing back to Mission Control Center at JSC. Playback OFF. AMS FLIGHT and GROUND SYSTEMS AMS on ISS Trigger (JLV1) AMS Laptop Detectors Data Reduction Readout [2]x[4] TRD TOF+ACC Tracker RICH ECAL TRD (UDR) TRD (JINF-U) Tracker (JINF-T) RICH (JINF-R) ECAL (JINF-E) HRDL LRDL ISS Avionics 100 MBit/s E’net 7x[2] 8x[2]x[2] 2x[2]x[2] DAQ Comp (JINJ) AMSWire 100 MBit/s Main Data Computers (JMDC) TOF+ACC (SDR) 4x[2]x[4] Tracker (TDR) 4x[4] 24x[2] FLIGHT RICH (RDR) 12x[2] ECAL (EDR) 7x[2] 2x[4] TDRS AMS CAN Bus Main Comp. Power (USCM-J) Monitoring (Align., GPS, Star Track, Temps.) (USCM-M) TRD Gas, Temp. (UGSC-UG) Power Distribution (PDS) Tracker Thermal (TTCE) Ku-Forward(2015) Thermal Systems Ku-band S-band Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL Infrastructure White Sands POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant Infrastructure NASA Liaison Data Production ERIS/CDP/KuFwd MCC, JSC HOSCfepRIC POIC, MSFC Internet HOSCfep ERIS/CDP GSC IVoDS NISN GROUND AMS Flight Simulator Lab. AMS Flight Simulator ISS Avionics Simulator AMS Laptop SDIL, JSC “ISS” Avionics AMS Laptop FEU Internet Backup POCC (in 892)

Flight Ground ISS AMS on ISS May 21 <tbd>: JMDC monthly reload Tracking and Data Relay Satellite (TDRS) ISS AMS Laptop AMS on ISS Flight Main Data Computers (JMDC) ISS Avionics Asia POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL POCC TEE: Track/TRD/ACC PM: TOF/RICH/ECAL LEAD Thermal DATA Consultant NASA Liaison Data Production Ground White Sands Ground Terminal AMS Computers at Marshall Space Flight Center (MSFC)

May 23 17:52 : 71P Reboost #8. Delta 4.5km. Burn 21m29s0 May 31 14:00 : SpX-17 unberth Jun 4 10:40 : 71P undock

Tracker Thermal Control System (TTCS) Projected pump ON/OFF times (Z. Zhang, 16 Apr 2019): May 03 - Jun 05 : Pump ON Jun 05 - Jun 30 : Pump OFF (Tracker Configuration E) Jul 01 - Aug 03 : Pump ON Aug 03 - Sep 01 : Pump OFF (Tracker Configuration E) Sep 02 - Sep 30 : Pump ON Tracker Thermal Control System (TTCS) Working fluid:CO2 Single phase Two-phase condensers Pump-SB Magnet HX Accumulator space in out Evaporator Tracker TTCB one of two in parallel Radiators 120W +10ºC Fill port