Scientific Policy Committee

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.
Overview of the participation of the CIS and SEE countries in the LHC Experiments NEC, VARNA 12 – 16 September 2005 Nicolas Koulberg, CERN.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
Market Entry Strategy and Designing the Marketing Programme at target markets: A Case of Selected Company and Selected Markets (special focus V4 countries)
A new start for the Lisbon Strategy Knowledge and innovation for growth.
European Commission eContent Towards the Workprogramme.
DIVISION OF REVENUE BILL VOTE 16: HIGHER EDUCATION AND TRAINING Presentation to Standing Committee on Appropriations 26 February 2010.
Program started on August 1st, 2005 ALFA PROGRAMME CONFERENCE 'BEST PRACTICES & RESULTS OF ALFA PROJECTS THE FUTURE OF EU-LA COOPERATION IN HIGHER EDUCATION.
Biofuels – EU policy context Funding and Legislation Workshops Glasgow, 26 May 2011 Francesca Giannini Scotland Europa.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Medium Term Plan, with a Long Term Projection to 2010 L. Maiani. CERN Finance Committee June 19, 2002.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
Activities and Resources Baseline Plan during construction and financing of the LHC ( ) Luciano MAIANI Council, December 13, 2002.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Opening CERN to non-European States (aka as ‘geographical enlargement’) Rüdiger Voss CERN International Relations Office FPRIB, SINP Kolkata| April 16-18,
Budget Outlook Glen Crawford P5 Meeting Sep
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
One Nottingham Lunchtime Learning Public Spending Cuts.
Key figures ,86 M€ Details ● 40 PhDs (8,64 M€) ● 13 Postdocs (2,73 M€) ● 1,77 M€ travel ● 0,99 M€ ‘per diem’ ● 2,74 M€ fees ATLAS:LHCb:ALICE=5:3:2.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
CLIC work program and milestones
Jefferson Lab Overview
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
The European Strategy for Particle Physics
Input to Strategy currently planned
LifeWatch, costing and funding
Intercompany Project Time and Expenses Scenario Overview
4th FRC meeting, Antti Onnela, CERN-PH-DT
John Womersley Super-B Workshop Oxford May 2011
Ways to industry participation in CLIC 24th October, 2017
Third Workshop on GEMs for CMS
MICE Project in the US: Completion of Efforts
Veksler and Baldin Laboratory
Renovation of the 45-year old PS magnets
HEP with Accelerators Outline Physics in progress Organization
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Alessandra Luchetti Deputy Head of Unit
nuSTORM and the Physics Beyond Colliders workshop
Police Services Analysis – Phase 2 Draft Report
Superbeams with SPL at CERN
CMS Goal of the experiment
Collaboration Board Meeting
CNGS Project Overview Konrad Elsener.
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Scientific Policy Committee Strategy Based on a redefinition of: (i) LHC schedule and (ii) the scientific programme for the Laboratory 2002-2009 with: Streamlining the Laboratory on the LHC; Clear financial targets across all CERN activities to meet the cost to completion; Clear lines for changes in human resources policy, covering staff and outsourcing; Changes in structures and improved control and communication L. Maiani. March 19, 2002 Scientific Policy Committee

Papers submitted to March Committees CERN/CC/2430: Status and Schedule of the LHC Machine, Experiments and Computing CERN/SPC/806;/FC/4537: The scientific activities for CERN and budget estimates for the years 2003-2010. Preliminary orientations CERN/FC/4538: Management and control structures  CERN/FC/4539: Proposal for the unblocking of the withheld part of the 2002 Materials Budget L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 1.1. LHC Schedule Contracts for dipole cold mass assembly are being signed; CERN has a double role of supplier of sc cables and end customer of the dipoles: we must be prudent in defining the dipole delivery schedule, hence the LHC schedule. SC cable production to end mid 2005; last dipole delivered July 1st, 2006; Machine closed and cold: Oct. 2006; First beam: April 2007; First physics: mid 2007; The detailed revised schedule in the MTP to be presented in June. L. Maiani. March 19, 2002 Scientific Policy Committee

1.2. The LHC experimental programme We do not propose to delay further or suppress either ALICE or LHCb. Heavy ion collisions were a fundamental factor in LHC approval in 1996. LHCb extends studies of CP violation in the B system. Precision far beyond current B factories, entirely new decay channels to be explored. Experiments promoted by more than 1500 scientists, approved and funded in their own countries. Cancellation would cause havoc and embarrassment in MS and to our partners in non-MS. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 2. Scientific activity, 2003-2006 A programme reduced to the bare bones, aiming at an almost complete focusing of CERN human and financial resources on the LHC; Integrates results by Task Force 1 Non-LHC activities: only those are retained where significant investments have to be protected, or which are vital to CERN future. Very painful choices have been made. Still a long time-gap to LHC, with extremely reduced physics: will CERN be sufficiently attractive to get the good people needed later for the LHC exploitation?; Council to decide activity above this minimum level. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 2.1. SPS programme SPS running is the most expensive Minimal programme must respect main interests of fixed target users (investment done, PhDs…) & LHC detector calibration Proposals: Confirm the approved 2003 programme; COMPASS phase 1 up to 2004; phase 2 (if approved) from 2006 onwards; Full year stop in 2005; 30% beam time reduction in other years (but CMS may require more time in 2004) up to 2006. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 2.2. Neutrinos Management has come to the decision that CERN must withdraw from its participation in OPERA (direct observation of t neutrinos), in spite of its scientific interest The withdrawal releases about 12MCHF of funding over the period 2002-2010 and 6 FTE/y. This measure implies that CERN will not participate in a neutrino physics experiments in the foreseeable future. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 2.3. PS programme Running PS much less expensive than SPS A valuable low energy programme, a large community: no reason to disrupt However, 30% cuts on running time in 2003 to 2006. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 2.4. Accelerator R&D General reduction to 1998 level: 4M/y, about 30 FTE; CTF3 maintained: we need to know if it is a viable technology for MultiTeV physics CERN can make a decisive impact Good level of collaboration with European Labs SPL 120 MeV front end: a minimum investment; No provision for further R&D on neutrino factory (muon cooling, etc.) Support to a possible (EU based ?) network with CERN know-how. A MINIMAL programme for an accelerator laboratory of the importance of CERN. Its narrowness and limitations can only be justified by the present severe budgetary problems. Task Force 1 L. Maiani. March 19, 2002 Scientific Policy Committee

Overall view of proposed scientific plan L. Maiani. March 19, 2002 Scientific Policy Committee

3. CERN Neutrino beam to Gran Sasso CNGS Beam as approved in 1999: 71 MCHF (2.5 M contingency) marginal cost 22 MCHF recuperated equipment (WAN, LHC) 59 m *y MS contributions 62 M, cost to CERN 9 M, for a total value 93 M. 1) Via DESY, produced at BINP: Dipoles for Transfer line, Vacuum line. 2) IN2P3, Horns 3) Compagnia di San Paolo. Payments and Commitments:

CERN Neutrino beam to Gran Sasso (cont’d) Revised figures submitted by project in 2002: 79 MCHF (2.5 M contingency) marginal cost 84m*y Independent Review Panel: estimates 84 MCHF, but sees scope for 3 MCHF savings; Management has asked the CNGS project team to present a revised project version, with the project cost to CERN as originally foreseen. Start up in 2006 (NuMI: second quarter of 2005); CNGS will be a most important scientific facility for European physics. L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee 4. Fellows & Associates We propose to reduce budget by 15-20%; Reduction mainly on non-LHC activities; Compensation from other sources possible in certain areas (e. g. EU fellowships, trainee programmes). L. Maiani. March 19, 2002 Scientific Policy Committee

5. Restructuring the Accelerator Sector Adapt to the post-LEP, LHC mode of operation; Facilitate deployment of people on the LHC, for which manpower has been always a critical area; Two main areas of activity: accelerator operation, advanced technologies for accelerators and detectors; Task Force 5 has addressed this problem and made proposals; Idea has gained momentum. Proposal to regroup activities in two Divisions will be presented in June. L. Maiani. March 19, 2002 Scientific Policy Committee

6. Saving and Financial Plan ambitious target on Industrial Services; uncertainty margin (20% ?) Supported by Task Force3, More work, tight controls Reallocation of some 41 M/year over the period, in 2002 money Indexation of Personnel budget in 2002 at 1.3% 24 L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee Scenario 1 – Summarized Anticipated Budgetary Position (MCHF, current prices) L. Maiani. March 19, 2002 Scientific Policy Committee

Scientific Policy Committee Scenario 2- Summarized Anticipated Budgetary Position (MCHF, current prices) L. Maiani. March 19, 2002 Scientific Policy Committee