Task List Group management plan Background studies

Slides:



Advertisements
Similar presentations
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Advertisements

Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Senior Design 4006C Group G7 Final Report 1394b – Receiver The new generation of FireWire. Luke Starnes (gte874d) Aparna Trimurty (gt9794a) Jeff Schlipf.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Laser Drive Needs Total laser current –I TOT = I BIAS + I MOD BIAS Current –Keeps I TOT > I TH (laser “on”) –I BIAS – I TH related to speed Modulation.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 1 Vinh Nguyen January 9, 2005.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
ECE4006 Group 6 – Presentation 1 Division of Labor – Vikas Parekh – Group management, project schedule manager, background studies. Gautum Khanna – Analog.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Status Presentation Group 7: 1394b Receiver Aparna Trimurty Stancil Starnes Jeff Shlipf March 28th, 2002.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
Next generation rad-hard links
Status Report 7 CAPS Cynthia Reyna David Rodriguez Cynthia Salas
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
(b) (ii) Project Plan.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
ECE 4006 CAPSTONE DESIGN R.Y.M.M.Y Georgia Institute of Technology
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
GROUP 1 FINAL PRESENTATION
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
Presentation transcript:

Task List Group management plan Background studies Link budget: optical/electrical Build, test learning Rx board Order components for transceiver (TxRx) module Design, circuit schematic, layout of full duplex TxRx module (Run 1) Build, test transceiver module, Run 1 Alignment tolerance of Rx on TxRx module, Run 1 Analysis of results, Run 1 Design, circuit schematic, layout of full duplex TxRx module (Run 2, optional) Build, test transceiver module (Run 2, optional) Alignment tolerance of Rx on TxRx module (Run 2, optional) Analysis of results (Run 2, optional)

Group Management Plan GANTT Charts, presented weekly Management structure, defined by group Resource Allocation, defined by group Time Personnel, expertise Budget ($350 per group) Plan initially for 2 board fabrication runs

GANTT Charts Tasks and milestones as a function of time X axis, dates Y axis, tasks Use bars (color 1) to identify planned task execution Use bars (color 2) to identify revised planned task execution Use bars (color 3) to identify on-time progress Use bars (color 4) to identify late progress Use clear milestone markers for each task Use clear completion marker at the end of each bar for each task when the task is completed

Background I Study 4006 C Fall 2002 Group information (see class website) Note: these reports cannot be used as references, only as guides, as all informatio is unreviewed, and thus, suspect Develop a specification table for your TxRx modules Parameter list Values for parameters Must be compliant with IEEE 802.3z standard Guides: commercial data sheets, e.g. Infineon, Agilent. Good keywords: GBIC, Opto, 850 nm

Background II Develop a component specification table VCSELS, PDs (specify parameters and implications) Passives Connectors (including power supply) Note: be sure to include physical layout in the specs Study MAXIM ICs and evaluation kits (www.maxim-ic.com) Laser driver: MAX 3287 Transimpedance amplifier (TIA): MAX 3266 Limiting amplifier (LA): MAX 3264 Evaluation kits for each MAXIM part listed above