Step-by-step assembly instructions

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Step-by-step assembly instructions
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Facts about the Tetrahedral Kite 1.Four pyramid shapes are joined together to make the Tetrahedron Kite. 2.Each pyramid shape is built according to the.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Pneumatic Clamp Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Step-by-step assembly instructions
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Build A Motor You must follow the directions step-by-step!
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Fluid Power Challenge: Workshop Day
Fluid Power Challenge Introduction & Hints
25th Annual 7th and 8th Grade Battery Car Challenge
Investigating Fluid Power Rig
Hand-cranked Windmill Assembly Instructions
Workshop Rotating Platform
Workshop Rotating Platform
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
STEP 1: ASSEMBLE ANGLE PLATES
Step-by-step assembly instructions
Hot-Air Balloons.
Origami & Kirigami “3-D Tactile Geometry”.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Workshop Rotating Platform
Crumble PowerPoint 4.
Assembly instructions for M-K all bolt together hoppercone kit.
Step-by-step assembly instructions
Step-by-step assembly instructions
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Step-by-Step Assembly Instructions – Cube Version
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Step-by-step assembly instructions
Building an Experiment Cart
Presentation transcript:

Step-by-step assembly instructions Lifter Step-by-step assembly instructions V.3 – 2017 09 05

Contents of the Lifter Kit Wooden pieces (1 cm cross-section): 8 X 9.1 cm; 6 X 8 cm; 4 X 20.25 cm; 2 X 8.25 cm; 2 X 3.8 cm; 3 X 2.5 cm Green corner gussets: 2 cards Syringes, 20cc: 2 (1 has a hole in the plunger) Plastic Tubing: 1 length Wooden dowel, 3/16” diam.: 2 X 12.75 cm; 1 X 7.75 cm Axle Holders: 16 Syringe Holder: 1 Mini-washers: 8 Stirring Sticks: 2 Plus a small piece of sandpaper V.3 – 2017 09 05

Make a 10 cm cube using 8 X 9.1 cm pieces and 4 X 8 cm pieces V.3 – 2017 09 05

Just in case you need help making the cube V.3 – 2017 09 05

Glue two 20. 25 cm pieces to one side of the cube Glue two 20.25 cm pieces to one side of the cube. Reinforce by gluing two strips 10 cm Long and 1 cm wide on the side. Cut these from the green card. V.3 – 2017 09 05

Glue two 8 cm pieces between the long uprights and reinforce with four green triangular gussets V.3 – 2017 09 05

Mark the center of an axle holder and mark 6 Mark the center of an axle holder and mark 6.3 cm from the corner furthest from the uprights. Glue an axle holder onto the outside of the cube as shown. Check it is horizontal and parallel to the last 8 cm piece you glued. V.3 – 2017 09 05

Glue two more axle holders on the inside edges to reinforce Glue two more axle holders on the inside edges to reinforce. Make sure the holes line up V.3 – 2017 09 05

Glue an axle holder onto the outside of the upright pieces so that the centre of the hole is 3.8 cm from the top of the upright and the holder points towards the cube. Once you confirm that the axle is perpendicular to the uprights glue two more axle holders on the inside as shown. V.3 – 2017 09 05

Glue together three 2.5 cm wooden pieces using glue between the pieces. Cover the three pieces with a piece of green card and then glue two axle holders to opposite sides and trim the ends of the triangles as shown below and on the next slide. This is the platform that will hold the acting syringe. V.3 – 2017 09 05

Once everything is dry test in the structure using a long axle and ensure smooth rotation.

Make the arm by connecting two 20. 25 cm pieces and the two 2 Make the arm by connecting two 20.25 cm pieces and the two 2.8 cm pieces. Use 8 corner gussets – four on each side. V.3 – 2017 09 05

On this arm frame glue an axle holder in place as shown below On this arm frame glue an axle holder in place as shown below. Use a long axle to align and glue another axle holder on the outside of the opposite side. Test that the axle sits across the frame parallel to the shortest end. V.3 – 2017 09 05

Glue another axle holder in place so that its smallest angle touches the smallest angle of the axle holder already glued to the frame. In the same way align and glue in place another axle holder on the outside, align it and glue in place two more axle holders on the inside of the frame. The four axle holders must allow for a smooth rotation by the shorter axle. V.3 – 2017 09 05

There are a number of steps in assembling the mechanism There are a number of steps in assembling the mechanism. The first is to identify the syringe that has a hole drilled in its plunger. The shorter axle fits through this hole and should turn in it. The axle and plunger fit between the double axle holders on the arm and the outside, protruding axle is secured using a mini-washer on each end. V.3 – 2017 09 05

Remove the backing from the syringe clip to reveal a sticky pad Remove the backing from the syringe clip to reveal a sticky pad. Carefully place the pad onto the green surface of the platform and apply some pressure until the clip is secure. Place the barrel of the syringe into the clip so that the clip aligns with the ’15’ mark or thereabouts as shown. V.3 – 2017 09 05

Mount the syringe platform onto the structure so the lip points toward the uprights and the barrel is above the axle. Secure with four mini-washers, two securing the syringe platform and two securing the axle ends on the outside of the structure V.3 – 2017 09 05

Carefully insert the plunger into the barrel of the syringe until the holes at the end align with the holes in the axle holders glued to the uprights. Once aligned, carefully insert the axle through all six holes. The axle is secured with a mini-washer at each end. V.3 – 2017 09 05

To operate the mechanism attach the length of plastic tubing to the end of the acting syringe that is now housed in the structure. The other syringe should be fully extended before it is connected to the other end of the tubing. Gently push the plunger down. This syringe drives the acting syringe. V.3 – 2017 09 05

LIFTER - open V.3 – 2017 09 05

LIFTER - closed V.3 – 2017 09 05