FDG-PET/CT Technical Committee

Slides:



Advertisements
Similar presentations
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
Advertisements

This product was developed by Florida’s Positive Behavior Support Project through University of South Florida, Louis de la Parte Florida Mental Health.
FDG PET/CT. FDG-PET/CT Technical Committee Breakout Regular meetings of working groups with RSNA administrative support and milestones for delivery.
Chapter 2.
1 User Interface Design CIS 375 Bruce R. Maxim UM-Dearborn.
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Release Management and Rollout A very brief overview.
© The Critical Thinking Consortium CIDA: The world through pictures – Pollution Development challenges # 1.
AMERICAN COLLEGE OF RADIOLOGY March 23, OUR MISSION To foster the ongoing development of widely acceptable consistent imaging.
Leaders Manage Daily Operations
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
FDG-PET/CT Technical Committee
FDG-PETCT Technical Committee Subcommittees Progress to Date (summary version) Software Version Tracking – Ling Shao Team: Ling Shao, Mike Casey, Steve.
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
May 19-20, Quantitation, both single point and longitudinal*, of tumor metabolism via FDG-PET/CT that can be used practically and efficiently as.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Scanner Validation via the SNM Clinical Trials Network Phantom Program Paul E. Christian Molecular Imaging Program Huntsman Cancer Institute University.
FDG-PET/CT Technical Committee Purpose: to foster adoption of practical [I deleted cost-effective because I do not see us doing any cost-effective analyses.
Digital Reference Object Subcommittee Goals 1.Build a common reference DICOM test object (digital reference object or DRO) that can be generated by each.
RESTful Roadmap Brief Profile Proposal for 2014/15 presented to the IT Infrastructure Planning Committee R Horn (Agfa Healthcare)
Quality Function Deployment (QFD) Getting from the voice of the customer to technical design specifications.
ESPA Comprehensive Management Plan Framework Development Natural Resource Interim Legislative Committee July 12, 2006 Jerry Rigby Chairman Idaho Water.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Image from
1 Standards and Construction Specifications Manual Orange County Utilities February 13, 2007.
+ CIW Lesson 10 Part A. + IT Project and Program Management Successfully managed IT projects increase productivity and increase profits IT projects differ.
Chapter 1 Computer Technology: Your Need to Know
Location Intelligence at Stanford
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Radiopharmaceutical Production
Chapter 7.
What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human effort. Design is also a process.
Lab Roles and Lab Report
Project Management Managing Project Execution
The ARC Process for New Program Proposals
Service Life Extension (SLE) Request and Program Office SLE Oversight
Project to Develop a Fully Autonomous Vehicle for a Field Environment
Requirement Change Control Procedure
CS 790M Project preparation (I)
Design Process Overview
Figure 1 Carotid artery inflammation detected using 18F-FDG-PET
Planning for next Year Technical and Adaptive Challenges May 2014
مبررات إدخال الحاسوب في رياض الأطفال
CLINICAL INFORMATION SYSTEM
The 4 Functions of Management
TRD Data Analytics-GRT Planning & Implementation Request
4KB Sector Transition- Accomplished HDD Supplier IDEMA Subcommittee
FDG-PET/CT Technical Committee
Tor Kihlman, Chair CAETS Noise Control Technology Committee
Digital Reference Object Subcommittee
Developing School Improvement Plans #101
21twelveinteractive.com/ twitter.com/21twelveI/ facebook.com/21twelveinteractive/ linkedin.com/company/21twelve-interactive/ pinterest.com/21twelveinteractive/
Teams What is a team? Maintaining Focus
Dr. Mwangi Engineering and Technology
Known as the business team, the Sun Microsystems approach to concurrent or simultaneous engineering may be used during the introduction of new products.
Design Team Name Team Members
Leon River Watershed Protection Plan: Addressing EPA Comments
[Organization Name]: Sepsis Collaborative
Interpretations and Code Cases
[Organization Name]:[insert]Collaborative
Jacques LAURELUT GTE First Annual Work Programme Consultation
AICT5 – eProject Project Planning for ICT
Community Health Visioning 2017
Hydrographic Services and Standards Committee
2019 NRRA Workshop May21, 2019 AASHTO Perspective on Electronic Data Michael J. Kennerly PE Director of The Design Bureau Iowa Department of.
CS 426 CS 791z Topics on Software Engineering
Tips and Tricks to Successfully Write Business Cases
CS 426 CS 791z Topics on Software Engineering
Radiopharmaceutical Production
  Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida FDOT Research #BDK80 Task Work Order No June.
Presentation transcript:

FDG-PET/CT Technical Committee FDG-PET covariates

Objectives Define critical covariate measurements that affect FDG-PET SUV quantification Identify challenges and limitations in these covariates that affect the accuracy and/or precision of SUV measurements Develop standards for the measurement and recording of covariates Work with imaging vendors to implement in each PET/CT platform

Current status List of covariates have been established in the literature and have been summarized for this committee Preliminary list of challenges and limitations has been identified

Specific Tasks Complete consensus list of challenges/limitations in covariate measurements Discuss requested changes with each vendor representative Interact with DICOM working group to identify current initiatives that may address limitations Develop resource plan for accomplishing changes

Resources Needed Interactions with DICOM working group Engineering efforts at each PET/CT manufacturer to incorporate changes