Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.

Slides:



Advertisements
Similar presentations
With TimeCard appointments are tagged with information that converts them into time sheets. This way you can report time and expenses from inside your.
Advertisements

HelpDesk OSP Presentation HelpDesk OSP converts s into SharePoint list items HelpDesk OSP works with Office SharePoint V2 and higher
With Folder HelpDesk for Outlook, support centres and other helpdesks can work efficiently with support cases inside Microsoft Outlook. The support tickets.
With Public Folder HelpDesk for Outlook, support centres and other helpdesks can work efficiently with support cases inside Microsoft Outlook. The support.
Utility SQL Bin (v3.3). Agenda  Purpose  Target User  Benefits  System Requirement  User Guide Introduction Navigation Add New SQL Add New Version.
Templates and Styles Excel Advanced. Templates are pre- designed and formatted spreadsheets –They provide consistency of layout/structure –They.
Kanban Task Manager for Outlook ‒ Introduction
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
With TimeCard appointments are tagged with information that converts them into time sheets. This way users can report time and expenses from their Outlook.
Calendar Browser is a groupware used for booking all kinds of resources within an organization. Calendar Browser is installed on a file server and in a.
T-FLEX DOCs PLM, Document and Workflow Management.
© InLoox GmbH InLoox Web App product presentation The web client for project management on the Internet.
Kanban Task Manager Single‒ Introduction
Requirements Specification
Project 2002 A Proposal Application Project 2002 Actions.
Lesson 18: Configuring Application Restriction Policies
© InLoox GmbH InLoox PM for Outlook product presentation Project management software – integrated in Microsoft Outlook.
© InLoox ® InLoox PM Web App product presentation The Online Project Software.
The Solution xxxxxxxx.
Maintaining Windows Server 2008 File Services
1//hw Cherniak Software Development Corporation ARM Features Presentation Alacrity Results Management (ARM) Major Feature Description.
Ihr Logo Data Explorer - A data profiling tool. Your Logo Agenda  Introduction  Existing System  Limitations of Existing System  Proposed Solution.
ITGS Case Study Theatre Booking System Ayushi Pradhan.
Why use JIRA?.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
0 eCPIC User Training: Portfolios Module These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
InLoox PM Product Presentation Slide 1 InLoox PM Product Presentation © InLoox, Inc. InLoox PM 8 for Outlook Product Presentation The Project.
With Folder HelpDesk for Outlook, support centres and other helpdesks can work efficiently with support cases inside Microsoft Outlook. The support tickets.
Network and Server Basics. Learning Objectives After viewing this presentation, you will be able to: Understand the benefits of a client/server network.
Manage your projects efficiently and on a high level PROJECT MANAGEMENT SYSTEM Enovatio Projects Efficient project management Creating project plans Increasing.
Microsoft FrontPage 2003 Illustrated Complete Creating a Web Site.
 1- Definition  2- Helpdesk  3- Asset management  4- Analytics  5- Tools.
1 Finding Your Way Through a Database Exploring Microsoft Office Access.
The Ultimate SharePoint Admin Tool
Tech Level Cyber Security Lesson 7
Architecture Review 10/11/2004
Doron Orbach UCMDB Product Manager
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
DXL to PST Converter presents
Monitoring Storage Systems for Oracle Enterprise Manager 12c
The Five Secrets of Project Scheduling A PMO Approach
Key Features Advantages over PDF sharing Use Cases Clients
Maintaining Windows Server 2008 File Services
Archiving and Document Transfer Utilities
PLM, Document and Workflow Management
Computer Aided Software Engineering (CASE)
Introduction With TimeCard appointments are tagged with information that converts them into time sheets. This way you can report time.
ServiceNow Implementation Knowledge Management
Kanban Task Manager for Outlook ‒ Introduction
Make Links from your Baan System
Kanban Task Manager Single‒ Introduction
Balanced Scorecard Designer
Monitoring Storage Systems for Oracle Enterprise Manager 12c
Kanban Manager ‒ Introduction
HP Quality Center 10 Hottest Features and Project Harmonization
Increased Efficiency and Effectiveness
InLoox PM Web App product presentation
Administrative Software
Microsoft Visual Source Safe How & Why
Software Engineering I
Why Implement a Software Asset Management Plan?
Proteus Product Demo.
CAD DESK PRIMAVERA PRESENTATION.
Microsoft Office Illustrated Fundamentals
T-FLEX DOCs PLM, Document and Workflow Management.
Key Features Advantages over PDF sharing Use Cases Clients
Kanban Task Manager SharePoint Editions ‒ Introduction
Presentation transcript:

Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019

Main Purposes To expand some key concepts of the Software CMM (Capability Maturity Model) to non-software-development groups: Software Project Planning (CMM Level 2) Software Project Tracking and Oversight (CMM Level 2) Integrated Software Management (CMM Level 3) To clearly breakdown the work into tasks and effectively estimate and plan each task To provide adequate visibility into the actual effort, manpower cost and status of the tasks against the estimates and plans To achieve E-Management: Leaders can estimate and plan new project / work by referencing statistics from the Metrics Database of the similar past project / work Staff can systematically report effort data and progress status Leaders can track any staff or the whole group’s effort, manpower cost and status in any past week (traceability ensured) or for any designated period (statistics obtained) E-Communication can be easily and effectively built between leaders and staff To facilitate the project / work’s completion on-time and on-cost To create process assets to ensure the company’s long-term growth It is absolutely NOT a different form of Time Card, like PFU. 29/05/2019

Target Users Any group with a leader and at least one staff A Group can be: The whole department A project team A work team Especially beneficial for groups doing product development and subcontract work How to deploy the tool can be discussed to make better use of it 29/05/2019

Platform Software Hardware Microsoft Excel 2000 or above (With Macros enabled) Microsoft Excel 2003 is recommended (Microsoft Visual Basic 6.3 is the programming language) Hardware One file folder on a file server on the local network Or one shared folder on the local network All group members must have Read&Write access to the above folder 29/05/2019

Main Features Overall (1) Equipped with a database to store the whole group’s metrics, which contain week info, tasks, plans, effort data and status description. This metrics database achieves 3-D storage. It is called “Metricsbase” in the tool. Concurrent access to the Metricsbase over the local network by unlimited number of staff Tasks are clearly categorized and labeled on report sheets. A task can be further broken down into sub-tasks up to 6 levels (Tree-view). Two-way communication between group leader and staff: Group leader can easily view the latest effort data and status description from the staff Staff can easily get the latest task list and plan details from the group leader 29/05/2019

Main Features Overall (2) Three levels of access control (system administrator, group leader and staff) Original tool package is in a small size (around 700 KB), which consists of three files only. The leader, however, can expand it to unlimited number of files according the number of the staff in the group Unnecessary Microsoft Excel features are disabled to avoid malicious usage or accidental operation Easy version upgrade with existing data intact User friendly interfaces (most functions are just one button click away) Most instructions and help info are incorporated in the tool 29/05/2019

Main Features Overall (3) Easy installation and configuration (system administrator configures Group Report, group leader configures Staff Report) License control program is implemented No extra cost of purchasing software except Microsoft Excel No maintenance needed except the tool’s software bugs or problems Can be expanded to flexible number of reporting levels, e.g., staff  group (or staff  project), groups (or projects)  department, departments  organization 29/05/2019

Main Features For Group Leaders (1) Create, configure, re-configure, deactivate (delete) and re-activate Staff Reports from inside of the Group Report Effectively plan and re-plan projects / work on multiple report sheets All the report sheets are listed and managed on ‘Report Sheet Mgt’ sheet, where the individual report sheet can be accessed, exported, deactivated and reactivated on demand New! Retrieve consolidated metrics for the whole group on all report sheets in any past week or for any designated period and show graphical charts for contribution percentage New! Retrieve consolidated metrics for the whole group on the individual report sheet in any past week or for any designated period Easily spot individual staff’s submission time and input (effort data and status description) on the consolidated report sheet Show graphical charts for effort and manpower cost on all or designated categories on the report sheet New! 29/05/2019

Main Features For Group Leaders (2) Compare group metrics between any two designated weeks and see the differences clearly highlighted on the group report sheet Save remarks accordingly into the Metricsbase Perform keyword search to see what happened in the past on a task, a category or all tasks for the whole group Link a category or a task to a file folder or a document on the local PC or on the network Access any staff’s report from inside of the Group Report to update the report sheet templates or to retrieve metrics for the staff in any past week or for any designated period Group Report can be moved and used outside of the default folder Configure (when and where) to enable automatic Metricsbase backup to the pre-defined location Easy Group Report backup A number of other useful functions 29/05/2019

Main Features For Group Staff (1) Import the latest report sheet templates automatically upon logon and see dialogs showing the overall changes on the latest report sheets and change details on each latest report sheet template All the report sheets are listed on ‘My Report Sheets’ sheet, where the individual report sheet can be accessed, unhidden and deleted on demand New! Submit metrics to the Metricsbase on or not on a weekly basis Retrieve his/her own metrics in any past week or for any designated period (personal Metricsbase is incorporated in the Staff Report) Show effort chart for all or designated categories New! 29/05/2019

Main Features For Group Staff (2) Specify the importance level for the status to be submitted in order to draw group leader’s attention if needed Perform keyword search to see what happened in the past on a task, a category or all tasks for him/herself E-Mail Solution for non-local staff (including staff on overseas business trip) who have no access to the local network Easy Staff Report backup A number of other useful functions 29/05/2019

Main Structure 29/05/2019