SPECIALISED BLASTING By Mutale Chipoma- Explosives Engineer

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

VARIOUS WAYS OF TIMING NORMAL TIMING - BLOCK.
Build a Bridge to Get Over It!. Your Task: Four open spans need bridges. You've just been put in charge of deciding which type of bridge is best for each.
Chapter 13 Blasting Rock Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
PIPE CULVERT By CH. VENKATARAMAIAH.
Better together... we deliver SASOL CHEMICALS BASE CHEMICALS (EXPLOSIVES) MOSH - "Day of Learning" 2014.
Unit 204: Common plumbing processes
Blasting safely with proper techniques
MAI SPF MRT Minority Aids Initiative Strategic Planning Framework Management and Reporting Tool (MAI SPF MRT) HIV Cohort 7 Grantee Meeting HIV Cohort 7.
Objective To study the effect of sub surface defects in surface roughness monitoring through ultrasonic flaw detector. To study the sizing of defects.
Core Tasks Examine the blast area to ensure safety, and determine where the explosives need to be placed in order to get the job done Position the explosives.
Vibrations from blasting
OLD POLE Remediation Project FY11. Old Pole Location.
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
Aim: How does running water cause erosion? I. Erosion by running water A. Water breaks up bedrock and removes weathered and eroded rocks and soil materials.
F. 1 Design and Technology
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
BLASTING FOR REDUCED ROCK DAMAGE AND CONTROLLING STABILITY
0 Mining Methods Block 150 Level 330 Level 300 Level 270.
Predicting Fragmentation ©Dr. B. C. Paul 2000 Note – This series of slides portrays the author’s summary of knowledge commonly held by people well studied.
Ballistics Chapter 15 p
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
L.D. Dobrushin, A.G. Bryzgalin, S.D. Ventsev, and K.Yu. Korzin, S.D. Ventsev, and K.Yu. Korzin, J.G. Moon (Korea) EXPLOSIVE JOINING OF BUILDING BARS The.
DASARI SURESH ASST. MANAGER (MINING)  What is fragmentation ?  Fragmentation is the process of breaking the solid in-situ rock mass into several smaller.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
1  Cavitation در لغت به معنی حفره و بریدگی می باشد و یکی از پدیده های بسیار مهم در علم هیدرولیک می باشد.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
Welcome to the BFS Introduction to Literacy by Design: Reader’s and Writer’s Workshop.
SHORT DELAY BLASTING IN UNDERGROUND MINING
Controlled Blasting In Cutting.
Senior Course Choices What do you need to know?
Knowledge of quantities / calculating areas Knowledge of technical information, quantaties and communicating with others.
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
Chapter 16: Concrete Engineering Technical English
GROUND IMPROVEMENT TECHNIQUES
CALL/WHATSAPP
Introduction: Excavations and other engineering constructions in the ground are central to many civil and mining projects. Ground reinforcement includes.
New Technical Inspection Flow
Fire Attack and Foam (Fire Fighter I)
Five ways to wellbeing Evidence suggests there are five steps we can all take to improve our mental wellbeing. If you give them a try, you may feel happier,
INTRODUCING The “GRAB-N-GO!” Rifle Holder ™ by TAD Enterprises
Five ways to wellbeing Evidence suggests there are five steps we can all take to improve our mental wellbeing. If you give them a try, you may feel happier,
Drilling Machineries and its Usage
SI01 Construction Practices
Sound.
Hoover Dam.
Fire Fire drill.
Why are we here? The No Child Left Behind Act of 2001 requires that each Title I School hold an Annual Meeting of Title I parents for the purpose of… Informing.
Water Connects Places Year 7 Water in the World.
Forging new generations of engineers
Building Construction I Sofia Sebastian 1
Knowledge of quantities / calculating areas
Blasting safely with proper techniques
Drill cuts used in underground mines
Department of Civil Engineering
INTERACTIONS OF WAVES Interference Refraction Diffraction
Sound Energy Grab the sheet from the desk
Well Repair Installation of Well Liners
Sketching Techniques and Practice!
Hoan Bridge over Milwaukee River, circa 2010
Sketching Multiview Drawings
Welcome to the Annual Meeting of Title I Parents
MISG January 2007 Industry contact: - Alan Naismith SRK Consulting
Forging new generations of engineers
Sketching Multiview Drawings
To go on a this adventure you have to press the red words
Sketching Multiview Drawings
Forging new generations of engineers
Addition and Subtraction Strategies for addition and subtraction
Presentation transcript:

SPECIALISED BLASTING By Mutale Chipoma- Explosives Engineer Wealth Unearthed

BRIDGE ACROSS LUAPULA RIVER

BACKGROUND AEL invited to conduct blasting under water across the Luapula river A total of 8 points under water for the construction of abutment pillars were blasted. The areas to be blasted were surrounded by sheets of steel to keep the water from flowing through.

BLAST DESIGN The first area to be blasted was 16m x 16m. Drilling was achieved by pneumatic drills with hole diameters of 45mm A walk-way 1m wide was to be left around the blasted area to be used during construction Holes drilled at 1m burden and spacing Perimeter holes drilled at 0.5m around the blast area Hole depth of 1.5m

CHOICE OF EXPLOSIVES The rock at the river bed was classified as medium to soft material and powder factor was selected on this basis A technical powder factor of 0.39 kg/m3 was selected A water-proof explosive was needed because blast holes were in water Magnum bustergel 32 x 200 was selected

CHOICE OF EXPLOSIVES CONT’ND Uncharged collar of 0.5m was left in the main blast holes Holes charged with five cartridges Two cartridges tied to cordtex10 at a spacing of 0.8m centre to centre were charged in the perimeter holes. For the perimeter holes, cordtex10 was used to connect the de-coupled charge only. Initiation was done using Smartdets

CHOICE OF INITIATING SYSTEM In order to reduce vibration , single-hole firing was required Use of Smartdets was decided upon to achieve single-hole firing and to blast perimeter holes as pre-split together with the ‘production’ holes Hand lashing using buckets was employed therefore fine fragmentation required

CHALLENGES Choosing a Powder factor to produce fine fragmentation without causing damage to steel works that kept water away To reduce to minimum the blast induced vibrations so as to keep the steel works intact Communication difficulties with customer during operations as only one was able to speak English.

BLAST PATTERN

DRILLED AREA READY FOR CHARGING

CHARGING IN PROGRESS

TIMING WITH SMARTDETS

BLAST AREA CHARGED

LAST PILLAR READY FOR CHARGING

FRAGMENTATION

FRAGMENTATION

FIRST PILLAR CONSTRUCTED

PILLAR CONSTRUCTED

COMPLETED PILLARS ACROSS THE RIVER

COMPLETED BRIDGE

COMPLETED BRIDGE

CUSTOMER SIGN - OFF

WITH CUSTOMER

Thank You Thank you