Task Group G Report January 17, 2003 Month 1998 doc.: IEEE 802.11-98/xxx January 2003 Task Group G Report January 17, 2003 Matthew B. Shoemake IEEE 802.11 Task Group G (shoemake@ti.com) Matthew B. Shoemake, Texas Instruments John Doe, His Company
Letter Ballot 50 Comment Resolution Month 1998 doc.: IEEE 802.11-98/xxx January 2003 Letter Ballot 50 Comment Resolution Adopted resolutions on all 352 comments Comment resolutions are available in doc. 11-03-068r2 Matthew B. Shoemake, Texas Instruments John Doe, His Company
January 2003 Status of the Draft Based on comment resolutions, the draft has been updated to 6.1 The draft meets the 4 hour requirement to be voted on at this session Matthew B. Shoemake, Texas Instruments
January 2003 Schedule The detailed IEEE 802.11g schedule is available in document 11-03-073. As of today, current revision is 11-03-073r1 Matthew B. Shoemake, Texas Instruments
January 2003 Motion #1 Move to request a 15-day Working Group recirculation ballot on Draft 6.0 of IEEE 802.11g with an opening date of January 20, 2003 and a closing date of February 6, 2003. Passed in TGg: 30-0-1 Note: Draft updated to 6.1 during WG session. Draft 6.1 to go to ballot. Matthew B. Shoemake, Texas Instruments
January 2003 Motion #2 Move to request an 802 ExCom e-mail ballot on the question of conditional approval to forward to sponsor ballot (Procedure 10) Draft 6.0 of IEEE 802.11g. Passed TGg: 28-0-3 Note: Draft updated to 6.1 during WG session. Matthew B. Shoemake, Texas Instruments
January 2003 Motion #3 Whereas IEEE 802.11 Task Group G would like to have Sponsor Ballot comments to resolve at its March 10-14, 2003 session… Contingent upon obtain Procedure 10 approval for 802.11g and contingent upon execution of the 15-day recirculation ballot on Draft 6.0 and contingent upon meeting all the requirements of Procedure 10, reject all comments submitted on the 15-day recirculation ballot and request a 30-day Sponsor Ballot on 802.11g Draft 6.0 with a targeted starting date of February 7, 2003. Passed in TGg: 28-0-6 Note: Draft updated to 6.1 during WG session. Matthew B. Shoemake, Texas Instruments
January 2003 Motion #4 In response to the WFA letter to the IEEE 802 Executive Committee (doc. 11-03-077), move to forward the draft response in doc. 11-03-123r2 to the IEEE 802.11 Working Group. Passed in TGg: 31-0-1 Note: Working group chair to forward letter. No motion introduced or required in WG session. Matthew B. Shoemake, Texas Instruments
January 2003 Motion #5 Move to request that the ANA issue 802.11g three new status codes and one new element ID. (Status codes requested are 25-27 and element ID number requested is 50.) Passed by Unanimous Consent in TGg Matthew B. Shoemake, Texas Instruments
January 2003 Motion #6 Move to request publication of draft 6.0r1 of IEEE 802.11g immediately following the January 2003 session. Passed in TGg: 16-1-5 Note: Draft updated to 6.1 during WG session. Note: UC received to TGg editor to add line numbers to Draft 6.1. Matthew B. Shoemake, Texas Instruments
Next Meeting Objectives January 2003 Next Meeting Objectives Review and resolve Sponsor Ballot comments Update to Draft 7.0 Request a Sponsor Recirculation Ballot Matthew B. Shoemake, Texas Instruments
January 2003 Backup Matthew B. Shoemake, Texas Instruments
History of 802.11g Balloting January 2003 Matthew B. Shoemake, Texas Instruments