Task Force API Accounting Process Implementation

Slides:



Advertisements
Similar presentations
Safe System Approach Eric Howard.
Advertisements

Zdravko Oklopčić (Končar-KET, Croatia),
2 Task Force API Accounting Process Implementation Usage of Accounting process for different topologies V1.0,
Click to edit title Click to edit sub-title Task Force API Accounting Process Implementation SOMA document validation process V1.0,
Les questions orales.  ____________________________________________  ferai  _____________________________________  ________________________________________________.
Click to edit title Click to edit sub-title Task Force API Accounting Process Implementation Automatic running parts of the ENTSO-E CE accounting process.
Overview of IG ENTSO-E RGCE Accounting and Settlement
Overview of IG UCTE Accounting Appendix 2 for the IG UCTE Accounting Version 1.0; Released by ENTSO-E RGCE WG Op&Sec 30. November 2009.
Click to edit title Click to edit sub-title Task Force API Accounting Process Implementation File name convention for ENTSO-E CE Accounting and Settlement.
TracDat V4 Situational Analysis Dave Choban. Agenda Situational Analysis  Introductions  Implementation Approach  Current Assessment Status  TracDat.
Public Safety System Update. Data Redundancy Project Migrate Public Safety Systems to State Data Center Replicate Systems to Richfield Data Center Install.
Module 6 Setup for Posting. Document  In SAP, a document is an electronic record of a business transaction  Documents are the link between the business.
Synergy of Business and Technology Alba Spectrum Corporation USA/Canada: , , Europe:
Leading Edge Climbing Equipment
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Module 13 Implementing Business Continuity. Module Overview Protecting and Recovering Content Working with Backup and Restore for Disaster Recovery Implementing.
Elk Grove WD Board Meeting Water Rates Habib Isaac – Principal Gregg Tobler – Task Manager September 10, 2012.
11 © Copyright 2008 IBM Corporation. The All-Singing, All-Dancing Composite Application Doug Tidwell, IBM
ESS-VIP ICT Project Work Package III Task Force Meeting, Luxembourg, 5 March 2013.
Bryan Proctor, Account Manager. Tips and Tricks  Version of ClientSpace  Password Configuration  Document Management  Task Enhancements  Systems.
Microsoft ® Official Course Implementing Enterprise Content Management Microsoft SharePoint 2013 SharePoint Practice.
1 Documentation Progression Send To Standard Document Library Document Center – Drop Off Library – Rules Based on Content Type and Metadata routes files.
The ECOST Web-based platform for data providers and for data users.
Accounts Receivable. Topics Covered New Statement Options New Receivables report source Customer Statement panel Scheduling Statements DB Config settings.
PART1 Data collection methodology and NM paradigms 1.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
מהפכות באנגליה.
British Library Document Supply Service (BLDSS) API
[WP1] T1.2 User and Business Requirements
NSLP for Metering Configuration Signaling (Metering NSLP)
HSA Reusability Issues
1. Open any Office 2016 app, such as Word, and create a new document.
Big Data Analytics: HW#3
BUSINESS HIGH SCHOOL-ACCOUNTING II
Agenda point 7 Next steps – Roadmap
2012 סיכום מפגש 2 שלב המשכי תהליך חזוני-אסטרטגי של המועצה העליונה של הפיזיותרפיה בישראל.
EDF expectations regarding Interoperability tests
Evaluate the effectiveness of the implementation of change plans
STEM by Design – Accessible Cities. Making Melbourne Accessible
Accounting, Controlling, Treasury
Workshop on Passenger Mobility
Implementing ATML Lessons Learned
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
HingX Project Overview
Multi-National Task Force Project 2
IMPLEMENTATION PLAN AND BUSINESS CASE REPORT OUTLINE
Decision Trees ADVANTAGES:
Work Orders I will be reviewing Work Orders and addressing some problematic issues.
AAA: A Survey and a Policy- Based Architecture and Framework
Signal Conditioning.
Emerging Acquisitions Workflows: Print DDA
XRN Construction of a Meter Reading where a Converter and AMR is recorded DSG 18/06/2018 DWG 28/06/2018.
How to delete a record in before and after screenshots
ЕФЕКТИВНА РЕВИЗОРСКА ПРОГРАМА ВО ОБЛАСТА НА СППФТ
Town Hall Meeting 2011 Issues
Managing Data Updates Chuck Bailey, VP of Software Implementation and Support.
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
Additional Information
Project Nexus Workgroup
Analysis of Phone Distraction Survey
Expectations for Federal Agencies in Support if Chesapeake WIPs/TMDL
Did you know that you can open an IRA account to trade FUTURES?
Scenario Framework for the Gas Network Development Plan
Overview of Minimum Group Size Business Rules for State Accreditation
Information & Communications Technologies (ICT) Task Force
TSO Coordinating Councils
Service Requests New Proposal CSA Service Requests AA Service Requests
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Presentation transcript:

Task Force API Accounting Process Implementation MVD Exchanges: Examples with MVD Scenario V1.0, 24.8.2010

This document gives an example of SOMA exchanges EXEMPLE OF MVD SCENARIO This document gives an example of SOMA exchanges For this example, we consider two TSO A and B with the following configuration: TIE Line Accounting points: Metering Point :Main and Back up meter in both substations May 18, 2019 3

Metering data: Issues: EXEMPLE OF MVD SCENARIO From 00:00 to 3:00, the following data are recorded by the different meters: Issues: Line 1, SO A, 2:00 to 3:00: No data availlable Line 2, 1:00 to 3:00: data out of tolerence threshold May 18, 2019 4

OPTION 1: EXEMPLE OF MVD SCENARIO First exchange of SOMA documents between SOA and B: May 18, 2019 5

OPTION 1: EXEMPLE OF MVD SCENARIO Second exchange of SOMA documents: End of SOMA process May 18, 2019 6

OPTION 2: EXEMPLE OF MVD SCENARIO First exchange of SOMA documents between SOA and B: May 18, 2019 7

OPTION 2: EXEMPLE OF MVD SCENARIO Second exchange of SOMA documents: End of SOMA process May 18, 2019 8

OPTION 3: EXEMPLE OF MVD SCENARIO First exchange of SOMA documents between SOA and B: May 18, 2019 9

OPTION 3: EXEMPLE OF MVD SCENARIO Second exchange of SOMA documents: End of SOMA process May 18, 2019 10