Student Parking. Student Parking Overview Students can park in the open parking lot at L&CC (see slide) You can park in the former F Tag lots at Eisenhower.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Repaso: Unidad 2 Lección 2
1 A B C
3rd Annual Plex/2E Worldwide Users Conference 13A Batch Processing in 2E Jeffrey A. Welsh, STAR BASE Consulting, Inc. September 20, 2007.
AP STUDY SESSION 2.
1
Processes and Operating Systems
Copyright © 2013 Elsevier Inc. All rights reserved.
Lesson 11 Level 3 to 4 Booster Sequences.
David Burdett May 11, 2004 Package Binding for WS CDL.
Measurements and Their Uncertainty 3.1
Performance Management Chapter 10. Performance Management 10-2 Objectives How to View Goals View State Goals View Your LWA Goals Search Goals (including.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
CALENDAR.
Signing Plan Design - At Grade Intersections Sample Plan Set
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Media-Monitoring Final Report April - May 2010 News.
Construction Impacts Overview of Policy Changes Shuttle Changes Enforcement Faculty/Staff Changes Visitor & Event Parking Changes Resident Student Changes.
Chapter 7: Steady-State Errors 1 ©2000, John Wiley & Sons, Inc. Nise/Control Systems Engineering, 3/e Chapter 7 Steady-State Errors.
Break Time Remaining 10:00.
Factoring Quadratics — ax² + bx + c Topic
© Telcordia Technologies 2004 – All Rights Reserved AETG Web Service Advanced Features AETG is a service mark of Telcordia Technologies. Telcordia Technologies.
PP Test Review Sections 6-1 to 6-6
Maths Trail. How many hanging baskets are there in the garden? 1.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
The University of Arizona Parking Survival Guide.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Proposed Development Chapel St & Alexander Ave corner Abutting Melbourne High School.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Before Between After.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Signs, Signals, and Pavement Markings
This is our school A new part was built in 2004 to cover the need of space. A new part was built in 2004 to cover the need of space. We have got a beautiful.
FIGURE 12-1 Op-amp symbols and packages.
Converting a Fraction to %
Clock will move after 1 minute
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Copyright Tim Morris/St Stephen's School
rules of the road Click me
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
Clarke, R. J (2001) T213-01: 1 Multimedia in Organisations BUSS 213 Tutorial 1 Emergency Procedures.
Union College Commencement 2009 There are 3 plans for commencement based upon weather considerations. This is the Fair Weather Plan. See other links on.
THE LOOP Introduction to the car-line Safety is our number one priority!
Registration Administrative and Opening Remarks (Marshall Auditorium) Movement of symposium personnel to Eisenhower Auditorium.
S ATURDAY, M AY 21, 2016 | 11:00 AM N IKON AT J ONES B EACH T HEATER Molloy College COMMENCEMENT.
 How do you multiply polynomials?  1) 2x 3 (x 3 + 3x 2 – 2x + 5)  2) 3x 2 (2x 3 – x 2 + 4x – 3)  3) x(7x 2 + 4)
SPACE SHUTTLE.
UNCLASSIFIED DIRECTIONS TO MCIA MCIA, Building 2033 Barnett Avenue, Quantico, VA From the North: Take I-95 South to Exit 150A; and merge onto VA-619E/Joplin.
rules of the road Click me
TWO WEEKS OUT ONE WEEK OUT DAY OF THE EVENT HELPFUL HINTS
ANNANDALE BUSINESS SERVICES
ANNANDALE Parking and Transportation
Presentation to College Staff Proposed Parking
HISD Educational Learning Center STAFF PARKING Yellow Tag LOT
ANNANDALE Parking and NOVACard Services
ANNANDALE Parking and NOVACard Services
Presentation transcript:

Student Parking

Student Parking Overview Students can park in the open parking lot at L&CC (see slide) You can park in the former F Tag lots at Eisenhower Hall and Bell Hall (see diagram) Lots You can park at the theater, and Harney gym. However, there are no shuttle busses. Do not park in any reserved spaces, ie F, X, or handicap unless you have a pass or you will receive a ticket. Do not park along Bundle Road where it is marked no parking. The MPs are patrolling this area.

SHERMAN AVENUE F – LOT #1 F LOT #2 X LOT OPEN PARKING OPEN PARKING

B.H. E.H. C.A.R.L. LOT #2LOT #8 X LOT LOT #9 F.H. M.H. X LOT L & C F-Tag LOT #2 OPEN Parking F-Tag LOT #1 LOT #4 CAMPUS OVERVIEW ADDITIONAL INFORMATION B.H. – Bell Hall E.H. – Eisenhower Hall C.A.R.L. – Carl Library F.H. – Flint Hall M.H. – Muir Hall L & C – Lewis and Clark Center F.H. LOT

LEWIS & CLARK F LOT #2 AND OPEN PARKING LEGEND F LOT #2 OPEN PARKING Row 1 – 15 Spaces Row 2 – 38 Spaces Denotes row number signs Row 2 – 59 Spaces Row 3 – 41 Spaces Denotes entry and exit signs Row 3 – 44 Spaces Row 4 – 41 Spaces Denotes vehicle tow sign Row 4 – 18 Spaces Row 5 – 41 Spaces 40 student motorcycle spaces Row 5 – 44 Spaces Row 6 – 43 Spaces Blocked Entry Point Row 6 – 46 Spaces Row 7 – 56 Spaces Row 7 – 56 Spaces F Spaces: 282 Student Spaces: Motorcycle TOTAL SPACES: 542 NOTE: Amount of spaces shown not true to scale F LOT #2 ROW 1 ROW 2 OPEN PARKING ROW 3 ROW 4 ROW 5 ROW 6 ROW 7 ROW 3 ROW 4 ROW 5 ROW 6 ROW 7 N W E S 40 MOTORCYCLE SPACES F Lot #2

LEWIS & CLARK CENTER 100 Stimson Ave. Ft. Leavenworth, Kansas TEMPORARY CGSC VIP PARTY 12 JULY 06 MILITARY POLICE F ML Examples of new parking tags X 3657 F STAFF & FACULTY 326 PARKING

Lewis & Clark lot entry sign examples Dimensions 18 x 12 LEWIS & CLARK F - HANG TAG ONLY LEWIS & CLARK F LOT OVERFLOW LEWIS & CLARK X STICKER PARKING LEWIS & CLARK OPEN PARKING ***Old Proposals