Braze Test.

Slides:



Advertisements
Similar presentations
Peppermill Demo Bayou Woodturners Demonstrator Jim Shackelford November 2009.
Advertisements

Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Yamaha oil pump rebuild
Bruker tape (T053) analysis for Roebel cable A.Kario, B. Ringsdorf, A. Kling, B. Runtsch, A. Jung, R. Nast, W. Goldacker (KIT, ITEP) 1.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
LED Signs Installation By LED Craft Inc. P20mm Full Color LED Sign : 32” high x 90” wide Lit Box Sign: 18” high x 90” wide
The Sand Casting Process The most commonly used Casting Process, in the entire Casting Industry. Concept: The top and the bottom of the mold form the flask.
FETS – RFQ Cold Model Vacuum Braze By P. Savage 1 st May 2007.
Vocabulary Back Ground Middle Ground Foreground Silhouette Collage.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Common Woodworking Joints
Section 2:Convection in the Mantle How is heat transferred? What causes convection currents? What causes convection currents in Earth’s mantle?
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Concept Generation. Power Unit Overall Design Fin Design Modules Ease of AssemblyAir Cooling -Fins -Flow Path -H20 Changeover -1 interchangeable power.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Microwaves. History of Microwaves In 1945, Dr. Perry Spencer, a scientist, was working in a lab when he felt some heat on his hand. The heat was coming.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Tutorial on Machine vice
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Propose design changes on the diffuser unit Reason for the change:- See Marco Apollonion’s write up to the Technical Board on 7 th of Aug. 2008:- Hi Andy.
SQXF Shell & Yoke Assembly Procedure
RO400FC Forced convection hot air reflow oven. In a flexible production, what do you need for soldering of  Complex PCB’s  Soldering of fine pitch on.
FAZIA DAYS, Bologna 10-12/feb/2010, WG8, Emanuele Vanzanella (mechanics & cooling), Alfonso Boiano (electronics) ELECTRONICS HOLDER & COOLING SYSTEM Side.
Rut ‘n’ Strut Game Calls How I turn a Pot Call. Select wood that you want to use to turn Pot Calls out of, Rip it 4” wide and then Crosscut into 4” X.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Earth’s Interior (What’s down there below us?)
Biodiesel Test-Batch Mini-Processor For One or Two Liters.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
The Area Of A Trapezium. A Trapezium is any closed shape which has two sides that are parallel and two sides that are not parallel.
Setting up correctly Different types and their use
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Heat Flow Mockup - Status J. Rutherfoord 2 June 2014.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
1 L 17 - Thermodynamics [2] Science that studies the relationships between heat and work and the conversion of one into the other Science that studies.
Mirror Manufacturing Production from glass to mirror.
Indexing of Milling Machine
Journal 3/14/16 What do you think causes cracks in the sidewalk and road? Objective Tonight’s Homework To learn how heat causes objects to expand p 383:
LED Flashlight.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Learning Aid: Technical Terms for Describing Drawings
Baby-MIND Modules & Services
Lantern plans by Master Dafydd and Master Terafan
The size of a surface in square units
Cut lines Fold lines Glue tabs Different nets to produce a cube.
Step-by-step assembly instructions
LCLS-II SPQA Magnet Leads Soldering
Acrolab Ltd. – Copyright 2003 – Improving Processing of Rubber
KELVIN MAINTENANCE GUIDE
Set Up to Begin Evacuation
Valve stem “gag” mechanism
< How to assemble the Mechanical Interlock Unit AR-12M >
Heat Transfer Conduction, Convection and Radiation
Bunker Wall Design Wall ESS
2/
Single Detector Design
Color Layers Water= BLUE Crust- Continental Top= GREEN Oceanic
Presentation transcript:

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test

Braze Test Groove on one half only, 2mm wide max x 2mm deep. Stop groove short of ends. Ask for barrier stuff on inside faces. Area reducing recess – one side only. No need for support structure or clamps to retain KFs. They will do. No overall clamping structure required. Ask about two types of braze material. (One needs KFs to be plated) Get electrical conductivity of each. Did we order C101? Zirconium oxide – braze material? Give one weeks notice. Arrange for braze on a Monday – they will bake out ovens over weekend. Can take pictures and measure before goes in oven. Braze will take about 5 hrs, @1000C, @5x10-4 Provide measurement holes.

Braze Test Brazing slots to be facing downward when job assembled to improve flow Green stop-off pen used on inner faces to prevent over-flow KF’s can be tighter KF holes idealy to have braze groove around the inside or at the bottom of the hole (approx 1mm wide x 1mm deep). And/or 1mm chamfer at top of braze hole. Measurement impossible due to braze material lifting piece. Thermocouple holes – 1.7 – 1.8mm diameter x 5dp at the middle and end so that we can see the temperature of the braze interface. We actually had 8hrs at 935C, then fast cooled. NB: Had 2 goes to melt braze material.