Griffith Park Fire Draft Recovery Plan May 30, 2007 Mayor Antonio R. Villaraigosa Councilman Tom LaBonge, CD 4 General Manager Jon Kirk Mukri City of Los.

Slides:



Advertisements
Similar presentations
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Advertisements

Delivering SCIENCE AND TECHNOLOGY Through the National Science and Technology Consortium.
COUNTY OF LOS ANGELES FIRE DEPARTMENT FORESTRY DIVISION (323)
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
NATURAL RESOURCE STEWARDSHIP FOR HOMEOWNER ASSOCIATIONS Presented by: (Leader’s Name/Agency)
Illinois RC & D Introduction to R esource C onservation & D evelopment Module 2: Who are the players?
JUNE 18, 2014 BOULDER COUNTY WATERSHED COALITIONS Comprehensive Creek Planning Initiative (CCP)
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
HUNTINGTON CREEK RECOVERY PROJECT. On June 26, 2012 a lightning strike started the Seeley Fire in Emery County. The fire burned 48,050 acres, of which.
ForEverGreen Forestry National Park Service CA Interagency Fire Prevention Conference, May 6, 2010 Santa Monica Mountains Community Wildfire Protection.
Manastash Creek Corridor Habitat Enhancement and Flood Hazard Reduction Plan Kick-Off Meeting June 5, PM Hal Holmes Center.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
Department of Water Resources California Water Plan Advisory Committee December 9, 2005 Upper Feather River Integrated Regional Water Management Plan County.
HCP Implementation in Pima County, Arizona Julia Fonseca Pima County Office of Sustainability and Conservation Photo by Aaron Flesch.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
IMPROVING COAST WALK TRAIL Friends of Coast Walk Vision-Mission-Actions to Date.
WLCI Update July 23, 2010 Conserving World-class Wildlife Resources Facilitating Responsible Development.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Integrated Natural Resources Management Plan Development on Navy Installations in Southern California Coralie Cobb Natural Resources Specialist Southwest.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
New Hampshire’s State Reservations By Philip A. Bryce, Director NH Division of Forests and Lands And Kenneth M. Desmarais, Administrator Forest Management.
Trail Funding Sources & General Information
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Identifying the Role of Government in Forest Management.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
Headwaters Forest Reserve Managing by Network BLM Arcata Field Office Chris Heppe, Headwaters Manager October 7, 2010.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
Source Water Collaborative Online Partnership Tool 1 Collaboration Toolkit: Protecting Drinking Water Sources through Agricultural Conservation Practices.
Wildlife Agencies Government Organizations that Work for Wildlife.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
West Colorado River Watershed Coordinator. Purpose Coordinate Conservation Efforts Between Agencies and Organizations Projects – Moab – Price (Applicable)
PLANNING FOR SUPPRESSION REPAIR How to estimate the amount of Suppression Repair work and design your strategy to complete it.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Conservation Project Planning Carol Pilgrim. Conservation …What Does It Mean? conservation The act of preserving, guarding, or protecting; the keeping.
IMPROVING COAST WALK TRAIL Coast Walk Neighborhood Meeting with Councilmember Lightner April 22, 2011 Earth Day.
Safeguarding California: Implementation Action Plans Listening Tour October 2015.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
Metropolitan Planning Organization for Blair County (Altoona MSA) Regional Long Range Transportation Plan Draft Agency Coordination Meeting (ACM)
The Young Hoosiers Conservation Corps SYEP Best Practices- Green Jobs Indiana.
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
Helping You Care for the Land The Natural Resources Conservation Service—
U.S. Department of the Interior U.S. Geological Survey Working with the USGS 6/19/2009.
U.S. Department of the Interior U.S. Geological Survey October 22, 2015 EROS Fire Science Understanding a Changing Earth.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
Protective Agencies Natural Resources Unit Nontraditional Agriculture.
Green infrastructure includes intact forests, tree canopy, wetlands, dune systems, parks and rivers, or agricultural soils that provide clean water, air.
Careers for Graduates of OSU’s Natural Resource Ecology and Management Department.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
Public Meeting October 21,  Open House6 - 7 PM  Presentations7 - 7:50 PM  Break7: PM  Q & A8 – 9 PM  Conclude9 PM.
1 USDA Forest Service Hurricane Preparedness Data Sets Developed Southern Wildland Fire Risk Assessment GIS data sets for use during emergency response.
Monterey County Grading and Erosion Control Requirements and Enforcement Methods 1.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
What’s a joint land use study? A community-focused process Examines local issues related to land use when military installations and communities are neighbors.
Scoping Meeting April 20th 6:00 pm
Environmental Critical Areas Regulations
Griffith Park Fire Draft Recovery Plan May 30, 2007
Natural Resources Nontraditional Agriculture
Natural Resources Nontraditional Agriculture
Construction Management & Inspection
Water Supply and Water Quality Act of 2018
Washington County Parks and Open Spaces
PROPOSITION November Water Bond Act
Presentation transcript:

Griffith Park Fire Draft Recovery Plan May 30, 2007 Mayor Antonio R. Villaraigosa Councilman Tom LaBonge, CD 4 General Manager Jon Kirk Mukri City of Los Angeles Department of Recreation & Parks © losermike 2007

Overall Goal The goal of the Griffith Park Fire Recovery Plan Task Force is to develop a fire recovery plan for Griffith Park that is science- and data-based. The Recovery Plan will include fire damage and erosion control mitigation measures, as well as restoration elements that will be designed and implemented based on the results of professional assessments of damage, and potential environmental and public safety hazards resulting from the fire. The recovery planning process will involve technical experts from various government agencies and community groups, and include soliciting advice and comments from the various parks advocacy groups, the local neighborhood associations and Neighborhood Councils.

Implementation of Fire Recovery Planning Process First Steps… Assembly of Working Teams of Technical Experts on a Griffith Fire Recovery Plan Task Force Assembly of Working Teams of Technical Experts on a Griffith Fire Recovery Plan Task Force Objectives of Collaboration: Reduce Duplication of Efforts Reduce Duplication of Efforts Synchronized Efforts Synchronized Efforts Cost-Efficiency Cost-Efficiency Timeliness Timeliness Minimization of Environmental Damage Minimization of Environmental Damage Standardization of Data Collection Methods Standardization of Data Collection Methods Sharing of Resources Sharing of Resources

Collaborating Organizations FEDERAL GOVERNMENT U.S. Forest Service-Wildland Fire Leadership Council (Burned Area Emergency Response) CAL FIRE (California Department of Forestry and Fire Protection) National Park Service – Santa Monica Mountains National Recreation Area (SMMNRA) USDA Natural Resources Conservation Service (NRCS) STATE GOVERNMENT Los Angeles Regional Water Quality Control Board California Department of Fish and Game California Department of Recreation and Parks California Office of Historic Preservation Southern California Air Quality Management District University of California Cooperative Extension (Agriculture and Natural Resources

Collaborating Organizations LOCAL GOVERNMENT Los Angeles Natural History Museum Bureau of Engineering Bureau of Sanitation Bureau of Street Services Department of Animal Services Department of General Services Department of Public Works COMMUNITY Neighborhood Councils Griffith Park Master Plan Working Group Hollywood Beautification Team California Native Plant Society LA County Fire Department Environmental Affairs Department Department of Water and Power LA Fire Department LA Police Department LA Zoo Million Trees LA Los Angeles Conservation Corps TreePeople Additional Organizations to be added

Plan Assumptions Guidelines Environmental and Ecological Sensitivity Environmental and Ecological Sensitivity Public Safety Public Safety General Methodology Emergency Debris Removal Emergency Debris Removal Assessments and Planning Assessments and Planning Natural Recovery Natural Recovery Erosion Control Erosion Control Restoration Restoration

Three Phase Plan Phase 1: May – July 2007 Objectives: Assessments / Emergency Debris Removal / Erosion Control Design Objectives: Assessments / Emergency Debris Removal / Erosion Control Design Scope: Scope: Environmental and Infrastructural Assessments (Soil Burn Severity, Erosion Potential, Vegetation Burn Severity, Seed Soil Bank, Property and Public Safety, Wildlife, Cultural Resources, Park Landmarks,Watershed, Geological, Hydrological, and Infrastructure Damage) Environmental and Infrastructural Assessments (Soil Burn Severity, Erosion Potential, Vegetation Burn Severity, Seed Soil Bank, Property and Public Safety, Wildlife, Cultural Resources, Park Landmarks,Watershed, Geological, Hydrological, and Infrastructure Damage) Digital Ortho Photography Survey Digital Ortho Photography Survey GIS Map of Infrastructure, Landmarks and Resources GIS Map of Infrastructure, Landmarks and Resources Debris Cleanup Debris Cleanup Clean (E) Storm Drain Infrastructure Clean (E) Storm Drain Infrastructure Hazard Tree Removal and Rock Stabilization Hazard Tree Removal and Rock Stabilization Design for Phase 2 Erosion Control Design for Phase 2 Erosion Control

Three Phase Plan Phase 2: July - December 2007 Objectives: Mitigation: Erosion Control (Slope Stabilization/ Run-off, Debris & Soil Capture) Objectives: Mitigation: Erosion Control (Slope Stabilization/ Run-off, Debris & Soil Capture) Scope: Scope: Landmark Rehabilitation Replace/Repair Drainage Infrastructure Implement Erosion Control Measures Implement Debris Capture Measures Implement Watershed Protection Measures Trail Repairs

Three Phase Plan Phase 3: May 2007 – July 2010 Objective: Restoration Scope:Vegetation: Landscape Restoration Landscape Restoration Implement Vegetative Management Plans Implement Vegetative Management Plans Habitat Restoration Infrastructure: Habitat Restoration Infrastructure: Roadway Improvements Roadway Improvements Possible Water Infrastructure Repairs and Expansion Possible Water Infrastructure Repairs and Expansion Hogback Trail Bridge Repair and/or Replacement Hogback Trail Bridge Repair and/or Replacement Trail/Fire Roads Improvements Trail/Fire Roads Improvements Additional Drainage Infrastructure Improvements Additional Drainage Infrastructure ImprovementsStructural: Furniture & Fixture Replacement Furniture & Fixture Replacement Tregnan & Roosevelt Golf Fencing Tregnan & Roosevelt Golf Fencing Instructional Signage / Education Instructional Signage / Education

Fire Intensity Map

Data And Science-Based Planning AssessmentsDATA APPLICABILITY Team Vegetation Burn Severity Seed Soil Bank Land Survey Phase 3 Planning and Implementation Vegetation Burn Severity Survey Team Invasive Plant Management Team Landscae Design/Restoration Team Property and Public Safety Land Survey Phase 1 and 2 Planning and Implementation Emergency Debris Removal Team Land Survey Team Property and Public Safety Survey Team Public Outreach Team Cultural Resources Wildlife Watershed Phase 3 Planning and Implementation and Environmental Compliance Wildlife Survey Team Environmental Compliance Team Cultural Resources Survey Team Park Landmarks Infrastructure Damage Phase 3 Planning and Implementation Landmark Survey, Research and Rehabilitation Team Bridge, Trail, Drainage and Road Damage Assessment Team Utility Pole Damage Assessment Team Soil Burn Severity (Erosion Potential) Watershed Geological Hydrological Phase 2 Planning and Implementation Soil Burn Severity Survey Team Watershed/Geological/Hydrology Survey and Implementation Team Erosion Control Team

COMMUNITY INVOLVEMENT To volunteer or make donations, please contact: Christina Iwata Department of Recreation and Parks (213) Public agencies, or 501(c)3 non-profit organizations with an interest in assisting in fire recovery planning should direct inquiries to: Peggy Nguyen, Environmental Specialist Department of Recreation and Parks

Press Contact Info Jane Kolb Public Information Director Department of Recreation and Parks