COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
The AQ Operational Review Group ‘Mid-process’ Forum Via teleconference 4 th September 2014 “Whilst every effort is made to ensure the technical accuracy.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Version /08/2008 The AQ calculation and validation process Compiled and delivered from the xoserve AQ Team for Review Group 209 Susan Prosser & Steve.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
COR1000 Telecoms Project UK Link Committee Update May 2013.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
Rolling AQ – Initial Calculation
Distribution Workgroup 24/11/16
Options for Mod 640 Replacement
xrn4361 UK Link Future Release 2
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Market Trials ChMC 8th August 2018.
Background - Tolerance Rules
Background - Tolerance Rules
Change Management Committee – June 2019 Update
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
COR1072 Enduring Transfer and Trade Arrangements
Impacts of Project Nexus Implementation Date to AQ17
MOD 258A Demand Estimation Sample Point – Shipper Report.
DSC Change Committee Summary – 9th May
COR1072 Enduring Transfer and Trade Arrangements
Industry Shipperless & Unregistered Working Group
Mod Proposal 0268 : AQ Backstop Date
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Development modification group 194
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Lessons Learnt UKLC - November 2015
M Number Creation process
Project Nexus Workgroup
Development modification group 194
MOD 640 INVOICING VALIDATION RULES
Smart Metering Implementation Programme January 2013
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Development Work Group 0209 Straw Man Update
Review Group 208 / Development Modification Group 194
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
Unregistered and Shipperless Process
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Further Considerations
Enabling Large Scale Utilisation of Class 3
Enabling Large Scale Utilisation of Class 3
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Presentation transcript:

COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014

COR3007 Overview Appeal Window – 1st October to 31st May YY where YY = Appeal Year Ends at UK Link Programme Implementation – replaced by ‘rolling AQ’ Users will receive a ‘quota’ of Appeals they may submit: Each shipper with 1 or more but less than 50 SSP meter points in its customer portfolio on the date when the snapshot is taken by Xoserve will be allocated an allowance equivalent to the number of SSP meter points in that portfolio. Each shipper with equal to or more than 50 SSP meter points in its customer portfolio on the date when the snapshot is taken by Xoserve will be allocated 200 monthly SSP AQ appeals outside of the User AQ Review period. Any residual monthly appeal capacity from the monthly limit of 20k, will be allocated across shippers based on their portfolio share of the SSP market at a defined part of the year.

COR3007 Overview Process: Users will utilise existing Appeals process AQ Spec Calc Appeal Request Nominations Re-confirmation Quota applied at Appeal Request Note: Appeal Request not accepted Appeals

COR3007 Overview UK Link Committee UKLC are asked to note that: Implementation will not be part of a UK Link Release 6 month notice period cannot be provided Proposed notice of 3 months for rejections Implementation date as close to 1st October 2014 as possible Implementation date will not be 1st October

COR3007 Overview Implementation date: As close to 1st October 2014 as practical Implementation date yet to be agreed Impacts to Users: Use of existing processes Nomination required (even for SSP sites) Rejection codes Initial analysis indicates rejection codes required for: - Breach of quota - Outside the window of AQ appeals - Within the tolerance >20% or 4000kWh Further rejections may be identified.