Linac Coherent Light Source (LCLS)

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Trish Mast External Independent October 9, 2007 Linac Coherent Light Source (LCLS) The Rebaseline Process Trish Mast October.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II CD-1 Cost Estimate Development Diane Hatton Associate Director for Administration.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
DUSEL Beamline Working Group Meeting March 09, :00 AM – Snake Pit (WH2NE) By Dean Hoffer - OPMO.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
Lab-Wide Earned Value Management System Project Core Team Meeting September 10, 2008 Dean A. Hoffer/Elaine McCluskey.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Camera PDR/CD1 Planning 19 September 2008
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Jim Fast Pacific Northwest National Laboratory
Project Management W. J. Foyt
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Meeting of the LCLS Facilities Advisory Committee
Dave Bachman DAU / CDSC September 9, 2004
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
External Independent Review (EIR)
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
DRG Implementation Overview
Linac Coherent Light Source (LCLS)
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
John N. Galayda – Director, LCLS Construction May 13, 2009
DOE Mini-Review of the LCLS Project
LCLS Project Management
Conventional Facilities (WBS 1
Details supporting the increase
DOE Review of the LCLS Project
PMCS Approach - Past and Current Projects
DOE Review of the LCLS Project
CAD DESK PRIMAVERA PRESENTATION.
EVMS Status and Overview
LCLS-II Cryoplant Controls Workshop.
Linac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS)
Fermi Lab – 2019 CMB-S4 Workshop
LCLS Injector System Overview D. H
DOE Review of the LCLS Project
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
DOE Mini-Review of the LCLS Project
Electron Beam Systems ETC and Methodology
CF Scope, Management & Organization
DOE Status Meeting of the LCLS Project
Presentation transcript:

Linac Coherent Light Source (LCLS) 5/23/2019 Linac Coherent Light Source (LCLS) Earned Value Management System Trish Mast September 18, 2007

Project Controls Team The Plan for the Plan Critical Path

PMCS Team The PMCS group is composed of 5 Project Controls/Scheduling analysts The entire PMCS group is contract labor through Deltek, Inc. The PMCS team supports the Project Office and CAMs Trish Mast: Project Office, Undulator, Commissioning Jeff Chan: Installation Manny Abela: Injector, Linac, and E-Beam Systems Controls Jay Doubrava: Photon Systems and Photon Systems Controls Anita Malahowski: Conventional Facilities

The Plan for the Plan (or How We Spent our Summer Vacation) Initially developed offline database that represented the 2007 CR Effects which was presented at the July Lehman Review Database was called “CRFN” Used Actuals thru April 2007 2007 CR effects were calculated for Oct ’06- April ’07 Estimate to Complete reflected CR effects on future work

The Plan for the Plan July Lehman Review requested CR effects modifications plus full Estimate to Complete Database to contain complete rebaseline of ETC Rebaseline to be completed by end of August CR Effects to be isolated Lehman Review recommendations to be implemented Results to be presented at September 18th Mini Lehman Review

August Rebaseline effort broken into 3 Steps: The Plan for the Plan August Rebaseline effort broken into 3 Steps: Step 1: Update database to include actuals thru June 2007 (CRR1) Step 2: Update the Database with the Lehman CR related recommendations to produce a final “CR Effects” total (CRR2) Step 3: Implement all pending BCRs, rate updates, and baseline corrections for a comprehensive Estimate to Complete (CRR3)

Step 1 Data at last Lehman Review was presented with April Actuals For this review we have updated the data with June Actuals

Step 2 Only CR Effects will be reviewed CR Cost Impacts to 1st two quarters of FY07 CR Cost and Schedule impacts to ETC CR Effects that were realized are Schedule delays Additional marching army costs Impacted milestones Inflation/escalation Redistribution of costs from OPC to TEC Recalculation of contingency and management reserve

Step 3 Add in all pending BCRs Refine, correct and validate the ETC to fit within the allocated funding profile Finalize the plan for the transition to operations Update the overhead and escalation rates: Changes OH: OPC Labor @ 40% OH: TEC Non-Labor @ 4.32%, OPC Non-Labor @ 5.04% SLAC/LLNL Escalation rates @ 4.0%/Year ANL Escalation rates @ 4.5%/Year Validate the database and start the BOE documentation in preparation for the EIR in October Bottoms up contingency analysis and Monte Carlo Analysis was performed

Critical Path Analysis Top three critical paths were run and analyzed All constraints removed from database except Funding constraints Shutdown constraints Top three paths to CD4 were calculated Critical path to “Initiate Early Experimental Operations” calculated

Backup Slides

Detailed Cost Estimate Report (DCE)

Budget and Funding Analysis

Milestone Hierarchy Defined Level 1, 2, 3 and 4 Milestones Level 1 controlled by DOE HQ Level 2 controlled by DOE Stanford Site Office Level 3 controlled by LCLS Project Director/Deputy Project Director Level 4 controlled by System Manager Level 1-3 Milestones are under formal configuration control.

Resource Loaded Schedules

Integrated Schedules

CPR Drilldown (Level 2)

BCWS, BCWP,ACWP Report (SPA)

Obligation Report (OSCUM)

Milestone Dictionary

WBS Dictionary

Responsibility Assignment Matrix (RAM)