Modification 440 Project Nexus iGT Single Service Provision

Slides:



Advertisements
Similar presentations
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Advertisements

Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
PN UNC Workgroup Supply Point Register 25 th October 2011.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
UNC Review Group 0178 National Grid Distribution “Reclassification of SSP to Domestic only” Review Group Meeting – 22 February 2008 Chris Warner.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Project Nexus Workgroup – Invoicing 11 th August 2014.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
PN UNC Workgroup Settlement Issues 1 st November 2011.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
1 Modification 0152V Implementation Matters 25 October 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
Ofgem Switching Programme Overview
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Options for Mod 640 Replacement
PN UNC Workgroup Invoicing 4th October 2011.
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Must Read Process Guide For Shippers
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
iGT Agency Services Background
PN UNC Workgroup iGT Services
Modification th July 2008.
Connected System Exit Points Administration Options
CSEPs Reconciliation Proposals
Potential Nexus Topic: Universal Single Meter Point Supply Points
Connected System Exit Points Administration Options
UNC Modification Proposal 0362
Distribution Workgroup 8 August 2012 Joanna Ferguson
PN UNC Workgroup iGT Services
Project Nexus Workgroup
PN UNC Workgroup Settlement Overview
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Connected System Exit Points - Update
Project Nexus Workgroup
PN UNC Workgroup (Settlement topic)
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
PN UNC Workgroup iGT Services
Project Nexus Workgroup
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Invoicing Proposals 20th May 2013
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Presentation transcript:

Modification 440 Project Nexus iGT Single Service Provision The following slides set out the proposed conventions for the GT arrangements to the Connected System Exit Point (CSEP). New names are required for the connections at and within the CSEP on the iGT gas system (iGT System) and GT gas system (GT System).

Current pre-Nexus arrangements The CSEP is provided with a reference number Each iGT maintains individual meter point reference numbers for the supply meter points on the iGT System Logical Meter Numbers (LMNs) are used by the iGT and Xoserve to administer the GT arrangements to the CSEP e.g. transportation invoicing Each Larger Supply Point (LSP) has a unique LMN For Smaller Supply Points (SSP) the iGT aggregates values for each shipper and provides one LMN for each shipper’s aggregate values to Xoserve Xoserve uses the LMNs to administer GT arrangements

Current pre-Nexus arrangements The current arrangements use two reference numbers; the iGT MPRN and the LMN. The iGT MPRN is used to establish commercial arrangements with the iGT The LMN is used to establish commercial arrangements with the GT In future the iGT MPRN will be used as the reference for both iGT and GT commercial arrangements

Project Nexus arrangements To enable Shippers to use the 4 settlement products, the LMN and aggregation processes need to change. In future each supply meter point and supply point in the CSEP will be recorded individually, and where processes require, aggregation will be completed by Xoserve To make these arrangements effective new UNC defined terms are required to accurately name the physical and commercial arrangements at the CSEP. The following slides set out these new arrangements Note: GT transportation charging principles are not affected by these new naming conventions

Independent Transporter System Supply Point* and System Supply Meter Point* iGT system CSEP, against which is recorded the CSEP Supply Point* and CSEP Supply Meter Point*. These correspond to the IT System Supply Point and IT System Supply Meter Point GT system * New defined terms in UNC GT charges to this point

Naming conventions The physical Connect System Exit Point (where the iGT makes a connection to a GT pipe) is still the CSEP The point of the emergency control valve for a service pipe connection to a property on the iGT System is to be known as an Independent Transporter System Supply Meter Point*. The Independent Transporter System Supply Meter Point is also the Independent Transporter System Supply Point* for commercial arrangements. The CSEP Supply Point* and the Independent Transporter System Supply Point is a one : one relationship. I.e. a CSEP Supply Point corresponds to an Independent Transporter System Supply Point. * New defined terms in UNC

Naming conventions The CSEP Supply Meter Point* and Independent Transporter System Supply Meter Point is a one : one relationship. I.e. each Independent Transporter System Supply Meter Point corresponds to a CSEP Supply Meter Point recorded at the CSEP. The CSEP Supply Meter Point will not be a physical item it is a notional value against which GT services are provided. GT arrangements e.g. transportation charging etc are made up to the CSEP Supply Meter Point (at the CSEP) and not beyond. The Shipper will nominate the Class (product 1,2,3 or 4) for each individual CSEP Supply Point. This will be will be done by the Shipper nominating the Independent Transporter System Supply Point with the relevant Class code. This then sets the arrangements for the GT transportation for the CSEP Supply Point. * New defined term in UNC

Independent Transporter System Supply Point (MPRN 7412345678) nominated as Product 2 iGT system CSEP, against which is recorded the CSEP Supply Point and CSEP Supply Meter Point. These correspond to the IT System Supply Point and IT System Supply Meter Point GT system Shipper makes gas nominations daily to this point (here) for the Independent Transporter System Supply Point e.g. MPRN 7412345678, for GT charges Energy is allocated to this point (here) for the Independent Transporter Energy is reconciled to this point (here) for the Independent Transporter