Mechanical Removal TAME Melaleuca

Slides:



Advertisements
Similar presentations
Jack Jedwab Association for Canadian Studies September 27 th, 2008 Canadian Post Olympic Survey.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Fill in missing numbers or operations
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
1
EuroCondens SGB E.
Worksheets.
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
David Burdett May 11, 2004 Package Binding for WS CDL.
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
AYP Changes for 2007 K-20 Videoconference June 11, 2007 Presented by: JoLynn Berge OSPI Federal Policy Coordinator.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
2007 ITBS/ ITED Results Cedar Rapids Community Schools.
1 1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Frequency Tables, Stem-and-Leaf Plots, and Line Plots 7-1
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
Find the total of 5 hours 10 minutes 3 hours 23 minutes 6 hours 39 minutes Click for solution + hours minutes7214 More than 60 minutes? YES: convert 60.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Introduction to Cost Behavior and Cost-Volume Relationships
Turing Machines.
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
1 2 Teeth and Function 3 Tooth structure 4 Dental Problems.
Melaleuca Treatment Decision Tool for Homeowners Melaleuca Treatment Decision Tool for Homeowners Start This tool will help you select the right treatments.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
FLORIDA ATLANTIC UNIVERSITY - ENVIRONMENTAL MBA PROGRAM Cost of Treatment of Melaleuca quinquenervia Standing Biomass by Various Methods Jennifer Fugett.
An electron has a velocity of {image} in the positive x direction at a point where the magnetic field has the components {image} {image} and {image} What.
Sprayer Economics Gary Schnitkey University of Illinois.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
The Future of Higher Education in Further Education Colleges Swindon 17 May 2007.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Numeracy Resources for KS2
Factors Terminology: 3  4 =12
Number bonds to 10,
Melaleuca in the Everglades
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Select a time to count down from the clock above
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Background Initiated in 2004 – for update of Lygodium microphyllum Management Plan Basic Idea – find out what land managers are currently doing to control.
Urban FIA Data-- FIA core variables General stand and site characteristics Tree and sapling measurements, health, and condition Seedling data Derived estimates.
Safe and Effective Use of Herbicides for Melaleuca Control Ken Langeland UF/IFAS Agronomy Department Center for Aquatic and Invasive Plants.
Tree Removal Methods Manual, Mechanized, and Chemical.
Vegetation management: Overtopping of 8-year old planted red pine by quaking aspen (naturally regenerated) (MN)
Start Do you want to… Kill melaleuca on your property? Suppress
Presentation transcript:

Mechanical Removal TAME Melaleuca François B. Laroche South Florida Water Management District

Melaleuca Control Mechanical removal not used for melaleuca removal in natural areas. Land clearing for development, along canals, roadside, utilities ROW. Cell 17/18, comparison of herbicide and mechanical methods TAME demonstration project Melaleuca control in natural areas traditionally done with herbicide treatment methods.

Tracked Feller Buncher Cutting Trees (Cell 17/18 - 2002) Holiday Park and Prairie Pines demonstration sites Cutting head mounted on front of vehicle. Tracked feller buncher cutting trees Cell 17/18 Cutting head mounted on hydraulic arm Better maneuverability

Tracked Feller Buncher Spraying Stumps (Cell 17/18 - 2002) Gyro Track for smaller trees and saplings Spraying Tracked Feller Buncher spraying herbicide Treated stump Treated Stump Cutting head mounted with herbicide sprayer

CELL 17/18 Frill /Girdle/Cut/stump herbicide treatment, 3 years later 95% mortality Follow-up retreatment for seedlings Stumps and trunks remain Feller Buncher/Gyrotrack/ Skider/Chipper, 3 years later 90 – 95% mortality. Follow-up retreatment for seedlings

Clear-More Tree Chipper Stumper Knocking Down Trees (Cell 17/18) High selectivity and maneuverability, little non-target damage and no melaleuca left standing Separate motor for chipping head Grinds stumps into the ground 99% mortality 0 seedling recruitment Slow when trees are dense

Clear-More Tree Chipper After Treatment (Cell 17/18) Natives 3 years later Ground Rutting Ground Rutting Days after

Cell 17/18 Aerial herbicide treatment, 3 years later 99% mortality 0 seedling recruitment Follow-up treatment needed Dead trees remain standing (10 year + for decay)

Melaleuca Control Cost by Various Methods of Treatment at Cell 17/18 Feller Buncher Manual Herbicide Clearmore Chipper Aerial Acres Treated 37.5 38.5 20 80 Total Cost $99,400 $70,199.53 $75,190 $51,411.70 Cost/Acre $2,651 $1,823 $3,760 $286 Cost/Biomass $48 $40 $67 N/A Cost/Plant $0.19 $0.08 $0.22 Labor/equipment cost/acre $1068 $60 $755 $226 Time to completion 120 days 21 days 160 days 2 days

Tracked Feller Buncher Cutting Trees, (TAME) - 2004 90% mortality some seedlings, 0.3/m2 Prairie Pines Preserve, Lee Co. Prairie Pines 65% mortality some seedlings, 1.3/m2 Holiday Park Holiday Park, Broward Co. Restricted to certain trunk diameter Need second pass for small trees Somewhat selective Treat stumps with herbicide

Tracked Feller Buncher Cutting Trees, (TAME) - 2006 Prairie Pines Holiday Park

Brontosaurus, Holiday Park and Prairie Pines (TAME) 2004 High selectivity and maneuverability Does not grind stumps Holiday Park Little non-target damage and few melaleuca left standing Able to take down large trees Separate motor for chipping head Prairie Pines

Brontosaurus, Holiday Park and Prairie Pines (TAME) 2005 20-30% mortality 0 seedling recruitment Prairie Pines 50 % mortality some seedlings, 0.7/m2 Holiday Park Prairie Pines Mortality greater (less regrowth) where trees were larger or denser and mulch is therefore deeper

Brontosaurus, Holiday Park and Prairie Pines (TAME) 2006 Stump regrowth Few seedlings

Barko Chipper, Holiday Park and Prairie Pines (TAME) 2004 Coarse mulch, some stems/trunks missed by chipper once down Rubber tires Low selectivity, cannot maneuver well around natives Prairie Pines

Barko Chipper, Holiday Park and Prairie Pines (TAME) 2005 40% mortality Seedling recruitment 3/m2 Prairie Pines Holiday Park 60% mortality Damage to pine Seedling recruitment 0.7/m2

Barko Chipper, Holiday Park and Prairie Pines (TAME) 2006 Stump regrowth Few seedlings

Stump Regrowth No regrowth with Feller Buncher Brontosaurus Barko

Feller Buncher Herbicide Mechanical Removal of Melaleuca at Prairie Pines (TAME) Brontosaurus Feller Buncher Herbicide Barko Chipper Acres Treated 4.8 5.0 Total Cost $9,740 $9,980 $10,000 Cost/Acre $2,029 $2,079 $2,000 Herbicide cost/acre N/A $38 Labor Hours 23

Mechanical Removal of Melaleuca at Holiday Park (TAME) Brontosaurus Feller Buncher Herbicide Barko Chipper Acres Treated 3.8 5.0 4.0 Total Cost $7,030 $9,103 $9,900 Cost/Acre $2,211 $1,990 $2,475 Herbicide cost/acre N/A $29 Labor Hours 16

Follow up treatment required Seedling recruitment Other exotics Need herbicide and follow-up treatment Restricted (wetland areas) Not selective (under story) Tracks create rutting Costly Instant results Many types of equipment

Brown is Beautiful