Safety Readiness Review (SRR) Thomas Hansson, ESH

Slides:



Advertisements
Similar presentations
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
Advertisements

Linac Front-End R&D --- Systems Integration and Meson Lab Setup
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
ESS Vacuum Standardization
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Machine Protection Requirements and Concept Annika Nordt et al. European Spallation Source ERIC Machine Protection Review, December 2015 Lund, Sweden.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Report Technical Director Storage-Ring-Installation Completed
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Flooding Walkdown Guidance
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Lockheed Martin Canada’s SMB Mentoring Program
Testing and deployment
Ion Source and LEBT control system topology, Interlock strategy
TS2 PSS Architecture, Concepts of Operations and Interfaces
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
ISRC and LEBT Vacuum System Design
Welcome and charge to the committee
PSS0 Scope Stuart Birch 8th February 2018.
PSS0 Design & Concept of Operations
cNPM pre-CDR Concluding Remarks
Testing Coordination at ESS
Introduction and Safety Plan
PSS verification and validation
MPS commissioning at ESS
LEBT water cooling system
PSS Verification and validation
Safety Analysis and Safety Functions
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Technical Documentation Coordinator
Radiation Protection Handbook
Ola Ingemansson Electrical & Instrumentation Engineer
Machine Protection PLC Based System Verification and Validation Plan
Licensing update ESHAC #7, October 2017
Operation of Target Safety System (TSS)
Lessons from the 1st Safety Readiness Review
Test Beamline System Requirements and Charge to PDR Committee
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Critical Design Review Personnel Safety System: PSS0
Atefeh Sadeghzadeh Control engineer – Target safety and control
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Target Safety System Interfaces
ISrc & LEBT – ICS Installation Readiness Review
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

Safety Readiness Review (SRR) 2017-11-30 Thomas Hansson, ESH www.europeanspallationsource.se

Outline ESS Review Framework ESS Process for Safety Readiness Review ESS System Documentation needed prior to a SRR

ESS Review Framework, based on the Project Management Plan ESS-0091812 SRR Graphical Workflow based on draft ESS-0093443

ESS Process for Safety Readiness Review ESS-0123091 “ESS Process for Safety Readiness Review” to review the readiness to safely commission any system (and sub-systems), which could be a part of the facility or the whole facility. the scope is safety, both conventional and related to ionizing radiation. a process by which hardware, personnel and procedures associated with commissioning of the system are verified. an independent review of the safety aspects, performed after the Test Readiness Review (TRR) or corresponding activity to be performed by system owners. For instance, it is relevant to perform a Safety Readiness Review prior to the commissioning of the Ion Source (IS) and Low Energy Beam Transport (LEBT), preliminary in March 2018. involving the p-beam

ESS System Documentation needed prior to a Safety Readiness Review ESS-0177837 “ESS System Documentation prior to a SRR” Design descriptions (purpose, technical solution) Architecture description (the specific system, involved equipment, devices, etc.) Concept of Operations (scope of proposed testing, operators & disciplines, etc.) Req. Spec (test envelope limits & conditions, hazards, safety systems, etc.) Interface descriptions Integration Plan (intermediate demonstrations of supporting & safety systems) Operation & maintenance documents (the specific operator perspective) Verification Plan (detailed steps to be followed, sequence, who, when, etc.)

Example of how to describe the structure of involved systems System of interest Supporting systems HV power supply …… …… Ion source gas delivery system, plasma generator/microwave system, extraction system, isolation transformer, cooling system, vacuum systems ….. LEBT magnetic solenoids, steering magnets, slit IRIS, deflecting chopper, beam collimator, beam diagnostics instruments, gas injection system ….. Safety systems IS HV cage fence and gate ….. Shielding against ionizing radiation against electromagnetic fields ….. PSS0 detectors sensors logic circuits/equipment actuators interlocks …..

Safety Readiness Review vs. other Reviews Relevant system owners are responsible for Test Readiness Review (TRR), or corresponding, for the specific system level System Acceptance Reviews (SAR), or corresponding, for all concerned sub-systems SRR System ORR = Operation Readiness Review

Thank You! Questions?

ESS Review Framework, based on the Project Management Plan ESS-0091812 SRR Graphical Workflow based on draft ESS-0093443