DIRT PARK over view FÖRSLAG TILL EN UNGDOMS ATTRAKTION I ÄLMHULT Bakgrund Målsättning Förslag Kostnadskalkyl Tid för frågor
Core STRUCTURE Size diagram BACK
WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. A cm THICK LAYER OF SAND/DIRT. CONCRETE CORE SO THAT THE JUMP/BUMP KEEPS ITS SHAPE. BACK WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
BACK TOTAL VOLUME = 0.2m³ TOTAL GROUND AREA COVERED = 1.04m²
THESE ARROWS SHOW IN WHAT WAY/ORDER YOU ARE TO MAKE YOUR WAY AROUND THE TRACK. YOU ARE HOWEVER NOT MEANT TO RIDE TO PARTS THAT ARE ABOVE YOUR OWN PERSONAL LEVEL OF RIDING. BACK
Size diagram BACK
WHIP BOARD ADD TO TECHNICAL COURSE TECHNICAL MAIN TRACK BACK
Size diagram Core STRUCTURE BACK
A cm THICK LAYER OF SAND/DIRT. CONCRETE CORE SO THAT THE JUMP/BUMP KEEPS ITS SHAPE. WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
Sizes BACK S M L
160 cm 164,3 cm 530,1 cm 62 cm 201,5 cm TOTAL VOLUME = 3.63m³ TOTAL GROUND AREA COVERED = 8.49m² BACK
185,6 cm 272 cm 350 cm 160 cm TOTAL VOLUME = 13.86m³ TOTAL GROUND AREA COVERED = 14.3m² BACK
160 cm 550 cm 110 cm 165 cm TOTAL VOLUME = 6.78m³ TOTAL GROUND AREA COVERED = 8.8m² BACK
35 m 6 m HIGHT ABOVE GROUND = 155 cm TOTAL GROUND AREA COVERED = 70 m²
BACK
450 cm 375 cm cm 45° BACK
350 cm 450 cm 350 cm 300 cm 1100 cm BACK
1100 cm 450 cm BACK
Platform frontal 3D view PLATFORM IN PROFILE BACK
A cm THICK LAYER OF SAND/DIRT. CONCRETE CORE SO THAT THE PLATFORM KEEPS ITS SHAPE. WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH. WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
Start Platform Core structure Size BACK
Mark 1400m 2 SKÄNKES AV KOMMUNEN Eventuellt markarbete15,000 SEK Trävirke (formar)10,000 SEK Cement 42m³40,000 SEK Sand 32m 3 8,500 SEK Specielkapade träd för teknisk del 15,000 SEK (eventuell sponsring) Byggnadstid, snickeri & gjutning 25,000 SEK 100 timmar TOTAL KOSTNAD SEK (73,875) exklusive moms Kostnadskalkyl
LENGHT = MAX 70m WIDTH = MAX 25m start Större hopp Fart hinder Teknisk del kurvan LLL M MM SSS
Presentation för Älmhults kommun 25 April 2007 Bakgrund Målsättning Förslag Kostnadskalkyl Tid för frågor