Cornville Community Park Conceptual Design Recreation Area and Facility Design Class March 12, 2008
Potential Land Acquisition
Section Q (33 acres)
Add Parking
Add Perimeter Trail
Add Ramadas
Add A Community Center
Add a Playground
Add A Tennis/Basketball Court
Add A Soccer Field
Add A Baseball Field
Projected Construction Costs Community Center 75x75 = $80,000 Community Center 75x75 = $80,000 Ramadas (6) $17,000 ea = $102,000 Ramadas (6) $17,000 ea = $102,000 Group Ramada (1) $55,000 Group Ramada (1) $55,000 Tennis/Basketball 80x106 = $65,000 Tennis/Basketball 80x106 = $65,000 Playgrounds (2) 40x40 = $95,000 Playgrounds (2) 40x40 = $95,000 Ballfield (artificial turf) $750,000 Ballfield (artificial turf) $750,000 Benches 15 x $300 = $4,500 Benches 15 x $300 = $4,500 69,816 sq ft concrete ($750sq ft) walkway 4int/ 8peri= $523,620 69,816 sq ft concrete ($750sq ft) walkway 4int/ 8peri= $523,620 Parking lot 4,800 sq ft ($12 sq ft) = $57,600 Parking lot 4,800 sq ft ($12 sq ft) = $57,600 Fencing 4 chain link = $12,600 Fencing 4 chain link = $12,600 Bathrooms $100,000 Bathrooms $100,000 Lighting (20 poles) $24,000 Lighting (20 poles) $24,000 Estimated Cost $2,243,184 Estimated Cost $2,243,184 Estimated maintenance cost $13,000/acre dev & $2,500/acre open space = $240,000 per year Estimated maintenance cost $13,000/acre dev & $2,500/acre open space = $240,000 per year