Kilkenny County Council November 2018

Slides:



Advertisements
Similar presentations
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
Advertisements

Metro Muncipal Agreement Program
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Interested in Neighbourhood Planning in Cotswold District?
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
Locality Plan PROCUREMENT Project Timeline for each of the 5 sections Construction of each stage approx. 40kms Commence Construct only contract.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Sheffield Highway Maintenance PFI Project South West Community Assembly Briefing Thursday 13 th January 2011 Michael Platt – Project Director.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Presentation to Maxwell Place Homeowners Association 1.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
CEDR SG Road Safety Meeting April 6th 2005 Safey Audits. E xplanation of Audits and the Requirements at each Stage of the Audit Process. Presented by Harry.
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
STREET LIGHTING & TRAFFIC SIGNALS PRIVATE FINANCE INITIATIVE.
Flooding John Backley,OCC and The Environment Agency.
Civil Engineering. What is civil engineering? The oldest engineer processes, that deals with design, construction, and maintenance of the physical and.
Trunk Road and Motorway Tourist Signposting Policy and Guidance The New Trunk Road Policy BARRY ASPINALL TRANSPORT SCOTLAND.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
Briefing Session Temporary Traffic Arrangement at Campus Circuit For Site Formation Works at Area 39.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
Highway Maintenance – Lengthsman and other options Andy Stevenson Highways and Drainage Manager.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
1 Roads and Transport Review Tony Lear Almond Neighbourhood Partnership Business Meeting 27 th February 2013.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
OXY’s Cascade Canyon Road Road is being constructed entirely on private land owned by OXY and will have no public access Road is being constructed to significantly.
Liepaja September Liepaja September 2008 Restructuring of the Finnish Road Administration Jukka Hirvelä, DG Finnra.
Detroit River International Crossing Project March 31, 2010.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2016 Reforms, Challenges and Safety Radisson Blu Hotel, Rosses Point Road, Sligo, May.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
LoHAC Update 11 th May 2015 Kunle Kolaru, Managing Director, CVU LoHAC Central Area Contractor Manager.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Stage 2 Light Rail Transit Program “In the ground ready”
Pre-Bid/Proposal Meeting
AECOM Transport CLG Richard Corbin September 2016.
Idaho Transportation Department (ITD)
A303 Ilchester Flooding. Presentation to Somerset Rivers Authority Board meeting 26th October Sarah Lewis : Asset Manager.
Little Rapids Habitat Restoration St
Presented by: Jim Hefferan Project Director ICB Upgrade Project
Draft Transportation Element September 6, 2017
TRANSPORT TECHNOLOGY Ground transportation by road is one of the most important today as well as for freight and people, due to the great development of.
60th National Town and Country Planners’ Congress
HS2 – Catalyst for Growth HS2 Ltd 22 January 2018 Presentation to Coleshill residents INTRODUCTION   Thank Organisers. Introduce yourself [how long you.
Measure A Financial Oversight Committee August 7, 2013
Delivering East West Rail
SR422 Section 29M, Berks Co. West Shore Bypass Reconstruction
Project Comparison. Ward Shore Park Living Shoreline Project Follow Up to January 23 Presentation.
Introduction DEFINATION :-
New Public Transport Infrastructure
Preesall Underground Gas Storage Scheme
Harbour Island Force Main Replacement
Manilla Low Level Crossing Project
Engineering Department
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

Kilkenny County Council November 2018 N25 New Ross Bypass PPP Project Sean Dobbs Project Liaison Officer Kilkenny County Council November 2018

Why? Traffic – significant delays common especially at peak times New Ross Bypass PPP Scheme Why? Traffic – significant delays common especially at peak times Amenity – improvements to public spaces Network resilience - In the event of O’Hanrahan Bridge closure, significant diversion required via R700, Inistioge Bridge and Ferry Bridge

Project Timeline: 1993 – Wexford Co. Development Plan New Ross Bypass PPP Scheme Project Timeline: 1993 – Wexford Co. Development Plan 1994 – Kilkenny Co. Development Plan 1998 – NRA National Roads Needs Study 2002 - Route Selection Report published 2005 - 2006 – Bridge Options Report 2006 - 2007 – Preliminary Design Report 2007 – Application to An Bord Pleanála 2008 – Scheme Approval 2009 – New Ross Bypass combined with M11 Enniscorthy as combined PPP Scheme 2013 – New Ross Bypass to be progressed separately 2014 – Project Tendered 2015 – Preferred Bidder Identified as BAM/Iridium 2016 – PPP Contract Signed - January 2016 2019 – Construction Completion – 2019 2019 – 2044 – PPP Operation & Maintenance

New Ross Bypass PPP Scheme

Barrow Bridge – Design Considerations New Ross Bypass PPP Scheme Barrow Bridge – Design Considerations River Barrow River approx. 300m wide River Barrow Special Area of Conservation (SAC) - Pier 4 located in the River Barrow Levee and flood plain Port of New Ross Shipping channel – Requirement for 36m clearance above MHWS Topography / Ground Conditions Pink Rock Alluvial & Glacial Deposits

New Ross Bypass PPP Scheme PPP Contract Transport Infrastructure Ireland (TII) awarded the Public Private Partnership (PPP) Contract to a BAM Iridium consortium in January 2016. The PPP Co’s contractor for the works is a Joint Venture between BAM Civil Ltd and Dragados Ireland Ltd (NRJV). The road is programmed to be complete in 2019, after which the PPP Co. will continue to operate and maintain the road for a 25 year period.

Consultations with Local Authorities New Ross Bypass PPP Scheme Consultations with Local Authorities Interfaces with public road network – permitted access routes, road crossing points, road sweeping & cleaning, road conditions etc. Construction traffic management plans & speed limits for public roads Road closures & temporary diversions Design proposals for side roads Planning & environmental consultations & applications Consultations with elected representatives Concerns & complaints from local residents

Public Liaison & Relations New Ross Bypass PPP Scheme Public Liaison & Relations Public Liaison Officer representing Wexford & Kilkenny Councils Project website provides up to date information on current works, traffic management, upcoming works, contact details etc. Quarterly project newsletter circulated in public buildings & local conveniences Quarterly progress videos – see project website Project 24 hour hotline number 1800 815 672 Consultations with elected representatives Concerns & complaints from local residents

New Ross Bypass PPP Scheme Thank You