Buildings Entrance Tunnel. 5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
The ice machines are available at various capacities and can be placed where needed in the site. Capacities range from 3 to 70 tons per day. The ice is.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Project manager report paul drumm CM16 October 2006.
Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Agenda : CLIC Civil Engineering and Services (CES) WG.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Update on the Laser Beam Line
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Following 3 places are opened for visitors: 1)Nextef (New X-band Test Facility); 2)Untra-precise Machining Laboratory Clean room; 3)High Precision Measuring.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Live Animal Imaging and Analysis Core BMSB Location Nanette Wheatley, Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
 December: › Building budget document preparation › Furniture, Carpet, Paint, Blinds requests to Business Office  January: › Budget documents available.
ELENA installation progress F. Butin / ELENA collaboration.
Industrial Air Curtains in Dubai
Responsibilities of a CMO/Medical Director in Motorsport
The Next Generation of a Gamma Irradiation Facility GIF++
Minimum Set of Requirements for Suppliers
Minimum Set of Requirements for Suppliers
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
RESOURCES, SERVICES & FACILITIES CENTRAL LIBRARY
VENTILATION OF AD TARGET Kick off meeting
SKANSKA Backup Water Supply – Lessons Learned
News and brief overview of Beamline plans for the next few months
Installation status and planning
Mauro Morandin & Antoine Daël
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
Clydebank Town Centre Office.
Installation XFEL Tunnel WP 34
Far Experimental Hall Hutches Civil Construction
J. Seeman Assistant Director for PPA/LCLS
Warranty process.
5th Review Committee October 4th, 2004 Facilities and Schedule C
Jones Island Water Reclamation Facility
Presentation transcript:

5th Review Committee October 4th, 2004 Buildings, Facilities and Schedule C. Sanelli

Buildings Entrance Tunnel

Entrance Tunnel

Entrance Tunnel

Works for Chimney (VVFF request)

Works for Chimney (VVFF request)

SPARC HALL, Laser Nave

SPARC HALL Clean Room

Electric power distribution system: Public Tender: Published on the Italian Official Bulletin on September 21, 2004. Documentation to be sent before October 11, 2004.

Electric Distribution Lay-out

Laser Clean Room: Installed Note: Anti-chamber (power supply room) ready to be ordered.

Water Cooling and Air Conditioning System: Detailed Design: Completed Public Tender: Directors’ Board Authorization Requested on September 17, 2004

Cooling System Lay-out

Fire protection system: Tender Completed, Order ready, Works near to start. Radiation protection system: Tender authorized and under way

next argument: Schedule Just a moment…..