PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.

Slides:



Advertisements
Similar presentations
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
From US 17 to SR 11 and SR 11 to Cone Road FPID No
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Titusville to Edgewater Bike Loop PD&E Study
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Presented By Kyle L. Nash Director of Public Works Newberry County.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
STORMWATER MANAGEMENT PROGRAM UPDATE July 23, 2014.
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
Westbrook Village Verdict Storm Drainage & Waterline Improvements Contract Amendment for GMP No.1 Pulice Construction, Inc. ITEM 10C April 21, 2009.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Utility Extension Project
Kendall County Real Estate Tax Bill. Taxing BodyRateAmount County.5595$ Bristol Kendall FPD.5738$ Forest Preserve.1292$ Jr. College.3924$
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Cornell University Storm Water Utility Presentation to the Water Resources Council --- November 17, 2014.
The Practical & Financial Success of the Olathe Watershed Study ASFPM May 19, 2010 Presented by Brenda Macke, P.E. CDM.
Parks and Recreation Division December 15, 2009 PARK LAND ACQUISITION.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr.,PE Union County Engineer.
FY Budget Worksession Parks & Recreation Division July 13, 2015.
1 Construction Assessment Hearing October 3, 2002 Shawnee Middle School Cafeteria.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
Project NSTL Kara Clay Joshua Rucker. Purpose To revitalize North Saint Louis City and bring prosperity O Jobs O Sustainability O Long lasting Business.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Transportation Projects City Council Workshop May 14, 2013.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Alachua County Plat Review Process September 9, 2008.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Infill Master Plan October 23, 2007 Infill Master Plan October 23, 2007 Board of County Commissioners Discussion Item.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
ND Downstream Watersheds Comprehensive Detention Planning
Stormwater Management
Town of Brighton, Department of Public Works
STEAM National Parks.
Molly Kline, Project Manager
Fred George Basin Greenway
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Lake Apopka North Shore Update
Springbrook Estates Sewer Improvement Area Informational Meeting
Municipal Services Feasibility Study Millcreek City, Utah
County State Aid Needs.
Southern Delivery System
Building Relationships with Farm Bureau
MACDC Intercounty Drain Procedures Training
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
ITER-TBM Planning and Costing Meeting
Design and Engineering Services
Presentation transcript:

PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner

PARK WEST DRAIN Final Route Project Schedule Estimated Cost Apportionment Methodology

FINAL ROUTE Outlet at Winstrom Creek Perry St 168 th Ave Riley St Greenly St Quincy St Estate Dr 160 th Ave

FINAL ROUTE 21 Easements Project Length Trunkline Pipe – 5.5 Miles Branch Pipe – 2.5 Miles Ditches – 7.5 Miles Total – 15.5 Miles

PROJECT SCHEDULE Three Phases

PROJECT SCHEDULE Phase I Spring 2012 Work Includes: Perry St 168 th Ave Power Line Easement Portions of Riley St, Greenly St, & 160 th Ave

PROJECT SCHEDULE Phase II Winter Work Includes: Ottawa Beach Rd Crossing Sediment Basins

PROJECT SCHEDULE Phase III Spring 2013 Work Includes: Inlets on 168 th Ave Riley St Greenly St Quincy St Estate Drive 160 th Ave

ESTIMATED COST $5.9 million Construction Engineering Easement/Property Acquisition Legal/Administrative Costs

APPORTIONMENT METHODOLOGY Costs paid by: Park Township at-large Ottawa County at-large Landowners

APPORTIONMENT METHODOLOGY Benefit Factors Location Land Use Parcel Size Stormwater Management

APPORTIONMENT METHODOLOGY Apportionment will be based on: Acreage Within District Composite Benefit Factor