Industrial Park By: Amanda Bates, Eaton Howitt, Trevor Rawson, and Nareesa Rahman.

Slides:



Advertisements
Similar presentations
Forest Legacy Assessment of Need Identifying Future Forest Legacy Areas Governors Commission for Protecting the Chesapeake Bay through Sustainable Forestry.
Advertisements

Department of Landscape Architecture and Urban Planning College of Architecture Texas A&M University April 24, 2002 Presented By Jin Y Jun Site Selection.
CONSTRAINT ANALYSIS OF HIGH DENSITY RESIDENTIAL AREA IN YORK REGION Bradley Morris, Ehsan Akbari, Johnny Nguyen, Nikou Najafi.
Justin Prokopick, Marijana Vidackovic, Zaid Kharouba, and Boris Gusev
Existing Fairgrounds and Airport Property Master Plan Concept Board of County Commissioners August 23, 2011.
Signs, Signals, and Roadway Markings
Do you know your signs?.
Presentation by Keith Rikli December 12, 2011 Suitability of Airport Placement near Monterey California.
Ch 3. Combinations of Horizontal and Vertical Alignment Use a few criteria to identify good and bad H- and V-alignment combinations Avoid unfavorable H-
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Hyacinth Bouchard, Fana Gidey, Tomlyn Graovac, Haim Solomon.
3. 5 Combinations of Horizontal and Vertical Alignment (p ~ p
Sci. 1-3 Topographic Maps Pages
© red ©
Cost Path Analysis of Skid Trails Using GIS Laura Heath December 14, 2006 FOR 557.
Maintaining Watersheds. Next Generation Science/Common Core Standards addressed! HS‐ESS2‐5. Plan and conduct an investigation of the properties of water.
LEED ND Rating System of Green Business Council – Leadership in Energy & Environmental Design One of many GBC systems – Building Design & Construction.
TOPOGRAPHIC MAP.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
W ATER P ARKS Kevin Agyemfra Deanna Kishchuk Dan Blake Tony Lin.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
URBAN LAND-USE.
Open Space Residential Development Bylaw Town of Rehoboth.
GIS2: Geo-processing and Metadata Treg Christopher.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
GEO 441 MARCH 2012 KYLE J CHIU OLGA LUKASHEVA IVEON YVES NGOIE Constraint Analysis and Project Management for Golf Complexes.
Planning and Zoning Reform – Energy and the Environment.
Urban Planning / Transportation Engineering Project.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Exurban Growth in the United States During the past 30 years, many families have left city centers and moved to "bedroom communities." These areas offer.
LAB 2: CONSTRAINT ANALYSIS & PROJECT DEVELOPMENT PROCESSES GEO441.
AS DEMONSTRATED THROUGH THE DERIVATION OF SITES APPROPRIATE FOR A WATERPARK SEAMUS MCDOUGALL IAN MCILRAVEY KEERTHIKA LOGENDRAN ANDREW THOMPSON Constraint.
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
FRANCISCA MUNOZ JENIKKA PREMANATHAN SIOBHAN DAWKINS Site Selection: Regional Mall.
Types of descriptions and maps By: John Eisen Mr. Fabel Period 7.
BRAC RTF CGIA Progress Report July 26, BRAC RTF Task #10 CGIA role Mapping and analysisMapping and analysis Geographic Information SystemsGeographic.
Chapter 3 Section 1- Finding Locations on Earth
By: Josh T, Chujan P, Evelyn JJ. Constraints  -Wetlands (>120 m away)  -Forested (near, off)  -Highways (away)  -Roads (very quiet)  -Open Space.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Site Suitability for Lake Overholser Cassi Poor CRP 551.
Gainesville Youth Center University of Florida Department of Urban and Regional Planning URP 4273 Survey of Planning and Information Systems Spring 2003.
Road Signs & Signals. RED= DO NOT ENTER YELLOW= RIGHT OF WAY IS EXPIRING GREEN= YOU MAY ENTER THE INTERSECTION Flashing Red: Stop, Yield to traffic and.
Environmental Modeling Basic GIS Functions for Suitability Index Modeling.
Land Use In Maple Grove. What is land use? Refers to the many ways geographers categorize areas of the earth surface according to how people use the land.
Phosphorous Loading in the Blackstone Watershed Where does it come from And What can we do about it? Blackstone River User’s Conference September 18, 2012.
Constructing cross sections Starter: look at these diagrams of contour lines. 1.Describe the relief for the first 3 contours 2.Which direction would the.
Suitability Analysis in Raster GIS Combining Multiple Maps.
Earth Science Vodcast Network ESVN. Topographic Maps.
Types of Maps. Climate Maps Climate maps = give general information about the climate and precipitation (rain, snow, etc.) of a region. Cartographers,
There are several types of maps. Each show different information.
Conclusion BACKGROUND Since the basis of this analysis is not based on the skill of the offender, but rather, an inherent dependence on environmental and.
Plans for Bigfoot Research Station Jared McDonald, Allison Petsche, Kyle Wilcox.
Roads without trails Streams Mameyes Watershed Boundary Intersect Buffer 50 meters Buffer 100 meters Intersect represents all of the areas along stream.
Maps Types of Maps Folding a Map Legend of a Map Measuring Distances
Earth Fields Fields: Regions of space where there are measurable quantities of a given property at every point. Isoline: connects points of equal value.
Proposed Helicopter Pad By: Lesley Stein and Jordan Kittle.
MCE: Criteria Development and the Boolean Approach Exercise 2-7.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Potential Neighborhood Development Strategies 158 acres Close.
Topographical Mapping IGSS. Maps ► There are too many different types of maps to mention here. ► Scientists tend to use the same variety of maps to see.
Wind Potential (12% Losses)
Christian Michaelson Joe Anderson
INTRODUCTION TO MAP AND COMPASS
Finding Wind Turbine Locations in Northwest Lower Michigan
Residential Site Plan Considerations
What Color is it?.
Davie County Comprehensive Land Development Plan
Learning Objectives GOAL: understanding the structure of the Earth.
Presentation transcript:

Industrial Park By: Amanda Bates, Eaton Howitt, Trevor Rawson, and Nareesa Rahman

Goal The goal of this project is to determine possible locations of a new industrial park in the York Region area based on specific mapping constraints. An industrial Park is an area of industries that are located within close proximity to one another to minimize development costs.

Constraints associated with Industrial Parks Wetlands (150 m buffer) Forests/vegetation (120 m buffer) Watercourse (120 m buffer) Slopes (>1.2%) Residential (500 m) Parks and Recreation (500 m) Close in Proximity to… Airport (within 3 km) Major Highways (within 3 km)

Wetlands: Low, Medium, High 120 m150 m200 m

Avoidance of Wetlands 150 m distance: Blacked out areas are buffered areas (where the Industrial Park CANNOT be located). A selection of 150 m was used instead of the minimum 120 m because an Industrial site has environmental concerns in relation to pollution. Wetlands are protected areas in which cannot be developed. The buffer of 200 m was not chosen because Industrial Parks need to optimize space.

Watercourse A 120 m (low) distance was buffered away from watercourses in York Region. The white areas resemble areas in which an Industrial Park cannot locate due to any risk of pollution entering waterways. The large white section at the top of the map is Lake Simcoe which is also considered a watercourse or water body. Medium- 150m High- 200m

Forests Buffers Erased Low- 120 m Medium- 150 mHigh- 200 m

Residential Buffers Erased Low- 250 mMedium- 500 mHigh- 750 m

Parks and Recreation Buffers Erased Low- 250 mMedium 500 mHigh- 750 m

Vegetation Buffered Blue- 120m Green- 150m Red- 200 m Zoomed out perspective: Zoomed in perspective:

Avoidance of High Slopes Erased slopes of 5.5% and 13%. An Industrial Park cannot be located on a slope of greater than 1.2%. Therefore the highest slopes were individually erased and then underwent the process of overlay intersect to combine the erased buffers and delete them permanently from the map. Slope between 0% -1.2% was chosen. As it somewhat gave us flat lands and it seemed more appropriate than a steepness of 5.5% and 13%.

Visual of the intersection between high slope areas and Industrial land use The black areas represent a slope of 13% while the orange areas represent a slope of 5.5%. Industrial sites in York Region currently do not follow the correct criteria when locating sites. All green areas are current Industrial sites which intersect with associated steep slopes.

Close in Proximity to Airports Red- 3km distances: The red buffers are locations in which an Industrial Park SHOULD be located. Industrial Parks benefit from being near the airport for transportation purposes. In order to maximize space, a buffer of 3 km was used because an Industrial Park requires a lot of land. Green- 2 km distances Blue- 1 km distances

Close in Proximity to Major Highways Red- 3 km distances Chosen in order to maximize space. Industrial Parks SHOULD be located within this area for close proximity to the highway. Green- 2 km distances Blue- 1 km distances

(500m)

Final Site Location Every erased feature went through the process of overlay intersect to white out the un-preferred and unusable land. Areas within the blue and red boundaries are preferred destinations for an Industrial Park. The Red boundaries are major highways and the blue boundaries are airports. Erased features included in map: -Slopes of 5.5% and 13% (and slopes of negative values= water bodies) -Watercourses (with 120 m buffer) -Forests (with 120 m buffer) -Vegetation (with 120 m buffer) -Wetlands (with 150 m buffer) -Residential (with 500 m buffer) -Recreation and parks (120 m)

McHargs Map The white areas on the map are the only locations which meet all the constraints and lie in close proximity to airports and highways.

Preferred Site # 1 Near the intersection of Bloomington and Woodbine just seconds from highway 404

Preferred Site # 2 Close to intersection of Leslie Street and Bloomington. Minutes from Highway 404.

Preferred Site # 3 7 th Concession and 18 th Side Road. Near the Highway 400

Conclusion Site locations were determined considering the discussed constraints imposed on the construction of a potential Industrial Park. The results produced three optimal locations within the York Region area; each of these three site locations meet the appropriate criteria.