DOE Review 7-9 February, 2006 Steve Lewis

Slides:



Advertisements
Similar presentations
Steve Lewis XTOD October, 2005 UCRL-PRES LCLS Week/FAC October, 2005 Steve Lewis X-ray Transport, Optics,
Advertisements

1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Steve Lewis Direct Imager 06 Dec EPICS Controls Steve Lewis 07 December 2007 LCLS Direct Imager Final Design Review.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Steve Lewis XTOD 4-8 April, 2005 UCRL-PRES LCLS Week 4-8 April, 2005 Steve Lewis X-ray Transport, Optics, and Diagnostics:
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Steve Lewis XTOD Controls FDR 13 March 2008 XTOD Vacuum Controls Final Design Review Steve Lewis/Keith Kishiyama 13 March 2008.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Steve Lewis Gas Detector 6 December Instrumentation & Controls Steve Lewis Paul Pax Elden Ables 6 December 2006 LCLS Gas Detector.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Laser Heater Controls Overview 21 August 2008 Matt Boyes Laser Heater Controls Design Overview EPICS IOC Team Meeting Matt Boyes.
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Cryoplant Controls Installation
Cryogenic Plant Controls – Cost and Schedule
LCLS-II 2K Cold Box Controls Design Review
LUSI Coordination with LCLS
Experimental Facilities Planning
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
DOE Review May, 2005 Steve Lewis
EPICS Controls Steve Lewis 13 December 2007
Undulator System Installation
X-ray Pump-Probe Instrument
Proposed Offset Mirror System
CF Organization & Schedule
Magnet PS Controls Hardware Status
Undulator Vacuum System
John N. Galayda – Director of LCLS Construction March 30, 2009
Testing Plan and Status
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
Undulator Vacuum System
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Project Management Issues John N. Galayda, SLAC April 24, 2002
Endstation Systems, Installation Costs and Schedule J. Hastings
John Arthur – LCLS Experimental Operations
FEE Diagnostics and Commissioning
The Transition to User Operations
Coherent X-ray Imaging Instrument WBS 1.3
Conventional Facilities Status
LCLS Personnel Protection System and Beam Containment System
LCLS Week 4-8 April, 2005 Steve Lewis
X-ray Correlation Spectroscopy Instrument
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Global Controls Overview August 10, 2004
Commissioning the European XFEL cryogenic system and best practice
Project Status John N. Galayda.
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
LCLS XTOD Mechanical and Vacuum Systems; Gas Attenuator
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Lehman Review: XTOD Beam Transport
CF Scope, Management & Organization
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

DOE Review 7-9 February, 2006 Steve Lewis X-ray Transport, Optics, and Diagnostics: Controls Status DOE Review 7-9 February, 2006 Steve Lewis 1

Requirements Provide EPICS controls for XTOD Major Areas: Front End Enclosure Near Experimental Hall Tunnel Far Experimental Hall Major Technologies: Motors (instruments; slit; offset mirror) Instruments Vacuum

Naming and counting all devices Block diagrams of entire system FY05 Tasks Completed Naming and counting all devices Block diagrams of entire system Aligning XTOD controls hardware with LCLS global standards …almost Completing cost+schedule Installing (3) servers for EPICS and PLC software at LLNL

Cost Summary =5 FTEs

Design Maturity Motors: Newport XPS and Hytec will be SLAC standard Cameras: Camlink will be SLAC standard Vacuum: PLCs and I/O will be SLAC standard IOCs will be SLAC standard Instruments: undefined so far

Schedule FY06 Detailed wiring and rack layout Bring up PLC environment Install EPICS Prototype Gas Attenuator and Vacuum Prototype Motors, Cameras, and IOCs R&D on Diagnostics

Schedule FY07 FY08 Procure all H/W Configure EPICS Design Diagnostics Complete Diagnostics Commission