Truck Parking Strategy for the East West Transport Corridor WP6D Truck Stop with ITS Activity 1.

Slides:



Advertisements
Similar presentations
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
Advertisements

1 Smart Park: Real-Time Truck Parking Information Quon Kwan Program Manager FMCSA.
Kapsch TrafficCom |Urban Mobility ChargingMichael Weber1 Kapsch TrafficCom. We make traffic flow.
Vehicle-infrastructure integration: creating co-operative mobility systems and services Hearing EU Parliament, 22 January 2009 Hermann Meyer, CEO.
PROJECT CLIMEPORT Mediterranean Port’s Contribution to Climate Change Mitigation ANTONIO CEJALVO Director Agencia Valenciana de la Energía (AVEN) Projet.
Dr Russell G. Thompson Department of Civil and Environmental Engineering Urban Freight Transport, Logistics and ITS.
URBAN FREIGHT Getting kicked to the curb?. How will we live?
The Swedish delegation presents: LundaMaTs - an integrated effort of creating a sustainable environmentally friendly car traffic in the city of Lund.
Risto Kulmala 1 Guidelines for Evaluation of ITS Projects Risto Kulmala VTT Communities and Infrastructure.
Action Plan on Urban Mobility
Public transport framework plan for Buffalo City July, BUFFALO CITY MUNICIPALITY PUBLIC TRANSPORT FRAMEWORK PLAN PRESENTATION August 2008.
CITTA 5 TH Annual Conference on Planning Research Planning and Ageing Think, Act and Share Age-Friendly Cities CiViTAS-ELAN Project Development, Implementation,
Measure 26 Strategic Traffic Management Katerina Oktabcova Usti nad Labem Municipality.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
Civitas Workshop –Effective solutions for green urban transport 24 April 2012 Athens Alan Lewis, TTR on behalf of: Lars Elgaard Thomsen, Public Transport.
This project is part-financed by the European Union (European Regional Development Fund), the Finnish Ministry of Environment and the partners. Mobility.
Part-financed by the European Union Priority 2 of the BSR Programme External and internal accessibility of the BSR Ryszard Toczek, City of Gdynia.
Slide 1 WP D Integrating Mobility Management and Land Use Planning How can Mobility Management be included in the planning and building permission process.
1 London 10. October 2014 EMTA General Meeting A Danish experience: electronics for transport communication Per Gellert Director Planning.
January THE ISSUE Launch Event. Leicester. THE ISSUE Traffic- Health- Environment. Intelligent Solutions Sustaining Urban Economies. Professor.
1 EasyWay The EasyWay framework Ulrich Just, Ministry for the Environment, Construction, Transport and Europe of the State of Bremen/Germany Leader of.
Measure 27 City Centre Access Control Katerina Oktabcova Usti nad Labem Municipality.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG IIC Community Initiative concerning Transnational Co-operation on Spatial Planning
Freight flows and infrastructure in the Baltic Sea Region Presentation by Magnus Sundström, Swedish Maritime Administration Workshop on Strategy for sustainability.
Future Competence Development within Technical Communication mapping of competence level and need of competence Development Prof Viveca Asproth, PhD Ulrica.
Data user perspective: Transport data for policy assessment Svend Tøfting – Aalborg University North Denmark Region ITS Denmark.
Smart cities Rasmus Lindholm, Director, ERTICO – ITS
Dark Light Dark Light Accent Accent Accent Accent
Innovative ITS services thanks to Future Internet technologies ITS World Congress Orlando, SS42, 18 October 2011.
Jennifer Murray Traffic Forecasting Section Chief, WisDOT Metropolitan Planning Organization Quarterly Meeting July 28 th, 2015.
Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Craiova City CHUMS Changing Habits for Urban Mobility Solutions Gabriel.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
Activities of BASt in the area of ITS Dr. Christhard Gelau Bundesanstalt für Straßenwesen/Federal Highway Research Institute (BASt) Department “Automotive.
FREIGHTSUPPORTIVE LAND USE PLANNINGGUIDELINESFREIGHTSUPPORTIVE PLANNINGGUIDELINES FHWA Talking Freight Series May 18/05 Video Seminar on Context Sensitive.
1 februari 2007 Martha Brouwer (program manager Traffic Management and Public Transport) Network Operations in the Netherlands.
1 Trends in urban transport policy in the 21 st century PIMMS TRANSFER MC 2009 Almada, 24 March 2009 Giuliano Mingardo
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Effective solutions for green urban transport – Learning from CIVITAS cities 16 April 2013 Geneva Dipl. biol. Regina Lüdert, City of Stuttgart.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Task 5.5 Final report, Version 1 Rail transport solutions for North-South and East-West flows.
Swedish ports A linchpin in Swedish industry. More than 90% of Swedish foreign trade is transported through a port.
EasyWay program and acheivements Dean Herenda, Ministry of Transport – SI EasyWay Chair, Belgrade,
MarNIS Maritime Navigation and Information Services FP6 - Integrated Project.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
0 Comprehensive Traffic Managenent I2 Pilot Programme.
Developments in Denmark and looking ahead Taskforce on Road Freight Statistics, 2 nd meeting, January 28, 2016 Peter Ottosen.
BLAST Bringing Land and Sea Together 1 Hirtshals, 16 September 2010 Evert Flier, Director of the Norwegian Hydrographic Service.
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
«Six months of autonomous bus operation in the City of Trikala, Greece: Challenges, Barriers & Solutions» Mrs Mpraki Soula Civil Engineer specialized in.
(c) IRU Academy 2011 Developing professional Training in Syria: IRU Recommendation Damascus, 9 th February 2011 Haydar Özkan IRU General Delegate to the.
EasyWay - conclusion.
TfN Freight AND RAIL UPDATE
he transport development progress in Slovenia the EASYCONNECTING hint
Danish Country Report NordBalt Seminar
Opening speech Vidmantas Pumputis Head of the Traffic Safety Division
Smarter transport solutions for transport corridors
Connected Vehicle Deployment – DfT perspective
Enabling multi-modality and efficient freight logistics
Developing Resilient Freight Systems
TRB International Partnership Day January 26, 2012
LOW-CARB Workshop Brno | 25 May 2018
Oversize Strategy for creation of new oversized transport links in SBR
Projects is financed By South Baltic Cross-border
Long term strategy and structure
Information and Reservation Systems for Safe & Secure Parking
SECURITY MANAGEMENT ESPORG EXPERT Round Table
Presentation transcript:

Truck Parking Strategy for the East West Transport Corridor WP6D Truck Stop with ITS Activity 1

East West Transport Corridor

Aim of WP 6D Development of intelligent truck parking system, including ITS services, to enhance seamless traffic flows in the corridor PARTNERS Danish Road Directorate Lithuanian Road Administration Municipality of Karlshamn Municipality of Karlskrona Swedish Transport Administration

WP6D Activity 1 Truck stops within the corridor A general study to evaluate the needs for parking places for trucks along the corridor –One part of the task is to identify suitable places for intelligent parking places for trucks within the corridor –The study will found out what kind of services the drivers need and suitable intelligent systems for communication and information for the freight operators

Current Situation in the Corridor Sweden and Denmark have good coverage of possibilities to stop to follow the driving and resting time regulations Lithuania has a more moderate coverage especially outside the main nodes Truck stops in a close proximity to larger cities and ports are often overcrowded and the transport industry and truck drivers are experiencing increased road crime rates Drivers are missing information about where suitable truck stops are located resulting in daily loss of capacity

Current Situation in the Corridor

European Initiatives Accelerates the Deployment Many ongoing European initiatives are driving the development of Intelligent Truck Parking The most important initiative – ITS Action Plan together with the ITS Directive –Two of the six priority actions focus on information provision and reservation of truck parking areas Other ongoing initiatives: –EasyWay –SETPOS –LABEL

National Initiatives in the Corridor A lot of national initiatives are ongoing in the corridor - examples: –Feasibility study on public logistics centres in Lithuania –Pre study on ITS and heavy transports mapping needs and current projects in Sweden –Required improvements on truck parking in Denmark to solve the problems with lack of capacity

Needs and Behaviours of the Drivers Needs and Behaviours of drivers based on interviews: –Needs – Food, fuel, facilities, especially clean toilets –Truck stops should be located adjacent to the main road –Develop/improve information about locations –Drivers are positive to language independent harmonised signs and navigation systems to receive information about recommended truck stops –Reservation possibilities could be of interest for truck stops close to transfer nodes –Drivers plan their routes according to Driving and Resting Time Regulations

Main Challenges Capacity of truck parking along the corridor is missing especially in Lithuania Truck stops in a close proximity to larger cities and ports are often overcrowded with increasing road crime rates The drivers are missing information about where suitable truck stops are located

ITS Solutions for the Corridor – Location Information Need to develop pre- and on-trip ITS solutions with location information about the truck parking areas It is the responsibility for the Authorities to develop basic digital information about the location of truck parking areas Add pre-trip information to ferries and truck stops about suitable truck stops on the continued journey The authorities should provide harmonised and language independent signs to truck parking areas and also information about distance to the next possible truck stops

ITS Solutions for the Corridor – Information on Occupancy Level In order to provide for better transport planning, truck parking areas located in a close proximity to transfer nodes, such as ports, should provide information on its occupancy level Information should be provided by VMS and also be available online, so that service providers can create on- board solutions like smart phones applications

ITS Solutions for the Corridor - Reservation Systems Reservation systems for truck parking arent ready for the market, need to handle some basic issues first; detection, information to the drivers, etc. Experience from France and Germany, problems with basic solutions of detections –cannot deliver good and reliable information Truck parking reservation is not a priority in the corridor –better to focus on information systems and development of good and attractive truck stops

Secure Truck Parking Areas A lot of issues around the business case for secure parking (European experience) Transport industries –high value goods are probably interested in secure parking –insurance companies or transport buyers do not demand secure parking - > hauliers will not pay for it secure parking have been leaved out for the corridors truck parking strategy as it is not the task of the authorities –It is better to focus on safety features like good location and lights at the truck stops

Truck Stop Guideline for the Corridor The transport systems is not national, it is regional and European To create ONE corridor, the driver should know when to expect a possibility to stop The proposal –3 levels to meet different needs –The truck driver should have the possibility to stop, in minimum, every 30 kilometre, in the entire corridor –Each stop should at least have a toilet

Three Levels of Truck Stops Level 1: Truck Stop along the main road network with toilet (Minimum every 30 km) (Suitable for breaks) Level 2: Truck Stop with more facilities; Petrol station, Restaurant. Along the main road network (suitable for breaks and night rest) (around every 90 km) Level 3: Truck Stops around main nodes; more facilities, lighting, fence, information systems about occupation level. Management between several stops around nodes to guide the drivers (suitable for night rest and buffering traffic around industries and harbours)

Improvements of Truck Stops in the Corridor Based on the strategy following improvements need to be made

Responsibilities/Roles Roles for our proposal of three levels: –Level 1 Responsibility of the authority to provide land, toilets and pre- and on-trip information –Level 2 Authorities according to Level 1 Private operators provide petrol, restautants, shop etc. –Level 3 Can be a private operator, located next to a workshop hall, restaurant, etc. on private land Authorities need to provide pre- and on-trip information

Conclusions - Priorities To outline the results, following priorities, from the authorities perspective, are recommended: 1.Analyse the proposed guideline and implement it for the corridor, especially needed for Lithuania 2.Develop digital basic maps and databases with location information for pre-trip information solutions 3.Develop on-trip ITS solutions with information about location and occupancy information, especially around main nodes 4.Make deeper analysis and focus on the nodes to create new truck parking areas to support the drivers. This should be done in cooperation with the industry

For details visit